Excellent Heap Leach Recoveries Ema Project
Released
Released
Announcement PDF
ASX Announcement
Released 6th August 2024
EXCELLENT COLUMN LEACH RESULTS - POTENTIAL FOR
LOWER COST MINERAL PROCESSING OPTIONS AND
SCALABILITY AT EMA PROJECT
Highlights
•
63% recovery from column tests (heap leaching) of MREO (Nd/Pr/Dy/Tb) after only 18 days of
leaching followed by washing to recover residual material using magnesium sulfate
•
Recovery was calculated as the average of two extraction methodologies with the column
leaching results indicating the Company could be able to construct a rare earth process flow
sheet from mine to final product with considerably less steps and lower risk than traditional
processing routes
•
The column test results point towards the option of a low capex rare earth heap leach operation
at Ema
•
Australia’s Nuclear Science and Technology Organisation (ANSTO) completed column leaching
test work from the Ema master composite, 50 kg of collected from 12 holes and 62 samples to
determine a heap leach processing pathway which is now potentially transformational for the
company
The Company now intends to fully explore the possibilities of In-Situ leaching the Ema
mineralisation which would involve even fewer processing steps from mine to final product than
is involved in heap leaching.
•
Heap Leach Amenability
•
Column leach liquor results using magnesium sulfate returned recovery values*of;
Time Period
Nd (%)
Pr (%)
Dy (%)
Tb (%)
4 days
42
41
30
34
6 days
52
51
36
41
11 days
57
55
40
45
*Calculated based on head assay and leach liquor analysis
Final recovery based on head assay and residue analysis after 18 days of
leaching followed by washing recorded;
Combined
Recovery
63%
MREO (Nd/Pr/Dy/Tb)
•
The ore agglomerated readily in the test liquor (no additional acid was required) and the
agglomerated ore remained competent in the column test
•
Permeability of the column bed was good, with minimal bed slump of 1% calculated
•
Test conditions involved REE desorption utilising 0.5 M magnesium sulfate (MgSO4) or 0.3 M
ammonium sulfate (NH4)2SO4, ambient temperature at pH of 4.5
Acid consumption was calculated to be < 1 kg/t
•
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
Andrew Reid, Managing Director, commented:
“These results are quite stunning in their simplicity, to be able to desorb the rare earths so quickly at a high rate of
recovery is quite remarkable. The physical and chemical characteristics of the mineralisation at Ema have now been
thoroughly tested giving similar results for both slurry (tank leaching) and now heap leaching.
These heap leach results have now validated a much lower CAPEX path to production when compared to tank
leaching. The Company now intends to extend its testing regime towards in-situ leaching where we are confident of
high recoveries being achieved, with the only unknown element of clay permeability to be determined. Field and
lab work to demonstrate the permeability of the Ema mineralisation to in-situ leaching is now being planned.
Not only is the company heading towards a low CAPEX and low OPEX project setup, but the ability to get high
recoveries utilising magnesium sulfate as opposed to ammonium sulfate means the Ema project could be one of the
greenest and environmentally friendliest mines ever constructed.”
Brazilian Critical Minerals Limited (ASX: BCM) (“BCM” or the “Company”) is pleased to provide an
update on work programs from Australia’s Nuclear Science and Technology Organisation (ANSTO) with
respect to the Ema Rare Earths Project which hosts an Inferred Mineral Resource1 of 1.02Bt @ 793ppm
TREO.
Work is being undertaken by ANSTO to test different process flow sheet options with the column testing
(heap leaching) results achieving 63% recoveries of the key magnet rare earths MREO (Nd/Pr/Dy/Tb).
The results are in line with previously announced slurry leach (tank leach) results which achieved 68%2
MREO recovery.
These excellent results now highlight the deposit’s amenability to simple low-cost mineral processing
methods, such as heap leach, which can remove significant portions of a potential process flow sheet
and reduce CAPEX costs.
The Company believes there is clear potential to drive CAPEX and OPEX even lower and is now evaluating
the possibility of in-situ leaching, which if successful will demonstrate that it’s possible to achieve even
lower processing costs through simpler and scalable treatment options. Lower unit operating costs can
in turn lead to lower cut off grades which allow for the processing of additional mineralised material
from the Ema 1.02Bt Inferred mineral resource.
Heap Leach Test Work Summary
ANSTO investigated a heap leaching option through column testing (Table 1 and Figure 2). Two 50mm
diameter columns were operated with a bed height of 1.14m, with the following specifications to test
two reagents:
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
Table 1. Column testing setup specifications
0.3M Ammonium Sulfate
0.5M Magnesium Sulfate
Bed Height
1.14 m
1.14 m
Column Diameter
50 mm
50 mm
Ore mass
2,970 g
2,970 g
Reagent
(NH4)2SO4
MgSO4
Concentration
0.3 M
0.5 M
pH
4.5
4.5
Binding Addition
300 g/t
300 g/t
Irrigation Rate
5 L/m2/hr
5 L/m2/hr
This heap leach test work is a key part of the Company’s ongoing strategy to grow and progress the Ema
Inferred Mineral Resource towards development, which currently sits at 1.02Bt @ 793ppm2. The final
calculated leach liquor and residue recovery of 63% was materially in line with previously announced
slurry recovery results (Figure 1.)
The results have given the Company confidence that there is an increased likelihood that in-situ leaching
of the rare earths is now possible. This is largely feasible due to the mineralogy of the Ema mineralisation
which is almost 50% quartz and hence this sandy clay material allows for good percolation and fluid flow
at rates which could be economic.
Figure 1. Overall Project recoveries various clay hosted rare earth projects in Brazil.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
Column Leaching
Agglomeration of clay ores does not produce typical agglomerates, rather it is required to wet the ore
and bind the fines together. A small amount of binding solution was added followed by the test lixiviant
solution (at pH 4.5) to a target moisture content of ~23 wt% (Figure 2).
The two column tests were run in transparent PVC columns of 1.2 m x 50 mm (ID). A bed height of just
over 1 m was obtained by loading agglomerated ore (~3 kg dry) into the column and curing for 24 hours.
Both columns were run concurrently and were operated at room temperature.
The lixiviant solution was fed to the top of the column by peristaltic pump, with an initial target irrigation
rate of ~5 L/h/m2.
Irrigation was stopped on day 18 and draining commenced, this was followed by 2 days of washing using
tap water.
Figure 2. Column setup and agglomeration of ore at the ANSTO facility in Sydney.
References
1
Brazilian Critical Minerals (ASX:BCM) ASX Announcement “Massive Maiden Mineral Resource Estimate
for Ema Project” 22.04.24
2
Brazilian Critical Minerals (ASX:BCM) ASX Announcement “World Leading Recoveries Confirmed at Ema
Project” 07.05.24
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
Appendix 3. Company data in relation to MREE recoveries and conditions for leaching
Code
Company
Project
Head
Grade
(ppm)
MREO:TREO
(%)
MREE
recovery
(%)
BCM.ASX
BCM
Ema
965
31
68
69
48
(NH4)2SO4 4.5
ambient
62
ANSTO
ARA.TSX
Aclara
Carina
1,510
23
46
43
48
(NH4)2SO4
3
ambient
1418
SGS
Aclara (TSX:ARA) Aclara announces discovery of
168Mt ionic clay mineral resource at its Carina
Module in Goias, Brazil 12.12.24
ALV.ASX
Alvo
Minerals
Blue Brush
1,014
24
50
58
42
(NH4)2SO4
4
ambient
13
SGS
Alvo (ASX:ALV) Metallurgical Tests Confirm Bluebush
as Ionic Adsorption Clay REE Project 02.11.23
VMM.ASX
Viridis
Colossus
4,665
31
60
62
57
(NH4)2SO4
4
ambient
91
SGS
Viridis (ASX:VMM) Colossus Acheives Highest
Overall Bulk Ionic Recoveries Globally 18.04.24
MEI.ASX
Meteoric
Caldeira
3,642
23
63
63
43
(NH4)2SO4
4
ambient
101
ANSTO
NdPr
DyTb
Leaching
No. of
recovery recovery
pH Temperature
Agent
Samples
(%)
(%)
Lab
Reference
this announcement
Meteoric Resources (ASX:MEI) Metallurgical
Testwork Confirms Outstanding Ionic Clay
Recoveries for Caldeira REE Project 07.12.23
Competent Person Statement
The information in this report that relates to exploration results released by the Company to the ASX on
2 April, 22 April, 3 May and 7 May 2024 is based on information compiled by Mr. Antonio de Castro, BSc
(Hons), MAusIMM, CREA, who acts as BCM´s Senior Consulting Geologist through the consultancy firm,
ADC Geologia Ltda. Mr. de Castro has sufficient experience which is relevant to the type of deposit under
consideration and to the reporting of exploration results and analytical and metallurgical test work to
qualify as a competent person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC)
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr.
Castro consents to the report being issued in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the relevant market announcement and, in the case of mineral resource
estimate, that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcement continue to apply and have not materially changed. Refer to ASX
announcement dated 22 April 2024.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
About Brazilian Critical Minerals Ltd
Brazilian Critical Minerals Limited (BCM) is a mineral
exploration company listed on the Australian
Securities Exchange.
Its major exploration focus is Brazil, in the Apuí
region, where BCM has discovered a world class Ionic
Adsorbed Clay (IAC) Rare Earth Elements deposit. The
Ema IAC project is contained within the 781 km² of
exploration tenements within the Colider Group.
BCM has defined an inferred MRE of 1.02Bt of REE’s
with metallurgical recoveries averaging 68% MREO
some of the highest for these types of deposits
anywhere in the world.
The Company is currently converting this MRE from
Inferred into the Indicated category with an extensive
drill program which will inform the scoping study and
economic analysis due for completion in late 2024.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
Appendix 4
The following Table and Sections are provided to ensure compliance with JORC Code (2012
Edition).
JORC (2012) Table 1 – Section 1: Sampling Techniques and Data for auger hole drilling
Item
JORC code explanation
Comments
Sampling
Techniques
• Nature and quality of
sampling (eg cut channels,
random chips, or specific
specialised
industry
standard
measurement
tools appropriate to the
minerals
under
investigation, such as down
hole gamma sondes, or
handheld XRF instruments,
etc). These examples should
not be taken as limiting the
broad meaning of sampling.
• Metallurgical results are for a 49.6 kg composite
sample of 12 auger holes, from the drilling conducted
by BCM´s exploration team during 2023, conducted at
ANSTO, Sydney, Australia.
• 0.8 kg of the homogenized sample from each interval,
was used to make the composite.
• The preparation of the composite was supervised by a
BCM geologist.
• Holes were sampled using a powered auger drill (open
hole) conducted by BCM´s exploration team.
• Include
reference
to
measures taken to ensure
sample representativity and
the appropriate calibration
of any measurement tools
or systems used.
• Aspects
of
the
determination
of
mineralisation that are
Material to the Public
Report.
• Sampling was supervised by a BCM geologist or field
assistants.
• Every 1-metre sample was collected in a raffia bag in
the field and transported to the exploration shed to be
dried in the sun, prior to homogenisation.
• Samples were homogenised and subsequently riffle
split with about 1 kg sent to SGS for preparation and
analysis and a similar amount stored on site.
• 1 certified blank sample. 1 certified reference material
(standard) samples and 1 field duplicate sample were
inserted into the sample sequence for each 25 samples.
• In cases where ‘industry
standard’ work has been
done this would be
relatively
simple
(eg
‘reverse circulation drilling
was used to obtain 1 m
samples from which 3 kg
was pulverised to produce a
30 g charge for fire assay’).
In other cases more
explanation
may
be
required, such as where
there is coarse gold that has
inherent
sampling
problems.
Unusual
commodities
or
mineralisation types (eg
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
Item
JORC code explanation
Comments
submarine nodules) may
warrant
disclosure
of
detailed information.
Drilling
Techniques
• Drill type (eg core, reverse
circulation,
open-hole
hammer, rotary air blast,
auger, Bangka, sonic, etc)
and details (eg core
diameter, triple or standard
tube, depth of diamond
tails, face-sampling bit or
other type, whether core is
oriented and if so, by what
method, etc).
• Auger drilling was completed by a hand-held
mechanical auger with a 3” auger bit. The drilling is an
open hole, meaning there is a significant chance of
contamination from surface and other parts of the
auger hole. Holes are vertical and not oriented.
• The maximum depth achieved with the powered auger
was 31m, and this was only achievable if the hole did
not encounter fragments of rocks/boulders etc. sitting
within the weathered profile, and/or the water table.
Final depths were recorded accordingly to the length of
the rods in the hole.
Drill
Sample
Recovery
• Method of recording and
assessing core and chip
sample recoveries and
results assessed.
• No recoveries are recorded.
• Measures
taken
to
maximise sample recovery
and ensure representative
nature of the samples.
• The operator observes the volume of each metre and
notes any discrepancy.
• When recovery is below 75% in two sequential one
metre interval, the field crew stops the drill hole.
• No relationship is believed to exist between recovery
and grade.
• Whether a relationship
exists between sample
recovery and grade and
whether sample bias may
have occurred due to
preferential loss/gain of
fine/coarse material.
Logging
• Whether core and chip
samples
have
been
geologically
and
geotechnically logged to a
level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
• All holes were logged by BCM geologists or field
technicians, detailing the colour, weathering,
alteration, texture and any geological observations.
Care is taken to identify transported cover from in-situ
saprolite/clay zones and the moisture content. Logging
was done to a level that would support a Mineral
Resource Estimate.
• Whether
logging
is
qualitative or quantitative
in nature. Core (or costean,
channel, etc) photography.
• The entire auger hole is logged.
• Qualitative logging with systematic photography of the
stored box.
• The total length and
percentage of the relevant
intersections logged.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
Item
JORC code explanation
Comments
SubSampling
Techniques
and
Sampling
Procedures
• If core, whether cut or sawn
and whether quarter, half
or all core taken.
• The composite sample was prepared in the Apui
• If non-core, whether riffled,
tube sampled, rotary split,
etc and whether sampled
wet or dry.
• For all sample types, the
nature,
quality
and
appropriateness of the
sample
preparation
technique.
•
• Quality control procedures
adopted for all subsampling
stages
to
maximise representativity
of samples.
•
• Measures taken to ensure
that the sampling is
representative of the in-situ
material
collected,
including
for
instance
results
for
field
duplicate/second-half
sampling.
• Whether sample sizes are
appropriate to the grain size
of the material being
sampled.
Quality of
Assay Data
and
•
• The nature, quality and
appropriateness of the
assaying and laboratory
procedures
used
and
•
exploration facility with 0.8 kg of each mineralized
interval previously homogenized from 12 auger holes,
then homogenised and split in three plastic bags which
were then sealed prior to shipment to Catalão and then
to ANSTO by regular mail.
The 0.8 kg sample size is adequate to represent each
individual samples in the composite.
At ANSTO the homogenised sample was
screened/crushed to 100% passing 1 mm and rotary
split into representative portions for head assay,
screening and desorption testing. Samples for head
assay and desorption testing were pulverised.
6 aliquots used for the first diagnostic ammonium
sulfate leaching, under different parameters for the
ammonium sulfate concentration and pH, all for 2
hours in ambient temperature and pressure.
2 aliquots of 1.5kg were used for the 2 column leach
tests, one with ammonium sulfate and the other with
magnesium sulfate, in ambient temperature and
pressure with Ph 4.5, completed in 14 days.
• Auger sampling procedure is completed in the
exploration shed in Apui.
• The entire one metre sample is bagged on site, in a
raffia bag which is transported to the exploration shed,
where it is naturally dried prior to homogenisation,
then quartered to about 1kg to go to SGS and another
1kg to store on site.
• The composite sample was from the 1 kg sample stored
on site.
• Sample preparation for the composite, such as
pulverization and homogenization of the 49.6 kg was
conducted at ANSTO.
• Sample preparation for assay the auger samples was
conducted at SGS Vespasiano (greater Belo Horizonte)
comprising oven drying, crushing of entire sample to
75% < 3 mm followed by rotary splitting and
pulverisation of 250 to 300 g at 95% minus 150#
• The <3 mm rejects and the 250-300 g pulverised
sample were returned to BCM for storage, after all
assays were reported.
• The assays for REE in the ammonium solution from the
6 leaching tests and the column leach tests for the head
grade were conducted by ANSTO.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
Item
Laboratory
Tests
JORC code explanation
whether the technique is
considered partial or total.
• For geophysical tools,
spectrometers, handheld
XRF instruments, etc, the
parameters
used
in
determining the analysis
including instrument make
and model, reading times,
calibrations factors applied
and their derivation, etc.
• Nature of quality control
procedures adopted (eg
standards,
blanks,
duplicates,
external
laboratory checks) and
whether acceptable levels
of accuracy (ie lack of bias)
and precision have been
established
Comments
• All data reported from ANSTO were in elemental form
including the TREY and presented in this
announcement as received.
• ALS introduced its own QA/QC controls, incorporating
standards, blanks and duplicates.
• The ALS method for analysis of REEs in solution was
ME-MS02 (ICP-MS) and for head assay was ME-MS81
(lithium tetraborate fusion digest/ICP-MS finish).
Gangue elements in solution were assayed by ICP-OES
at ANSTO and gangue elements in the head sample by
XRF at ANSTO.
• 1 blank sample. 1 certified reference material
(standard) sample and 1 field duplicate sample were
inserted by BCM into each 25-sample sequence.
• Standard laboratory QA/QC procedures were followed.
including inclusion of standard. duplicate and blank
samples.
• The assay results of the standards fall within acceptable
tolerance limits and no material bias is evident.
• The assay technique at SGS used for REE’s was lithium
tetaborate fusion / ICP-MS finish (SGS code ICP95A and
IMS95A). This is a recognised industry standard
analysis technique for REE suite and associated
elements. Elements analysed at ppm levels:
Ba Ce Co Cs Dy Er Eu Ga
Gd Hf Ho La Lu Nb Nd Pr
Rb Sm Sn Sr Ta Tb Th Tm
U
V
W Y
Yb Zr
Zn Co
Cu Ni
The sample preparation and assay techniques used
are industry standard and provide total analysis.
The ICP95A reports the major elements oxides used to
calculate the Chemical Index of Alteration (CIA) at %
levels:
Al2O3
CaO
Cr2O3
F2O3
K2O
MgO
MnO
Na2O
P2O5
SiO2
TiO2
• The SGS laboratory used for the RRE assays is ISO 9001
and 14001 and 17025 accredited.
• Analytical standard for REE ITAK-705 was used as CRM
material in the batches sent to SGS.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
Item
JORC code explanation
Comments
• The assay results for the standards were consistent
with the certified levels of accuracy and precision and
no bias is evident.
• The blanks used contain some REE. with critical
elements Ce. Nd. Dy and Y present in small quantities.
• Duplicate samples were allocated separate sample
numbers and submitted with the same analytical batch
as the primary sample. Variability between duplicate
results is considered acceptable and no sampling bias
is evident.
• Laboratory inserted standards. blanks and duplicates
were analysed as per industry standard practice. There
is no evidence of bias from these results.
Verification
of Sampling
and
Assaying
• The
verification
of
significant intersections by
either independent or
alternative
company
personnel.
• The use of twinned holes.
• Documentation of primary
data,
data
entry
procedures,
data
verification, data storage
(physical and electronic)
protocols.
• Discuss any adjustment to
assay data.
• No independent or alternative verification of sampling
and assaying procedures was carried out.
• The metallurgical report was sent directly to BCM´s MD
in Australia.
• Analytical results for REE were supplied digitally,
directly from the SGS laboratory in Vespasiano to
BCM’s Exploration Manager in Rio de Janeiro.
• No twinned holes were used.
• Geological data was logged onto paper and transferred
to Excel spreadsheets at end of the day and then
transferred into the drill hole database. Microsoft
Access is used for database storage and management
and incorporates numerous data validation and data
integrity checks. All assay data is imported directly into
the Microsoft Access database.
• No adjustments were made to the data.
• All REE assay data received from the laboratory in
element form is unadjusted for data entry.
• Conversion of elements analysis (REE) to stoichiometric
oxide (REO) was undertaken by spreadsheet using
defined
conversion
factors.
(Source:https://www.jcu.edu.au/advanced-analyticalcentre/resources/element-to-stoichiometric-oxideconversion-factors).
Element ppm
Ce
Dy
Er
Eu
Conversion
Factor
1.2284
1.1477
1.1435
1.1579
Oxide Form
CeO2
Dy2O3
Er2O3
Eu2O3
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
Item
JORC code explanation
Comments
Gd
1.1526
Gd2O3
Ho
1.1455
Ho2O3
La
1.1728
La2O3
Lu
1.1371
Lu2O3
Nd
1.1664
Nd2O3
Pr
1.2082
Pr6O11
Sm
1.1596
Sm2O3
Tb
1.1762
Tb4O7
Tm
1.1421
Tm2O3
Y
1.2699
Y2O3
Yb
1.1387
Yb2O3
Rare earth oxide is the industry accepted form for
reporting rare earths. The following calculations are
used for compiling REO into their reporting and
evaluation groups:
TREO (Total Rare Earth Oxide) = La2O3 + CeO2 +
Pr6O11 + Nd2O3 + Sm2O3 + Eu2O3 + Gd2O3 + Tb4O7
+ Dy2O3 + Ho2O3 + Er2O3 + Tm2O3 + Yb2O3 + Y2O3 +
Lu2O3
LREO (Light Rare Earth Oxide) = La2O3 + CeO2 +
Pr6O11 + Nd2O3
HREO (Heavy Rare Earth Oxide) = Sm2O3 + Eu2O3 +
Gd2O3 + Tb4O7 + Dy2O3 + Ho2O3 + Er2O3 + Tm2O3 +
Yb2O3 + Y2O3 + Lu2O3
CREO (Critical Rare Earth Oxide) = Nd2O3 + Eu2O3 +
Tb4O7 + Dy2O3 + Y2O3
(From U.S. Department of Energy, Critical Material
Strategy, December 2011)
MREO (Magnetic Rare Earth Oxide) = Nd2O3 + Pr6O11
+ Tb4O7 + Dy2O3
NdPr = Nd2O3 + Pr6O11
DyTb = Dy2O3 + Tb4O7
In elemental from the classifications are:
TREE:
La+Ce+Pr+Nd+Sm+Eu+Gd+Tb+Dy+Ho+Er+Tm+Tb+Lu+Y
HREE: Sm+Eu+Gd+Tb+Dy+Ho+Er+Tm+Tb+Lu+Y
CREE: Nd+Eu+Tb+Dy+Y
LREE: La+Ce+Pr+Nd
Location of
Data Points
• Accuracy and quality of
surveys used to locate drill
holes (collar and down-hole
• Auger collar locations were surveyed initially by GPS, at
an estimated accuracy of 2m.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
Item
JORC code explanation
Comments
surveys), trenches, mine
workings
and
other
locations used in Mineral
Resource estimation.
• Specification of the grid
system used.
• Quality and adequacy
topographic control.
of
• Posterior to the end of the drilling campaign, the collar
locations were picked up by a licensed surveyor using a
Trimble total station (+/- 5cm), referenced to a
government survey point. All drill holes have been
checked spatially in 3D.
• The grid system used for all data types in a UTM
projection is SIRGAS Zone 21 Southern Hemisphere. No
local grids are used.
• The auger holes collar coordinates for the holes used in
the resource estimation were surveyed to subdecimetre accuracy by a licenced surveyor.
Data
Spacing
and
Distribution
• Data spacing for reporting
of Exploration Results.
• Whether the data spacing
and distribution is sufficient
to establish the degree of
geological
and
grade
continuity appropriate for
the Mineral Resource and
Ore Reserve estimation
procedure(s)
and
classifications applied.
• Whether
compositing
applied.
Orientation
of Data in
relation to
Geological
Structure
has
• Auger holes were over 200m to 800m apart, designed
for testing iREE mineralisation over the mapped felsic
volcanics.
• The data spacing and distribution is sufficient to
establish the level of REE elements present in the
target area and its continuity along the regolith profile
appropriate for a Mineral Resource.
• No sample composition was applied.
sample
been
• Whether the orientation of
sampling achieves unbiased
sampling
of
possible
structures and the extent to
which this is known,
considering the deposit
type.
• The location and depth of the sampling is appropriate
for the deposit type.
• Relevant REE values are compatible with the
exploration model for ionic REEs.
• No relationship between mineralisation and drilling
orientation is known at this stage.
• If the relationship between
the drilling orientation and
the orientation of key
mineralised structures is
considered
to
have
introduced a sampling bias,
this should be assessed and
reported if material.
Sample
security
• The measures taken to
ensure sample security.
• The auger samples in sealed plastic bags were sent
directly to SGS by bus and then airfreight. The Company
has no reason to believe that sample security poses a
material risk to the integrity of the assay data.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
Item
Audit or
Reviews
JORC code explanation
Comments
• The results of any audits or
reviews
of
sampling
techniques and data.
• The sampling techniques and data have been reviewed
by the Competent Person and are found to be of
industry standard.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 6th August 2024
JORC (2012) Table 1 - Section 2: Reporting of Exploration Result
Criteria
Mineral
Tenement
and Land
Tenure St
Share your feedback
Discover