EMA EMERGES AS A GLOBALLY SIGNIFICANT ISR
RARE EARTH PROJECT
Indicated Mineral Resource surges 58%-
positioning Ema among the world’s largest ionic clay deposits
Highlights
• Tier-1 Scale Achieved - Ema is now established as one of the largest ionic clay adsorption (IAC)
rare earth deposits globally, and the only known ISR-ready rare earth project in the western
world
• Material Resource Growth - Updated JORC 2012 Mineral Resource Estimate (Indicated +
Inferred) now stands at 1.07 billion tonnes @ 732 ppm TREO (>500 ppm cut-off)
• High-Confidence Resource Expansion - Indicated Resource increased 58% to 392 Mt @ 773
ppm TREO, significantly de-risking future development
• Premium Magnet Metal Uplift -
o Indicated NdPr grade increased 5% to 184 ppm
o Indicated DyTb grade increased 6% enhancing exposure to high-value magnet rare
earths
• Near-Term Development Pathway - Bankable Feasibility Study now ~80% complete, with
delivery targeted in Q2
• Low-Cost, Scalable Mining Advantage - Mineralisation is near-surface and highly amenable to
in-situ recovery (ISR), the same low-cost extraction method responsible for the majority of
global ionic clay REE supply
To view the video of MD, Andrew Reid, discussing this announcement, click on the link below
https://braziliancriticalminerals.com/link/PKN4gr
Andrew Reid, Managing Director, commented:
“This resource upgrade marks a pivotal step in establishing Ema as a globally significant rare earth
project. With over one billion tonnes defined and a substantial increase in high-confidence indicated
material, we are rapidly de-risking the project while maintaining strong exposure to high-value magnet
rare earths.
Importantly, Ema’s scale and near-surface geometry, combined with its suitability for in-situ recovery,
position it as a potential low-cost, long-life supplier at a time when secure, western rare earth supply
has never been more critical. As we move toward completion of our Bankable Feasibility Study, we
believe Ema is emerging as one of the most compelling development assets in the sector.”
Brazilian Critical Minerals Limited (ASX: BCM) (“BCM” or the “Company”) is pleased to announce an
update Mineral Resource Estimate (MRE) for the Ema project, forming part of the Company´s wholly
owned REE projects, Apuí, Amazon, Brazil. At a cut-off of 500ppm the global indicated + inferred MRE
contains 1.07Bt @ 732 ppm TREO.
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Table 1. Ema REE Project 2026 JORC 2012 Mineral Resource Estimate @ COG 500ppm TREO
JORC
Category
cut-off
ppm TREO
Tonnes
Mt
TREO
ppm
NdPr
ppm
DyTb
ppm
MREO
ppm
MREO:TREO
%
Indicated 500 392 773 184 17 200 25
Inferred 500 681 712 168 15 184 25
Total 500 1,071 732 174 16 190 25
Notes:
1. TREO = total rare earth oxides (CeO2, Dy2O3, Er2O3, Eu2O3, Gd2O3, Ho2O3, La2O3, Lu2O3, Nd2O3, Pr6O11, Sm2O3, Tb4O7, Tm2O3, Yb2O3) +
Y2O3
2. NdPr=Pr6O11+Nd2O3
3. DyTb= Dy2O3 + Tb4O7
4. Totals may not balance due to rounding of figures.
5. The estimate of Mineral Resources are not Ore Reserves as they have not demonstrated economic viability and may be materially
affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant factors.
6. Mineral resources were classified as Indicated and Inferred.
7. Mineral Resources are reported with Effective Date of March 10, 2026. Responsible CP is Leonardo Rocha (MAIG #7623).
8. Mineral Resources were prepared in accordance with Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves (JORC Code, 2012) incorporating drilling data acquired by January 2025.
9. Blocks estimated by ordinary kriging at support of 100 m × 100 m × 4 m with sub-blocks 25 m × 25 m × 2 m.
10. The results are presented in situ and undiluted, are constrained within an eventual optimized open pit shell, and are considered to
have reasonable prospects of economic viability, using the following parameters:
a. Pit slope angle: 25°;
b. Selling Prices: estimated by element oxide;
c. Costs: mining: 2,13US$/t mined; process: 7.23 US$/t processed; royalties: 2% of revenue; selling costs: 7.03US$/kg REO;
Metallurgical Efficiencies estimated by element.
Project Summary
The Ema project is located in the State of Amazonas in Brazil (Figure 1). The discovery of rare earths at
the Ema project was announced in May 2023, with the maiden MRE announced in April 2024.
Figure 1. Location of the Ema project in Brazil
Mineral Resource Estimate Update
The updated Mineral Resource Estimate was undertaken by GE21 Consultaria Mineral in Brazil and
incorporates the assay results from extensional drilling (ASX: 01 Dec 25) and (ASX: 03 Mar 26) across
the 101-hole drilling program (Figure 2).
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Figure 2. Drilling program 2025. Red dots represent the 101 holes drilled.
This updated Mineral Resource Estimate for the Ema project highlights significant progress and
enhanced confidence in the resource base. Key takeaways include:
1. Large-Scale Resource with Growing Definition
• Total resource now 1.07 billion tonnes @ 732 ppm TREO (>500 ppm cut-off)
• Indicated Resource has increased to 392 Mt, representing approximately one third of the total
inventory
• Provides a substantial resource base capable of supporting long-term, scalable production
2. Strengthening the Path to Production
• Increased proportion of Indicated material improves project certainty and reduces
development risk
• Enhances confidence in early-stage study outcomes and supports progression toward reserve
definition
• Allows for more disciplined engineering, mine planning and cost forecasting as the project
advances
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
The Ema ionic REE project is emerging as a highly significant Mineral Resource within Brazil’s rare earth
sector, supported by several key factors:
• Strong geological analogue to China’s ionic clay deposits: The project shares key
characteristics with the world-class ionic REE deposits of southwest China, often hosted in
deeply weathered felsic volcanic rocks, providing strong geological confidence.
• In-situ Recovery: ISR of rare earths is the most common method for extraction of rare earths
with numerous projects spread throughout SE-Asia.
• Globally important deposit style: China’s ionic clay REE deposits represent the dominant
global source of heavy rare earths, underscoring the strategic relevance of this mineral system.
• Large and prospective land package: The project covers around 189 km² of highly prospective
felsic volcanic terrain, indicating meaningful scale and growth potential.
• Significant exploration upside: With approximately 55% of the tenure still underexplored,
there remains substantial opportunity to expand the known resource through further drilling.
• Strategic importance for Brazil: Ema has the potential to become a key asset in developing
Brazil’s role in the global rare earth supply chain.
The Ema project’s unique characteristics and ongoing exploration success underline its potential to
contribute meaningfully to the global demand for rare earth elements.
Geology and Mineralisation
The rare earth element (REE) mineralisation is hosted within a tropical lateritic weathering profile
developed atop felsic volcanic and volcaniclastic rocks, including rhyolites and ignimbrites. This
weathering profile has facilitated the enrichment of REEs, making the deposit a valuable target for
extraction.
The REE mineralisation occurs primarily in the weathered portions of the profile. In these zones, REEs
originally contained in primary minerals such as monazite and xenotime are released through
weathering processes. The dissolved REEs migrate downward through the regolith profile and are
subsequently adsorbed onto newly forming fine aluminosilicate clay particles, including kaolinite, illite,
and smectite.
The Ema deposit is characterised as an undulating ionic clay-hosted deposit, conforming to the rise and
fall of the local topography. The mineralisation has been geologically interpreted as a singular,
contiguous deposit spanning an area of approximately 82km². This interpretation was developed
through a systematic approach aimed at ensuring the MRE was both well-constrained and reflective of
expected subsurface conditions.
Key steps in the process included the use of both factual and interpreted geological data to guide the
development of the mineralisation model. Geological matrices were developed to aid in interpretation,
facilitating the definition and construction of estimation domains. This approach ensured that the
resource estimation was firmly rooted in the underlying geology, delivering a robust and representative
MRE for the deposit.
The methodologies employed demonstrate a thorough understanding of the deposit's geologic
characteristics, enhancing confidence in the accuracy and reliability of the MRE. All of the data used in
the MRE has been gathered from hand auger drilling. This clay sample is geologically logged and
subsequently sub-sampled prior to analysis. The sampling intervals are domained by geological
constraints (e.g. rock type, and alteration). All geology input is logged and validated by the relevant area
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
geologists, incorporating an assessment of sample recovery. No defined relationship exists between
sample recovery and grade.
Drilling
Drilling was conducted with hand-held augers, which offers the advantage of low-cost, rapid deployment
mobility and sample quality. Drill results have now been received for 101 infill holes of the extensional
program.
Figure 3 - Location map of the 101-hole extensional drill program. holes with assay results received from 2025 infill
drilling program.
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Figure 4 - Cross section from EMA-303 to 353 showing block model grades and distribution.
One key constraint of auger drilling is the depth limitation, with the deepest holes, drilled to ~20m depth.
However this is sufficient to intercept the higher-grade lower zones of the mineralisation which lie
directly above the basal fresh rock.
Topography is moderately undulating across most of the project area with holes within the starter zone
(Priority 1-3) drilled on a nominal 300m grid spacing. Prior drilling programs were conducted at 800m
spacing.
The entire enriched zone at Ema is generally contained within the 10 metres of regolith sitting directly
above the saprock/fresh rock interface, which display a clear increase in grades with depth.
The leach test results from standard assays at SGS (magnesium sulphate and ammonium sulphate)
confirm high recoveries of the four most important rare earth elements, neodymium, praseodymium,
dysprosium and terbium, with some individual elements producing recoveries of up to 85% within the
lower regolith portion of the profile.
The recovery data indicates a significant proportion of the REE’s are present as ionically adsorbed clays,
confirming that Ema, which currently stretches over 82km2
has the potential to become one of the
largest ionic clay hosted deposits defined outside of China.
Weathering Model – Chemical Index of Alteration (CIA)
The mineralised horizons were constrained by a weathering model constructed using the Chemical Index
of Alteration (CIA; Nesbitt & Young, 1982), which showed high reliability, made possible by the
availability of major oxide assays for each interval (Figure 5, 6 & 7).
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Figure 5. Weathering Model Plan View and Section Location (A-A1
, B-B1
) over entire global resource area. HW =
high weathering, IW = Intermediate weathering, LW = low weathering, FR = fresh rock.
Figure 6. Weathering Model section A-A1
.
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Figure 7. Weathering Model section B-B1
.
Sampling and Sub-sampling Techniques
Every 1-metre sample was collected in a plastic bag in the field and transported to the exploration shed
to be oven dried prior to homogenisation.
Samples were homogenised and subsequently riffle split with about 1 kg sent to SGS for analysis and a
similar amount stored.
Additional sample preparation for the auger samples was conducted at SGS Vespasiano (greater Belo
Horizonte) comprising oven drying, crushing of entire sample to 75% < 3mm followed by rotary splitting
and pulverisation of 250 to 300 grams at 95% minus 150#.
The <3mm rejects and the 250-300 grams pulverised sample were returned to BCM for storage.
All samples generated have identification that is registered in internal spreadsheets. This identification
is linked to the name of the hole and interval to which the sample belongs.
Sample Analysis Method
The assay technique used for REE analysis was Lithium Metaborate Fusion ICP-MS (SGS code ICP95A and
IMS95A). This is a recognised industry standard analysis technique for REE suite and associated
elements. Elements analysed at ppm levels included the following minerals and elements:
Ba Ce Co Cs Dy Er Eu Ga
Gd Hf Ho La Lu Nb Nd Pr
Rb Sm Sn Sr Ta Tb Th Tm
U V W Y Yb Zr Zn Co
Cu Ni
The sample preparation and assay techniques used are industry standard and provide total analysis.
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
The ICP95A reports the major elements oxides used to calculate the Chemical Index of Alteration (CIA)
at % levels included:
Al2O3 CaO Cr2O3 F2O3
K2O MgO MnO Na2O
P2O5 SiO2 TiO2
Estimation Methodology
Geological modelling classified weathering domains based on the Chemical Index of Alteration (CIA;
Nesbitt & Young, 1982). GE21 used Leapfrog Geo and Edge software for 3D modelling, with domains
based on weathering horizons defined as follows (figure Error! Reference source not found.):
• High Weathering: CIA ≥ 93%
• Intermediate Weathering: CIA ≥ 82%
• Low Weathering: CIA < 82%
• Fresh Rock: EOH of auger drilling
Most drillholes did not cross the complete weathering profile; with some holes stopping in the pedolith
or saprolite domains due to the depth limitations of the auger semi-compact rocks. The top of fresh rock
horizon was assumed at the end of each auger hole. Figure 9 shows a cross-section view of the geological
model.
Quality assurance and quality control
One certified blank sample (ITAK-QG-01), 2 certified reference material (standard) sample (ITAK-713 and
ITAK-714) and 3 field duplicate sample were inserted by BCM into each 50-sample sequence.
Standard laboratory QA/QC procedures were followed, including inclusion of standard, duplicate and
blank samples.
The assay results of the standards fall within acceptable tolerance limits and no material bias is evident.
Data analysis
GE21 developed data analyses, including descriptive statistics for light and heavy REE’s by domain,
exploratory data analysis, and geostatistical analysis. They identified outliers as breaks in probability plot
distribution curves for each element by domain (Table 4).
Bulk density
Average bulk density values for each weathering zone type were defined based on 57 sand replacement
in situ density assays executed by the BCM technical team. Samples were collected in pits adjacent to
auger holes at 2 metre depth intervals. Density values were correlated to a specific weathering zone
type based on assay results (CIA) for average density definition. The bulk density applied in the block
model was dry based.
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Block model and Grade Estimation
The block model dimensions were based on average drill spacing, with sub-blocks used for adhesion
between modelled solids and the selective mining unit.
The 3D block model was constructed for resource estimation purposes in Leapfrog EdgeTM software.
The parent block dimensions were 100m x 100m x 4m, sub-blocked to 25m (X) x 25m (Y) x 2m (Z).
Variographic analysis was performed for grouped domains (HW, IW and LW) and elements (TREO), with
experimental variograms constructed in different directions. No continuity differences were observed
in different directions in the horizontal plane, therefore, horizontal/omnidirectional experimental
variograms were chosen (Table 2 Table 3). The mineral resource was estimated using ordinary kriging
(Table 4Table 3. ) and validated the grade estimate through visual analysis and global and local bias
analysis using the nearest neighbour as the comparison estimate.
Table 2. Variogram Parameters for HW, IW and LW domains
Domain
Direction Range
Parameter Sill
Dip Dip Az Plunge Major Semi Minor
HW
0 45 0 300 300 7.5
Nugget 0.08
Structure 0.92
IW
0 45 0 300 300 10
Nugget 0.08
Structure 0.92
LW
0 45 0 300 300 10
Nugget 0.08
Structure 0.92
Table 3. Ordinary Kriging Strategy
Domain Pass
Range Sample Search
Major Semi Minor
Max per
Hole
Min max
HW
1 100 100 5 2 3 12
2 200 200 10 2 3 12
3 300 300 15 2 3 12
4 >300 >300 >15 2 3 12
IW
1 100 100 5 2 3 12
2 200 200 10 2 3 12
3 300 300 15 2 3 12
4 >300 >300 >15 2 3 12
LW
1 100 100 5 2 3 12
2 200 200 10 2 3 12
3 300 300 15 2 3 12
4 >300 >300 >15 2 3 12
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Figure 8. Mineral Resource blocks colour coded by JORC Category. Blue is Inferred and Orange is Indicated.
Cut-off grades, including basis for the selected Cut-off Grade
The selection of the TREO cut-off grade (500ppm) used for reporting was based on the experience of the
Competent Person. Given the Mineral Resource and the absence of any development studies, this cut-
off grade was selected based on a peer review of publicly available information from more advanced
projects with comparable mineralisation styles (i.e. clay-hosted rare earth mineralisation) and
comparable conceptual processing methods.
Mining and metallurgical methods / material modifying factors
No specific mining or metallurgical methods or parameters were incorporated into the modelling
process.
Mineral Resource classification and reporting
The Mineral Resource Estimate for Ema Project has been classified as Inferred and Indicated.
The Competent Persons are satisfied that the classification is appropriate based on the current level of
confidence in the data, drill hole spacing, geological continuity, variography, and bulk density data
available for the project.
This announcement has been authorised for release by the Board of Directors.
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Enquiries
For more information please contact:
Andrew Reid
Managing Director
Brazilian Critical Minerals Limited
Andrew.reid@braziliancriticalminerals.com
Brazilian Critical Minerals Limited (BCM) is a
mineral exploration company listed on the
Australian Securities Exchange.
Its major exploration focus is Brazil, in the
Apuí region, where BCM has discovered a
world class Ionic Adsorbed Clay (IAC) Rare
Earth Elements deposit. The Ema IAC
project is contained within the 781 km² of
exploration tenements within the Colider
Group.
BCM has defined an indicated + inferred
MRE of 1.07Bt of REE’s with metallurgical
recoveries averaging 62% MREO some of
the highest for these types of deposits
anywhere in the world.
The Company is currently working on
completing its Bankable Feasibility Study,
securing offtake agreements and permits in
advance of project development.
JORC
Category
cut-off
ppm TREO
Tonnes
Mt
TREO
ppm
NdPr
ppm
DyTb
ppm
MREO
ppm
MREO:TREO
%
Indicated 500 392 773 184 17 200 25
Inferred 500 681 712 168 15 184 25
Total 500 1,071 732 174 16 190 25
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Competent Persons Statement
The information in this announcement relates to previously reported exploration results and mineral
resource estimates for the Ema Project released by the Company to ASX on 22 May 2023, 17 July 2023,
19 July 2023, 31 July 2023, 13 Sep 2023, 19 Oct 2023, 06 Dec 2023, 06 Feb 2024, 22 Feb 2024, 13 Mar
2024, 02 Apr 2024, 08 Oct 2024 19 Nov 2024, 21 Jan 2025, 17 Feb 2025, 26 Feb 2025, 10 Mar 2025, 13
March 2025, 28 April 2025, 27 May 2025, 28 May, 13 June 2025, 01 Jul 2025, 18 Aug 2025, 01 Sep 2025,
22 Sep 2025, 23 Oct 2025, 1 Dec 2025, 17 Dec 2025, 12 Jan 2026 and 03 Mar 2026. The Company
confirms that is not aware of any new information or data that materially affects the information
included in the above-mentioned releases and CONTINUES TO APPLY and have not materially changed
in accordance with listing Rule 5.23.2.
The information in this announcement that relates to the Ema Mineral Resource is based on and fairly
represents information compiled by Mr. Antonio de Castro (acts as BCM´s Senior Consulting Geologist
through the consultancy firm, ADC Geologia Ltda) and Mr. Leonardo Rocha (associate of GE21
Consultoria Mineral Ltda). Mr. de Castro is a member of the Australasian Institute of Mining and
Metallurgy, and Mr. Rocha is a member of Australasian Institute of Geoscientists. Both have sufficient
experience of relevance to the styles of mineralisation and types of deposits under consideration, and
to activities undertaken to qualify as Competent Persons as defined in the 2012 Edition of the Joint Ore
Reserve Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr. de Castro is the Competent Person for the geological and mineralization model
database (including all drilling information). Mr. Rocha is the Competent Person for the construction of
the 3D geology/mineralisation model plus the mineral resource estimation. Mr Leonardo Rocha
undertook a site visit to the Ema Project between 11 and 15 July, 2024. Mr de Castro has planned,
managed and/or conducted work programmes for the Ema/Ema East Project, including drilling. He has
visited the site on numerous occasions. Mr. de Castro and Mr. Rocha consent to the inclusion in this
report of the matters on their information in the form and context in which they appear.
Appendix 1 – Full List of Drill Hole Collars
Hole_ID East Northing RL Depth (m) Azimuth Dip Date
EMA-TR-008 185746 9177403 164.16 20 0 -90 6/06/2023
EMA-TR-009 185900.3 9177539 138.84 17 0 -90 7/06/2023
EMA-TR-010 186037.9 9177691 129.1 15 0 -90 7/06/2023
EMA-TR-011 186177.8 9177844 127.59 11 0 -90 9/06/2023
EMA-TR-012 186316.9 9177968 165.92 7 0 -90 12/06/2023
EMA-TR-013 186455.9 9178124 183.17 20 0 -90 13/06/2023
EMA-TR-014 186593.6 9178263 201.31 21 0 -90 13/06/2023
EMA-TR-015 186731.5 9178409 208.53 18 0 -90 14/06/2023
EMA-TR-016 186888.5 9178522 179.28 15 0 -90 20/06/2023
EMA-TR-017 187024.1 9178683 162.09 10 0 -90 21/06/2023
EMA-TR-018 187177.9 9178795 143.09 18 0 -90 21/06/2023
EMA-TR-019 187304.8 9178963 129.03 15 0 -90 21/06/2023
EMA-TR-020 187439.7 9179081 121.15 9 0 -90 23/06/2023
EMA-TR-021 184606.8 9176795 125.91 12 0 -90 27/06/2023
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
EMA-TR-022 184837 9176776 122.77 12 0 -90 30/06/2023
EMA-TR-023 184807.3 9176595 135.83 22 0 -90 30/06/2023
EMA-TR-024 184798.7 9176379 138.75 21 0 -90 27/06/2023
EMA-TR-025 184607 9176415 140.97 16 0 -90 3/07/2023
EMA-TR-026 184395.1 9176409 154.8 14 0 -90 4/07/2023
EMA-TR-027 184416.6 9176594 134.41 13 0 -90 5/07/2023
EMA-TR-028 184410.6 9176759 126.17 14 0 -90 5/07/2023
EMA-TR-029 184612 9177129 122.94 13 0 -90 5/07/2023
EMA-TR-030 185201.3 9177198 158.12 4 0 -90 10/07/2023
EMA-TR-031 185207.7 9176793 118.44 10 0 -90 10/07/2023
EMA-TR-032 185213.3 9176393 125.92 15 0 -90 10/07/2023
EMA-TR-033 185700.4 9176392 117.4 6 0 -90 10/07/2023
EMA-TR-034 184011.9 9176794 131.63 20 0 -90 17/07/2023
EMA-TR-035 183618.9 9176796 146.88 16 0 -90 18/07/2023
EMA-TR-036 183607.1 9177193 125.82 12 0 -90 18/07/2023
EMA-TR-037 184024.6 9177185 122.13 11 0 -90 19/07/2023
EMA-TR-038 184809.8 9177596 136.71 19 0 -90 19/07/2023
EMA-TR-039 184536.8 9177599 122.83 10 0 -90 20/07/2023
EMA-TR-040 184006.8 9177599 130.93 15 0 -90 20/07/2023
EMA-TR-041 183604.8 9177592 162.69 25 0 -90 24/07/2023
EMA-TR-042 183634.5 9178000 136.76 14 0 -90 24/07/2023
EMA-TR-043 183897 9177997 124.06 12 0 -90 26/07/2023
EMA-TR-044 184381.4 9178023 126.58 14 0 -90 28/07/2023
EMA-TR-045 184781.1 9177982 144.9 6 0 -90 31/07/2023
EMA-TR-046 184791.4 9178447 179.92 10 0 -90 31/07/2023
EMA-TR-047 184414.5 9178404 147.48 18 0 -90 31/07/2023
EMA-TR-048 184006.6 9178394 130.46 15 0 -90 2/08/2023
EMA-TR-049 183635.4 9178392 124.06 13 0 -90 2/08/2023
EMA-TR-050 182805.9 9176803 149.8 13 0 -90 17/08/2023
EMA-TR-051 182010.9 9176800 134.05 12 0 -90 17/08/2023
EMA-TR-052 181221.5 9176789 142.58 15 0 -90 17/08/2023
EMA-TR-053 180498.9 9176788 189.59 28 0 -90 28/08/2023
EMA-TR-054 179605.1 9176820 174.49 10 0 -90 5/09/2023
EMA-TR-055 178809.1 9176797 180.81 16 0 -90 28/08/2023
EMA-TR-056 178002.5 9176828 179.47 15 0 -90 5/09/2023
EMA-TR-057 182814.9 9177595 178.46 29 0 -90 6/09/2023
EMA-TR-058 182037.3 9177612 149.21 20 0 -90 5/09/2023
EMA-TR-059 181206.2 9177597 188.79 17 0 -90 22/08/2023
EMA-TR-060 180352 9177561 188.42 11 0 -90 31/08/2023
EMA-TR-061 179606.1 9177594 204.52 22 0 -90 23/08/2023
EMA-TR-062 178800.5 9177598 175.95 13 0 -90 30/08/2023
EMA-TR-063 177978.9 9177561 195.28 16 0 -90 6/09/2023
EMA-TR-064 182781.5 9178348 135.73 10 0 -90 12/09/2023
EMA-TR-065 182819 9179184 138.99 13 0 -90 13/09/2023
ASX Announcement
Released 22nd
April 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 5
Share your feedback
Discover