EMA PROJECT UPDATE
Brazilian Critical Minerals Limited (ASX: BCM) (“BCM” or the “Company”) is pleased to provide
an update on progress of current activities of its flagship rare earth Ema project in Brazil as it
works to complete its bankable feasibility study.
Highlights
•
Exceptional wellfield results: Recent testing returned a mean hydraulic conductivity
(K) of 0.27 m/day—nearly double the figure used in the Scoping Study—with peak
values as high as 0.65 m/day. This result significantly enhances confidence in
scalability and production efficiency
•
Robust PLS extraction: Over 2,000 litres of pregnant liquor solution (PLS) have been
successfully extracted, confirming strong in-situ recovery (ISR) performance validating
the process
•
Pilot field trial entering final stage: The field trial is now in its final phase with the
water washing cycle underway, bringing BCM one step closer to demonstrating
commercial production
•
Permitting advancing rapidly: Trial mining permit applications have been submitted
and are progressing through evaluation
•
Environmental approvals on track: Studies are complete, with submission expected
in the coming quarter—keeping the project development timeline intact
•
Full community and government support: BCM has secured 100% support from the
local community, backed by endorsements from senior officials in Apui, an important
de-risking milestone
•
Land access near finalisation: Negotiations with landowners are well advanced and
nearing completion
•
BFS firmly underway: All key work streams, technical, environmental, and
economic are progressing as planned
•
Strategic offtake interest building: BCM is in advanced discussions with multiple
potential offtake partners, reflecting growing market interest to secure, ESGfriendly and rapidly developing rare earth supply
•
Project financing initiated: Early-stage discussions with strategic and institutional
investors have begun, with strong initial interest underscoring confidence in the
asset’s value proposition
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 1
ASX Announcement
Released 28th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Andrew Reid, Managing Director, commented:
“BCM is now advancing on multiple work fronts, all aimed at designing, permitting and financing the Ema Rare
Earth Project.
The pilot field trial has been a resounding success: we have successfully injected, leached, extracted and
precipitated rare earths directly from the ground using in-situ recovery (ISR) methods. Notably, these results have
been achieved using magnesium sulfate, positioning Ema as the highest ESG-compliant mining project in the sector.
The bankable feasibility study has commenced in partnership with Altris Engineering and will cover a
comprehensive range of technical and design activities over the next six to nine months.
Engagement with regulators on the mine permit application is ongoing and positive. Data from the field pilot trial
will be incorporated into the final environmental permit submission, which is expected shortly.
In parallel, BCM is experiencing strong interest from numerous potential offtake partners keen to understand the
Project’s progress and upcoming deliverables over the next 12 months. The Company believes that with the lowest
CAPEX of just US$55 million, exceptionally low OPEX, and a compelling mix of highly sought-after rare earth
elements, the Ema Project is well positioned to secure offtake agreements and become an attractive addition to
future supply chains.”
Pilot Field Trial
The 2025 ISR field test program was designed to validate various deposit-specific characteristics of the
Ema project, and to collect a database of hydrogeological and metallurgical data to further evaluate the
ISR mining conditions present on site.
Key Highlights
•
•
•
•
•
•
•
•
Recent wellfield data reported a mean hydraulic conductivity (K) almost double that used for
the scoping study (0.27 m/day compared to 0.15 m/day), with maximum K value of 0.65 m/day
from slug test analysis
Successfully injected a low strength (0.5M) MgSO4 solution4;
Achieved very rapid decrease of the pH within the clay zone to the target value required to leach
rare earths over short distances (Figure 1)4;
Achieved fast reactivity of the MgSO4 reagent leading to the leaching of rare earths into solution;
Achieved high PLS grade from leaching the test area6;
Maintained a constant flow of solution through the clays, indicating strong permeability;
Seen a steady and elevated rise in solution levels indicative of a solid impermeable basement4;
and
Extracted and precipitated rare earths from solution6.
The results from the hydrogeological testing at Ema produced initial hydraulic conductivity
values that are substantially better than those assumed in the Scoping Study (0.27 m/day vs to 0.15
m/day), with maximum K value of 0.65 m/day7.
The K value is a property of the material that describes the ease with which a fluid can move through
the pore space of the clay network. K values depend on the degree of saturation and on
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 2
ASX Announcement
Released 28th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
the density and viscosity of the fluid injected. Sufficient permeability within the mineralised zone is the
key criterion for the successful deployment of the ISR mining method.
Maintaining pH control is also fundamental to the success of ISR rare earths projects. The lixiviant must
consistently remain at or below the target pH—typically around pH 4—to effectively mobilise rare earth
elements from clay-hosted mineralisation without triggering excessive neutralisation or undesirable side
reactions. Sustained pH stability under field conditions not only ensures efficient leaching and higher
recoveries but also demonstrates the robustness and scalability of the process, which are critical factors
in de-risking ISR operations and advancing project development.
Through the field pilot trial, the Company successfully maintained the pH of the lixiviant within the clays
at or below the target pH level of 4 for a substantial period of time6 (Figure 1.) ideal for ISR leaching and
metal extractability.
Figure 1. pH values of the monitoring holes within the field trial area 2 undergoing MgSO4 injection
Water Washing
Subsequent to the completion of MgSO4 injection, the Company has now commenced the final phase of
the field pilot trial, being the injection of local river water through the mineralised clay horizon. The
primary objective is to re-establish both the background pH and sulfate levels (SO4) whilst collecting and
submitting information to the regulators for assessment which could comply with regulatory
commitments upon commercialisation of the project (Figure 2).
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 3
ASX Announcement
Released 28th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Figure 2. Rising water levels in monitoring holes in field trial area 1 responding well to water injection
and retuning pH values to background levels.
Project Permitting
The Company has adopted a 2-prong permitting strategy. In April, the Company, submitted to the Mines
Department (ANM) two applications for trial mining licences (each with a capacity of 3,000tpa TREO),
one for each of BCM’s 100% owned tenements. Complimentary to the application to the ANM, the
Company is finalising the environmental study for the trial mining licences, to be submitted to the state
environmental authority (IPAAM) in the coming weeks.
A trial mining licence in Brazil is valid for recurring 3-year increments and allows projects to be fast
tracked into production whilst collating information specific towards finalising a full mining permit
application.
These two trial mining applications are currently being evaluated by a task force specifically
established for the purpose.
Furthermore,
•
•
•
•
A separate task force has been set up to evaluate the previously submitted final exploration
reports, the first step in obtaining a full mining license.
Approval of both exploration reports is anticipated in the coming quarter
All Environmental baseline data has now been collected with Environmental consultants CERN
currently finalising the environmental impact studies for both the trial mining and full mining
licences
BCM has established close lines of communication with both ANM and the Environment State
Regulator (IPAAM) in Manaus and routinely monitors progress of the approval processes
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 4
ASX Announcement
Released 28th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
•
BCM regularly engage the Ema project with state authorities and has established close ties with
the local Mayor, who actively supports the Company’s activities.
In 2019, BCM successfully received a both a trial mining licence 7 and an Environmental permit8 for the Três
Estados precious metals project also located within the same region as the Ema rare earth project.
The full mining permit comprises an application to the ANM and a submission to IPAAM, comprising a
full environmental impact study, which will incorporate a detailed analysis of data from the current field
pilot trial. On approval of the study the Company will be granted a Preliminary Licence (LP), the initial
step in obtaining a full mining permit.
The Company is also in the process of finalising landowner agreements with the small number of semisubsistence farmers who occupy the Ema mineralised area. All the landowners, who are entitled to a
royalty by law, are fully supportive of the project. A key factor is the low level of land disturbance and
transient nature of the ISR operation, minimising the impact of the operation on farming activities
(Figure 3.) and the rapid re-opening of the land post mining.
Before leaching
After leaching
Figure 3. Before and after photos of the field pilot trial after 2 months of operation. Grass area was cut
prior to leaching and vegetation and flora areas remain largely unaffected by the ISR process, other
than by heavy foot traffic.
Offtake Discussions
Over the past several months, the Company has made meaningful progress across multiple initiatives,
with counterparties actively engaged in discussions around proposals for future rare earths offtake
agreements. These discussions now range from intermediate to more advanced stages, though they
remain non-committal at this time. Nonetheless, the growing interest in the Ema Project from potential
customers and major industry participants highlights an increasing recognition of the asset’s quality, its
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 5
ASX Announcement
Released 28th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
strong project development outlook, and its de-risked position following a successful field pilot trial.
Additionally, the project’s favourable location and low financial barrier to production—underscored by
the Scoping Study’s estimated CAPEX of just US$55 million—provides the Company with a solid
foundation to evaluate multiple alternative development pathways.
Financing Strategy/Opportunities
For the Ema project, where capital requirements are extremely low (US$55 million CAPEX identified in
the Scoping Study9), non-government lenders are viewing the project as a lower-risk opportunity,
especially once technical viability and scalability have been demonstrated through completion of the
field pilot trial washing phase and feasibility work.
Non-government debt funding represents an increasingly attractive pathway for financing Ema, with
comparatively low capital intensity and strong project fundamentals. This approach may involve
securing funding from specialist resource funds, private credit providers, or structured finance
institutions.
Beyond traditional term loans, non-government debt being reviewed includes mezzanine finance,
royalty-backed debt, or project-specific bonds. These structures can be tailored to align repayment
profiles with project cash flows, preserving shareholder equity and minimising dilution.
The ability to attract private debt funding is linked to key de-risking milestones—such as proven
extraction performance, clear permitting pathways, and offtake interest from reputable industry
players. To date the Company holds no information it believes will prevent the achieving of the above
milestones.
Bankable Feasibility Study
BCM recently awarded a contract for the services of Altris Engineering to be the lead manager with
respect to completing a bankable feasibility study (BFS) of Ema. The study has commenced and is
expected to take 6-9 months to complete.
Major BFS responsibilities include;
Altris
•
•
•
CAPEX cost estimate (Class 3 ± 15% Engineering assessment)
OPEX cost estimate
Overall project delivery and technical sign-off
BCM
•
•
•
•
•
Conversion of inferred to indicated resources
Topographic surveys (Lidar) over first 5 years of production
Geophysical surveys to assess bedrock ground conditions
Logistics costing for import/export of consumables
Financial modelling
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 6
ASX Announcement
Released 28th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
ANSTO
•
•
Optimisation of the process strategy through the processing steps of impurity removal and
precipitation of MREC
1,000litres of PLS from the field trial is currently being mobilized to Australia
WSP
•
•
•
Field trial data collation and assessment
Hydrogeological modelling of solution flows through initial phases of mining
Design of ISR leaching circuit
The information in this announcement that relates to exploration results is based on information
compiled by Mr. Antonio de Castro, BSc (Hons), Member of AusIMM, CREA, who acts as BCM´s Senior
Consulting Geologist through the consultancy firm, ADC Geologia Ltda. Mr. de Castro has sufficient
experience which is relevant to the type of deposit under consideration and to the reporting of
exploration results and analytical and metallurgical test work to qualify as a competent person as
defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Castro consents to the report being
issued in the form and context in which it appears.
References
1
Brazilian Critical Minerals (ASX:BCM) – ISR testwork from ANSTO achieves high recoveries 12th March
2025
2
Brazilian Critical Minerals (ASX:BCM) – Ema Field Trial receives magnesium Sulphate Approval 28th
March 2025
3
Brazilian Critical Minerals (ASX:BCM) – Ema Field Trial Commences 14th May 2025
4
Brazilian Critical Minerals (ASX:BCM) – Ema ISR field trial achieves first major permeability hurdle 27th
May 2025
5
Brazilian Critical Minerals (ASX:BCM) – Placement raises $4.0 Million to advance Ema project 5th June
2025
6
Brazilian Critical Minerals (ASX:BCM) – Magnesium Sulphate recorded in multiple field trial areas 13th
June 2025
7
Brazilian Critical Minerals (ASX:BCM) – EMA Trial Mining Licence Granted 11th June 2019
8
Brazilian Critical Minerals (ASX:BCM) – IPHAN and IPAAM permitting Approvals 29th March 2019
9
Brazilian Critical Minerals (ASX:BCM) – Ema Rare Earths Scoping Study confirms low CAPEX and OPEX
26th February 2025
The information in this announcement relates to previously reported exploration results and
mineral resource estimates for the Ema Project released by the Company to ASX. The Company
confirms that is not aware of any new information or data that materially affects the
information included in the above-mentioned releases.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 7
ASX Announcement
Released 28th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Enquiries
For more information please contact:
Andrew Reid
Managing Director
Brazilian Critical Minerals Limited
Andrew.reid@braziliancriticalminerals.com
Brazilian Critical Minerals Limited (BCM) is a mineral
exploration company listed on the Australian
Securities Exchange.
Its major exploration focus is Brazil, in the Apuí
region, where BCM has discovered a world class Ionic
Adsorbed Clay (IAC) Rare Earth Elements deposit. The
Ema IAC project is contained within the 781 km² of
exploration tenements within the Colider Group and
adjacent sediments.
BCM has defined an indicated and inferred MRE of
943Mt of REE’s with metallurgical recoveries
averaging 68% MREO, representing some of the
highest for these types of deposits anywhere in the
world.
The Company has converted the MRE central portion
from Inferred into the Indicated category with an
extensive drill program during 2024 which will inform
the scoping study and economic analysis due for
completion Q1 2025.
Ema REE Global Mineral Resource Estimate @COG 500ppm TREO
JORC
cut-off
Tonnes
TREO
NdPr
Category
ppm TREO
Mt
ppm
ppm
Indicated
500
248
759
176
Inferred
500
695
701
165
Total
500
943
716
168
DyTb
ppm
16
16
16
MREO
ppm
192
181
184
MREO: TREO
%
25
26
26
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 8
ASX Announcement
Released 28th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Appendix 1: Table 1 Ema project – JORC Code (2012 Edition) metallurgical sampling techniques and data.
Item
JORC code explanation
Sampling Techniques
•
Nature and quality of sampling.
•
Include reference to measures taken to ensure sample
representativity and the appropriate calibration of any
measurement tools or systems used.
•
Aspects of the determination of mineralisation
that are Material to the Public Report.
Drilling
Techniques
•
Drill type (eg core. reverse circulation. openhole hammer. rotary air blast. auger. Bangka.
sonic. etc) and details (eg core diameter. triple
or standard tube. depth of diamond tails. facesampling bit or other type. whether core is
oriented and if so. by what method. etc).
Comments
•
Exploration results are based on solution samples
extracted during ISR field trials conducted by WSP with
support of BCM´s exploration team.
•
The data presented is based on solution collected from
the monitoring holes after percolation through soils and
saprolite, mined by in-situ techniques.
•
Sampling and measurements were supervised by the
Chief Metallurgist and WSP´s hydrogeologist.
•
Sample was extracted from deep wells drilled down to
bedrock basement whereby solution was pumped to the
surface for collection and further analysis
•
Solution samples were tested for pH with a probe called
Incoterm brand pen-type digital pH meter, after
calibration.
•
These results are specific for the tracer test area.
•
All auger holes in the test area were drilled with 6” bit.
•
The deep injection holes in H1 area were the only ones
cased with 2” sliced PVC pipes, all others were cased with
sliced 4” PVC pipes.
•
Coarse gravel sand was inserted between the pipes and
the edges of the holes to create the filter zone.
•
Cement around the collars were built to prevent running
waters from rain to contaminate the underground water.
•
Holes drilled are not included in any
Mineral Resource Estimation.
Drill Sample
Recovery
Logging
SubSampling
Techniques
•
Method of recording and assessing core and
chip sample recoveries and results assessed.
•
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
•
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
•
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral
Resource estimation. mining studies and
metallurgical studies.
•
Whether logging is qualitative or quantitative in
nature. Core (or costean. channel. etc)
photography.
•
The total length and percentage of the relevant
intersections logged.
•
If core. whether cut or sawn and whether
quarter. half or all core taken.
•
•
n/a
•
n/a
n/a.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 9
ASX Announcement
Released 28th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Item
JORC code explanation
and
Sampling
Procedures
•
If non-core. whether riffled. tube sampled.
rotary split. etc and whether sampled wet or
dry.
•
For all sample types. the nature. quality and
appropriateness of the sample preparation
technique.
•
Quality control procedures adopted for all subsampling stages to maximise representativity of
samples.
•
Measures taken to ensure that the sampling is
representative of the in-situ material collected.
including for instance results for field
duplicate/second-half sampling.
•
Whether sample sizes are appropriate to the
grain size of the material being sampled.
•
The nature. quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
•
For geophysical tools. spectrometers. handheld
XRF instruments. etc. the parameters used in
determining the analysis including instrument
make and model. reading times. calibrations
factors applied and their derivation. etc.
•
Nature of quality control procedures adopted
(eg standards. blanks. duplicates. external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and precision
have been established
•
The verification of significant intersections by
either independent or alternative company
personnel.
•
The use of twinned holes.
•
Documentation of primary data. data entry
procedures. data verification. data storage
(physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys).
trenches. mine workings and other locations
used in Mineral Resource estimation.
•
Specification of the grid system used.
•
Quality and adequacy of topographic control.
•
Data spacing for reporting of Exploration
Results.
•
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
•
Whether sample compositing has been applied.
Quality of
Assay Data
and
Laboratory
Tests
Verification
of Sampling
and Assaying
Location of
Data Points
Data Spacing
and
Distribution
Comments
•
n/a.
•
n/a
•
The UTM WGS84 zone 21S grid datum is used for current
reporting. The drill holes collar coordinates for the holes
reported are currently controlled by hand-held GPS.
•
n/a
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 10
ASX Announcement
Released 28th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Item
JORC code explanation
Comments
Orientation
of Data in
relation to
Geological
Structure
•
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known. considering
the deposit type.
•
n/a
•
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias. this should be
assessed and reported if material.
Sample
security
•
The measures taken to ensure sample security.
•
The solution samples sealed in plastic bags were sent
directly to Catalão by airfreight and courier to the
laboratory. The Company has no reason to believe that
sample security poses a material risk to the integrity of
the assay data.
Audit or
Reviews
•
The results of any audits or reviews of sampling
techniques and data.
•
The sampling techniques and data have been reviewed
by the Competent Person and are found to be of industry
standard.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 11
ASX Announcement
Released 28th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
JORC (2012) Table 1 - Section 2: Reporting of Exploration Results
Criteria
JORC code explanation
Mineral
Tenement and
Land Tenure
Status
•
Commentary
Type. reference name/number. location
and ownership including agreements or
material issues with third parties such as
joint ventures. partnerships. overriding
royalties. native title interests. historical
sites. wilderness or national park and
environmental settings.
•
The EMA and EMA EAST leases are 100% owned
by BCM with no issues in respect to native title
interests. historical sites. wilderness or national
park and environmental settings.
•
The company is not aware of any impediment to
obtain a licence to operate in the area.
•
The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Exploration
done by Other
Parties
•
Acknowledgment and appraisal
exploration by other parties.
of
•
No exploration by other parties has been
conducted in the region.
Geology
•
Deposit type. geological setting and style of
mineralisation.
•
The REE mineralisation at EMA is contained within
the tropical lateritic weathering profile developed
on top of felsic rocks. rhyolites as per the Chinese
deposits.
•
The REE mineralisation is concentrated in the
weathered profile where it has dissolved from the
primary mineral. such as monazite and xenotime.
then adsorbed on to the neo-forming fine
particles of aluminosilicate clays (e.g. kaolinite.
illite. smectite).
•
This adsorbed iREE is the target for extraction and
production of REO.
•
Auger locations and diagrams are presented in
this announcement.
•
Details are tabulated in the announcement.
Drill Hole
Information
•
•
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
•
easting and northing of the drill
hole collar
•
elevation or RL (Reduced Level –
elevation above sea level in
metres) of the drill hole collar
•
dip and azimuth of the hole
•
down
hole
length
interception depth
•
hole length.
and
If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does not
detract from the understanding of the
report. the Competent Person should
clearly explain why this is the case.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 12
ASX Announcement
Released 28th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Criteria
JORC code explanation
Data
aggregation
methods
•
In reporting Exploration Results. weighting
averaging techniques. maximum and/or
minimum grade truncations (eg. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Commentary
•