Ema Scoping Study - Investor Presentation
Released
Released
Announcement PDF
Ema Scoping Study
26 February 2025
In-situ recovery Rare Earths
Ultra Low Capex
Ultra Low Opex Production
Disclaimer
This presentation has been prepared by Brazilan Critical Minerals limited (company).
This important notice and disclaimer applies to this presentation and any information provided in relation to
or in connection with the information contained in it.
This presentation contains information in summary form. Some of the information is based on publicly
available sources, has not been independently verified or may not be complete. It should be read in
conjunction with the Company’s other continuous and periodic disclosure announcements lodged with
Australian Securities Exchange, which are available at www.asx.com.au.
This presentation contains forward-looking statements which involve a number of risks and uncertainties.
These statements reflect current expectations, intentions or strategies regarding the future and assumptions
based on currently available information. Should one or more of the risks or uncertainties materialize, or
should underlying assumptions prove incorrect, actual results may vary from the expectations, intentions
and strategies described in this presentation.
No representation or warranty is made as to the accuracy, completeness, reliability, fairness, or correctness
of the information contained in this presentation. To the maximum extent permitted by law, no person,
including the company and their related bodies corporate, officers, employees, and representatives
(including agents and advisors), accept any liability or responsibility for loss arising from the use of such
information. This presentation is not a bidder’s statement, prospectus or a product disclosure statement
under the Corporations Act 2001 (Cth) or offering document under any other law. It has not been lodged with
the Australian Securities and Investments Commission.
This presentation is for information purposes only and is not financial product or investment advice or
intended to be used as a basis for making an investment decision. It has been prepared without taking into
account the investment objectives, financial circumstances, taxation position or particular needs of
investors.
This presentation does not constitute an offer to issue or sell, or to arrange to sell, securities or other financial
products. In particular, this presentation and the information contained in it does not constitute a solicitation,
offer or invitation to buy, subscribe for or sell any security in the United States or to or for the account or
benefit of any U.S. Person (as defined in Regulation S under the U.S. Securities Act of 1933, as amended (the
US Securities Act)). The securities referred to in this presentation as being offered or sold have not been, and
will not be, registered under the US Securities Act. Securities may not be offered or sold in the United States
unless they have been registered under the US Securities Act or an exemption from registration is available.
The release, publication or distribution of this presentation in jurisdictions outside Australia may be restricted
by law. Any failure to comply with such restrictions may constitute a violation of applicable securities laws.
Competent person statement
The information in this announcement that relates to the Ema Mineral Resource is based on and fairly represents
information compiled by Mr. Antonio de Castro (acts as BCM´s Senior Consulting Geologist through the consultancy
firm, ADC Geologia Ltda) and Mr. Leonardo Rocha (associate of GE21 Consultoria Mineral Ltda). Mr. de Castro is a
member of the Australasian Institute of Mining and Metallurgy, and Mr. Rocha is a member of Australasian Institute
of Geoscientists. Both have sufficient experience of relevance to the styles of mineralisation and types of deposits
under consideration, and to activities undertaken to qualify as Competent Persons as defined in the 2012 Edition of
the Joint Ore Reserve Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr. de Castro is the Competent Person for the geological and mineralization model database
(including all drilling information). Mr. Rocha is the Competent Person for the construction of the 3D
geology/mineralisation model plus the mineral resource estimation. Mr Leonardo Rocha undertook a site visit to
the Ema Project between July 11 and 15, 2024. Mr de Castro has planned, managed and/or conducted work
programmes for the Ema/Ema East Project, including drilling. He has visited the site on numerous occasions. Mr. de
Castro and Mr. Rocha consent to the inclusion in this report of the matters on their information in the form and
context in which they appear.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements and, in the case of Mineral Resources, that all material
assumptions and technical parameters underpinning the estimates in the original release continue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the relevant original market announcements. Refer
to the attached Appendices for further information on the Mineral Resource Estimate and metal equivalents.
“Ema Rare Earth Project Scoping Study”, dated 26 February 2025.
All material assumptions underpinning the production targets and forecast financial information derived from the
production targets in the previous announcement continue to apply and have not materially changed and are
considered preliminary in nature.
Exploration results and mineral resources
The information in this Presentation that relates to Exploration Results and Mineral Resources is based upon and
fairly represents information previously released to the ASX on 22 May 2023, 6 June 2023, 17 July 2023, 31 July 2023,
13 September 2023, 3 October 2023, 19 October 2023, 7 December 2023, 29 January 2024, 6 February 2024, 22
February 2024, 13 March 2024, 3 April 2024, 22 April 2024, 3 May 2024, 20 May 2024, 8 July 2024, 2 August 2024, 6
August 2024, 19 August 2024, 8 October, 11 November, 19 November, 14 January, 21 January, 17 February and 21
February.
This presentation has been approved for release by the Board of Directors.
Brazilian REE
Landscape
EMA Rare Earths
Apuí Rare Earths
$11M
Brazilian
Rare Earths
Serra Verde
$512M
EMA Rare Earths Project
30 km south from Apuí
Colossus Project
$27M
Caldera Project
$154M
In-situ recovery mining
The most cost effective,
environmentally friendly
method of mining
RIGHT
RIGHT
RIGHT
Geology
Style of Mineralisation
Hydrogeology
Weathering less
than 20m deep
Ore grades directly
above bedrock
Permeable orebody
Non-fractured bedrock
RIGHT
Chemistry
RIGHT
Reagents
RIGHT
High recoveries and
Ionic leaching
MgS04
Non-aggressive fluids
ESG compliant
MREC with 98% purity
Product
In-situ recovery is a well understood rare
earth mining method
Significant contributor to current world
production output
NO
Land Clearing
NO
Noisy Dusty Tuck
Haulage
NO
Open Pit Mining
NO
Large Processing
Facility
NO
Dirty Mining
Equipment
NO
Need for
Reclamation
Argus Media 2025 – Global Rare Earths market outlook February 2025
4-step flow sheet enables
very low Capex – US$55M
1
2
3
4
Top Soil
Impurity
Removal
Precipitation
MREC
Processing Plant
Steps 2 – 3 -4
Saprolite
Saprock (orezone)
recycled reagents
Basement Rock
Insitu leach - low CAPEX - low OPEX
Multiples lower Capex vs all other REE projects
https://mcreresources.com/
Highly Profitable at US$60/kg NdPr
(Spot Price)
Annual Production
Cash Costs
NPV8 (post-tax LOM)
(LOM avg)
US$6.15/kg TREO
US$498M
8,700t MREC
US$16.95/kg NdPr
4,800t TREO
NPV8 (post-tax Spot)
1,800t MREO
Free Cash Flow (post-tax
LOM)
Pre-production Capital
US$67Mpa
IRR (LOM)
US$55M
Free Cash Flow (post-tax
Spot)
IRR (Spot)
includes 35% contingency
US$355M
55%
Mine Life
US$48Mpa
52%
20 years – starter area
Total free Cash (post-tax
LOM)
Payback Period
only
US$1.3B
~2.4 years
Brazilian Critical Minerals (ASX:BCM) : Ema Scoping Study: Ultra Low Capex & Opex 26th February 2025
Capex and Operating Costs
Capex
Unit
Spot
LOM
Pre-production capital expenditure
US$M
55
55
LOM sustaining capital expenditure
US$ / year
1.59
1.59
Unit cash operating costs
Unit
Spot
LOM
Annual operating cost
US$M
29.4
29.4
Annual operating cost
US$/kg TREO
6.15
6.15
Annual AISC
US$/kg TREO
6.69
6.69
Argus Media 2025 – Global Rare Earths market outlook February 2025
Capex of US$55M includes
35% contingency
Lowest published Capex to
produce high value mixed
rare earth carbonate (MREC)
In-situ recovery capable of
producing REO at world’s
lowest possible cost
structure and highest
margins
Brazilian Critical Minerals (ASX:BCM) : Ema Scoping Study: Ultra Low Capex & Opex 26th February 2025
Capex Cost
US$M
%
of total
Equipment
6.01
11.8%
Materials
1.50
2.9%
Plant Construction
17.11
33.5%
Wellfield Installation
4.62
9.1%
EPCM
5.27
10.3%
Owner's Cost
1.46
2.9%
Other
1.83
3.6%
Contingency (35%)
13.23
25.9%
Sub-Total
51.03
100%
Pre-production drilling
4.10
Total
55.23
CAPEX
Direct Costs
Indirect Costs
• Project is simple, low-risk and
quick to establish
• Pre-production Capex Ultra low
• Largest cost centres are well
field setup and plant earthworks
• Ideal geology and topography
alIow for ISR to develop Lowest
Opex and Capex of any rare
earth project in development
producing an MREC
US$55M Capex – 2.4 year Payback
Cumulative Net Cash Position US$M
1400
1200
1000
Expansion
capital
(US$22M)
from cash
flow
800
600
400
~2.4 years
payback
200
0
-1
1
2
3
4
5
6
7
8
-200
10
11
12
13
14
15
16
17
18
19
20
Years
LOM @ US$74/kg NdPr
LOM NPV – US$498M (post-tax)
Spot NPV – US$355M (post-tax)
REE Prices www.giti.sg/markets
9
Spot Price @ US$60/kg NdPr
LOM Pricing - US$74*/kg NdPr avg
Spot Pricing – US$60*/kg NdPr avg
*LOM – US$60/kg NdPr first 4 years
*Spot - US$60*/kg NdPr flat
Operating Costs
Annual Operating Cost by Category
Product transport
Operating Costs (Real LOM)
Average
Total Cost
Cost Annual
LOM
(US$M)
(US$M)
5%
Wellfield Drilling
1%
Wellfield Power
2%
G&A
7%
Fixed
26%
Well Field Drilling
0.34
7.1
Well Field Pumping
0.67
13.6
Fixed – Average LOM
7.62
155
Variable – Average LOM
17.36
347
G & A – Average LOM
2.00
41
1.44
29
29.43
593
Unit
US$/kg
• Owner operator power generation
Operating Cost (LOM)
US$/kg TREO
6.15
• Access to local processing water
Operating Cost (LOM) - AISC
US$/kg TREO
6.69
Operating Cost (LOM)
US$/kg NdPr
16.95
Process Plant
Product transport – Average
LOM
Total
Variable
59%
• ISR Recovery Mining – common in REE ionic clay extraction
• Simple process flowsheet, 4 steps to final product
• High metallurgical recoveries of key REE elements
• Green, ESG complaint, magnesium sulfate reagent usage
• Access to local transport infrastructure
• All transport costs are CIF Asia
• Accommodation facilities in nearby towns
Long Life - Ultra Low Opex
2024 REO Cash Cost Curve
Annual Production Profile
12,000
40
TREO tpa
MREO tpa
Cost of production US$/kg TREO
MREC tpa
Product Sales (t)
10,000
8,000
6,000
4,000
2,000
30
Ultra low All-in-Sustaining Cost
20
10
0
0
1
2
3
4
5
6
7
8
9
10
11
12 13 14 15 16 17 18 19 20
Years
Opex (US$6.69/kg)
92,750
165,500
248,250
REO (t)
MREC ~ 8,700tpa, inclusive of
~ 4,800tpa TREO, containing
~ 1,800tpa MREO
LOM (AISC) US$6.69/kg TREO
Brazilian Critical Minerals (ASX:BCM) : Ema Scoping Study: Ultra Low Capex & Opex 26th February 2025
331,000
Key Financial Measures
Cashflow & Earnings
Unit
Spot
LOM
NPV, returns and key metrics
Unit
Spot
LOM
Annual Revenue
US$M
143
182
NPV8% (post-tax, ungeared)
US$M
355
498
Revenue (gross)
US$M
2,869
3,634
IRR (post-tax, nominal basis)
%
52
55
Project net cashflow
(post-tax)
US$M
911
1,279
Payback period (post-tax, from first
production)
Years
2.4
2.4
Capital efficiency (post-tax NPV /
capex)
%
449
601
Rare Earth Pricing
Unit
Spot
LOM
R$/US$ (long term forecast)
USr
0.174
0.174
TREO price forecast
US$/kg
30
37
NdPr price forecast
US$/kg
60
74
Metrics
Ema able to generate exceptional
returns post-tax at current spot
prices
Gross and Average Revenue: no payabilities applied
Price Forecast: BCM Internal assessment
Passes the Stress Test
Post-tax (LOM)
US$
• US$66/kg NdPr – 13% lower than LOM
Base Case (NPV US$498M, IRR 55%)
(US$M)
$66/kg
NdPr
$60/kg NdPr $53/kg NdPr
flat
flat
NPV
394
355
Discount Rate
8%
IRR
CE (NPV/Capex)
avg price (US$74/kg), escalated in
year 5
Opex 50%
higher
Plant Capex
50% higher
265
398
461
8%
8%
8%
8%
47%
52%
40%
45%
41%
476%
428%
321%
481%
376%
• US$60/kg NdPr – 24% lower than LOM
avg price (US$74/kg) maintained flat
• US$53/kg NdPr – 40% lower than LOM
avg price (US$74/kg) maintained flat
• Project not sensitive to Capex and
Opex cost fluctuations
Under every stressed
scenario the project is
extremly cash flow positive
Brazilian Ionic Clay projects
Unit
BCM
MEI
Aclara
VMM
Scoping
Scoping
PEA
Scoping
Date
Feb 2025
Oct 2024
Sep 2024
Feb 2025
Project
Ema
Caldeira
Carina
Colossus
years
20
20
22
20
US$/kg (NdPr)
74
111
197
90
NPV (pre-tax)
US$M
668
1,403
2,337
1,433
IRR (pre-tax)
%
63
40
32
43
US$/kg (NdPr)
60
60
n/a
60
NPV (post-tax)
US$M
355
174
n/a
388
IRR (post-tax)
%
52
15
n/a
20
US$M
55
403
593
373
%
35
35
30
30
Operating Cost (LOM)
US$/kg TREO
6.15
6.74
27.60
6.00
Operating Cost (LOM)
US$/kg NdPr
16.95
20.41
96.69
16.86
%
70
70
87
70
Mine Life
Price Forecast - LOM
Price Forecast - Spot
Capex
Inclusive Capex Contingency
Payability
Capex - US$55M
• 7 x smaller than MEI
• 7 x smaller then VMM
• 11 x smaller than Aclara
Industry low Opex and
Capex
Industry high NPV and IRR
Brazilian Critical Minerals (ASX:BCM) : Ema Scoping Study – Outstanding Financial Metrics 25th February 2025
Viridis Mining & Metals (ASX:VMM) Scoping Study Confirms Colossus as Premier Rare Project Globally 25 th February 2025
Meteoric Resources NL (ASX:MEI) : High-Grade Figueira Resource Improves Scoping Study Metrics 22nd October 2024
Aclara Resources Inc (TSE: ARA) : Aclara announces updated PEA for its flagship Carina Module 5th September 2024
Brazilian Ionic Clay projects
ISR: Simple extraction & flow sheet drives ultra-low capex and opex
Operating Cost
US$/kg TREO
30
10
All-in-Sustaining-Costs
US$/kg TREO
700
9
600
8
15
27.6
10
Industry
lowest
7
Best in
Class
500
6
5
8.87
4
3
8.80
6.69
6.15
6.74
6.00
Meteoric
VMM
300
100
1
0
BCM
400
Aclara
0
0
BCM
$593
$403
200
2
5
Capital Cost US$M
20
Operating Cost US$/kg TREO
Operating Cost US$/kg TREO
25
Capex
(inclusive of contingency)
Meteoric
VMM
$373
Best in
Class
$55
BCM
Meteoric
VMM
Industry leading Capex and Opex of any rare earth project
Brazilian Critical Minerals (ASX:BCM) : Ema Scoping Study – Outstanding Financial Metrics 25th February 2025
Viridis Mining & Metals (ASX:VMM) Scoping Study Confirms Colossus as Premier Rare Project Globally 25 th February 2025
Meteoric Resources NL (ASX:MEI) : High-Grade Figueira Resource Improves Scoping Study Metrics 22nd October 2024
Aclara Resources Inc (TSE: ARA) : Aclara announces updated PEA for its flagship Carina Module 5th September 2024
Aclara
Brazilian Ionic Clay - AISC
All - in - Sustaining - Cost vs LOM Price
90
AISC - US$/kg
100
90
80
80
70
70
60
60
50
50
40
40
30
30
20
20
10
10
0
0
1
2
3
4
5
AISC - US$/kg NdPr
6
7
8
9
10
11
AISC - US$/kg TREO
12
13
14
15
16
17
18
19
LOM - forecast price
100
20
Price Forecast US$/kg NdPr - LOM
Lowest LOM Price –
US$74/kg
Low All in Sustaining Cost –
US$6.69/kg TREO
(Lowest for any REE project
generating an MREC)
High Margins and
Profitability
High NPV post tax
15% corporate tax rate used for first 10 years
Brazilian Critical Minerals (ASX:BCM) : Ema Scoping Study: Ultra Low Capex & Opex 26th February 2025
Brazilian Ionic Clay – REE Prices
C1 Costs vs Spot Price vs LOM price
140
LOM Price US$74/kg –
NPV US$498M
Lowest avg price used for any
REE project
120
100
US$ / kg (NdPr)
LOM Price
80
60
40
Spot Price NPV: US$355M
Post Tax NPV @ US$60/kg NdPr
3
11
Spot Price US$60/kg –
NPV US$355M
20
0
1
2
4
5
6
7
C1 Costs US$/kg NdPr
8
9
10
12
13
NdPr Spot Price
14
15
16
17
18
NdPr LOM Price
19
20
Superior returns at different
price points
Project does not require elevated REE prices to generate strong returns
Brazilian Critical Minerals (ASX:BCM) : Ema Scoping Study: Ultra Low Capex & Opex 26th February 2025
Large Resource Base
Central Starter Area Mineral Resource Estimate – February 2025
73% of Central Starter Area classified as Indicated Resource
746 341M
TREO ppm
Tonnes Mt
25% 190
MREO:TREO
NdPr + DyTb ppm
Ema REE Project 2025 Mineral Resource Estimate – Central Starter Zone
JORC
Category
cut-off
ppm
TREO
Tonnes
Mt
TREO
ppm
NdPr
ppm
DyTb
ppm
MREO
ppm
MREO:TREO
%
Indicated
500
248
759
176
16
192
25
Inferred
500
93
712
168
16
185
26
*Total
500
341
746
174
16
190
25
Ema REE Project 2025 Mineral Resource Estimate – Global MRE
Ind + Inf
500
943
716
168
16
184
26
Global MRE 943Mt is inclusive of Central Starter Zone total of 341Mt
Brazilian Critical Minerals (ASX:BCM) : Ema MRE Delivers Significant Increase in Indicated Resource 21st February 2025
In-Situ REE Mining
“highest margin REE operations
World wide”
• Readily leachable clays laden
with rare earths
• Suitable topography
• Impermeable bedrock
• High proportion of silica ~50% in clay
allows solution flow
• Lower proportion of clay materials
prevents solution blocking
• Volumes of pores (air spaces) in the
clay allows solution flow
• Proven decades old technology
Rare Earths
• Only green reagents utilised
• Using gravity as our natural
pumping system
Argus Media 2025 – Global Rare Earths market outlook February 2025
• ISR accelerates natural
processes in the ground
Superior Basket Price
SPOT MREC BASKET
Head Grade (ppm)
Reagent
Time
pH
Product
VMM
MEI
965
Magnesium Sulfate
30 Minutes
4.5
MREC
4,472
Ammonium Sulfate
30 Minutes
4.5
MREC
4,439
Ammonium Sulfate
30 Minutes
4.5
MREC
Price (12.02.25)
USD/kg
0.53
1.14
62.47
61.36
2.09
27.19
23.15
859.02
242.64
66.24
41.14
112.40
14.08
718.17
5.72
Oxide
La2O3
CeO2
Pr6O11
Nd2O3
Sm2O3
Eu2O3
Gd2O3
Tb4O7
Dy2O3
Ho2O3
Er2O3
Tm2O3
Yb2O3
Lu2O3
Y2O3
BCM
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
%
Basket $
%
Basket $
%
34.7
8.9
7.1
29.1
4.6
0.5
2.9
0.3
1.4
0.2
0.7
0.1
0.6
0.1
8.7
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
44.5
2.4
8.3
29.2
3.2
0.8
2.1
0.3
1.2
0.2
0.5
0.1
0.3
0.0
6.9
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
57.6
1.4
8.6
22.0
2.4
0.6
1.5
0.2
0.8
0.1
0.3
0.0
0.1
0.0
4.5
0.18
0.10
4.45
17.88
0.10
0.15
0.67
2.33
3.33
0.16
0.29
0.11
0.08
0.60
0.50
0.24
0.03
5.20
17.89
0.07
0.23
0.49
2.23
2.86
0.14
0.19
0.06
0.04
0.29
0.40
Basket $
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
0.30
0.02
5.34
13.50
0.05
0.16
0.35
1.72
1.94
0.07
0.12
0.01
0.01
0.07
0.26
Basket Price US$/kg (TREO)
$
30.93
$
30.34 $
23.92
Basket Price US$/kg (NdPrDyTb)
$
27.99
$
28.19 $
22.50
MREO %
TREO %
37.9
38.9
31.6
100.0
100.0
100.0
1 Viridis Mining and Minerals (ASX:VMM) ASX Announcement “Colossus Maiden Mixed Rare Earth Carbonate (MREC) Product 24.09.24
Prices www.giti.sg/markets
90%
Highly comparable
Magnet value in Basket
38%
Highly comparable
MREO:TREO – leading composition for Ionic Clay
$30.93
Best in Class
Value of Basket – highest for Ionic clay
Ema – delivering
exceptional results
Resource
Large Mineral
Resource 943Mt
Starter Area 20
year mine life
38% MREO
inside TREO
Geology
Supply
Capex & Opex
Investment
Ultra Low Capex
US$55M
Unique attributes
similar to
Chinese projects
allow low-cost
ISR mining
Ultra Low-cost
NdPr production
Highly Profitable
at current spot
price
Factor of 5-30
times lower
Capex than
other REE
projects
Opex US$6.15/kg
TREO
•
NPV US$498M
•
IRR 55%
•
2.4 year
payback
Scoping Study – Key Contributors
Responsibility
Environmental Baseline Studies
Mineral Resource Estimation, pit shell optimisation and
drilling field supervision
Geochemical Assay
Metallurgical testwork
Hydrology and Well Field Design
Process design, concept plant layout and project cost
estimate development
Company
Enquiries
For more information please contact:
Andrew Reid
Managing Director
Brazilian Critical Minerals Limited
Andrew.reid@braziliancriticalminerals.com
QUESTIONS
Share your feedback
Discover