Interim Report - 31 December 2024
Brazilian Critical Minerals Limited
Contents
31 December 2024
Corporate directory
Review of operations
Directors' report
Auditor's independence declaration
Consolidated statement of profit or loss and other comprehensive income
Consolidated statement of financial position
Consolidated statement of changes in equity
Consolidated statement of cash flows
Notes to the consolidated financial statements
Directors' declaration
Independent auditor's review report to the members of Brazilian Critical Minerals Limited
1
2
3
19
21
22
23
24
25
26
39
40
Brazilian Critical Minerals Limited
Corporate directory
31 December 2024
Directors
Jeremy Robinson - Non-Executive Chairman
Andrew Reid - Managing Director
Ben Donovan - Non-Executive Director
Company secretary
Ben Donovan
Registered office
Level 28, AMP Tower
140 St Georges Terrace
Perth WA 6000
T: +61 8 6383 7820
Principal place of business
Level 28, AMP Tower
140 St Georges Terrace
Perth WA 6000
T: +61 8 6383 7820
Share register
Automic Pty Ltd
Level 5, 191 St Georges Terrace
Perth WA 6000
T: 08 9324 2099
Auditor
William Buck Audit (WA) Pty Ltd
Level 3, 15 Labouchere Road
South Perth WA 6151
Solicitors
Steinepreis Paganin
Level 14 QV1
250 St Georges Terrace
Perth WA 6000
Stock exchange listing
Brazilian Critical Minerals Limited shares are listed on the Australian Securities Exchange
(ASX code: BCM)
Website
www.braziliancriticalminerals.com
2
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
Figure 1. Location of the Ema Project, Brazil.
Brazilian Critical Minerals (BCM or the Company) progressed with an aggressive multi-pronged approach to the Ema
project development during the half-year ended 31 December 2024.
The EMA ionic REE project is unique amongst Brazilian REE projects in that it shares almost identical characteristics
with the ionic REE deposits developed over felsic volcanic rocks in southwest China, the world’s largest known ionic
clay region, where a substantial portion of the world’s Total Rare Earth Oxides (TREO) raw material production is
currently being mined.
Infill Resource Drilling
Exploration drilling was conducted with hand-held auger drills, which offer the advantage of low-cost, rapid
deployment and mobility. One key constraint of auger drilling is the depth limitation, with the deepest holes,
generally containing the highest-grade results, drilled to no more than 20m depth. Most of the exploration to date
has been conducted on widely spaced (800m) drill centres, with infill drilling to 400m centres in the central resource
area which is the current drilling focus.
BCM embarked on a 270-hole auger drilling program which was completed during Q4 2024. The primary aim of the
drilling is to convert sufficient tonnage of material from the JORC Inferred category to Indicated which will support
the initial mining/treatment operations currently being considered and an updated Mineral Resource Estimate
(MRE) which will form the foundation of the Scoping Study.
First assays from 45 holes received from the Mineral Resource infill drilling program showed grades and thicknesses
that were consistent with earlier drilling programs, validating the reliability of the resource model.
Persistent high NdPr grades were observed in the lower horizon (10-20m below surface), indicating a robust zone of
mineralisation that could enhance the project's economic viability. Several exceptional high-grade intercepts were
identified, warranting further investigation to define priority zones for In Situ Recovery (ISR) extraction methods.
These high-grade zones have the potential to significantly impact resource extraction strategies. The majority of
the drilling program was completed by the end of November.
3
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
The high priority area, red dashed line area (Figure 2) comprises approximately 24% of the previously drilled MRE
area. Drilling commenced on the western portion of this area (Figures 2 and 3) with initial assays received for 45
holes on the western margin of the infill-drilled area (Figure 3).
Assays returned over 500 ppm TREO across multiple holes, generally over widths of 5-10 meters, confirming the
consistency of mineralisation across broad areas. Results indicate a strong increase in grade towards the base of
the weathering profile, with notable concentrations of magnet rare earth oxides (MREO’s) located deeper within
the profile.
Several holes encountered water at the bottom of holes, preventing the obtaining of samples through the high-grade
zone.
Figure 1 - Ema REE project – Mineral Resource covering 82 km2 with auger holes on 800m spacing and infill
auger holes on 400m centres over 20 sq km.
1
Significant results :
• 9.3m@1,347ppm TREO from 4m (EMA-TR-196), ending in 891ppm TREO
•
6m@1,103ppm TREO from 8m (EMA-TR-182), ending in 1,767ppm TREO
•
8m@1,026ppm TREO from 2m (EMA-TR-192), ending in 1,418ppm TREO
•
9m@931ppm TREO from 1m (EMA-TR-172), ending in 1,193ppm TREO
•
10m@1,103ppm TREO from 10m (EMA-TR-236), ending in 1,817ppm TREO
•
9.7m@1,081ppm TREO from 2m (EMA-TR-229), ending in 1,398ppm TREO
•
10m@1,086ppm TREO from 8m (EMA-TR-258), ending in 1,765ppm TREO
•
9.6m@1,149ppm TREO from 5m (EMA-TR-245), ending in 837ppm TREO
•
9.8m@1,107ppm TREO from 3m (EMA-TR-238), ending in 771ppm TREO
•
9.3m@1,347ppm TREO from 4m (EMA-TR-196), ending in 891ppm TREO
•
6m@1,103ppm TREO from 8m (EMA-TR-182), ending in 1,767ppm TREO
4
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
•
8m@1,026ppm TREO from 2m (EMA-TR-192), ending in 1,418ppm TREO
•
9m@931ppm TREO from 1m (EMA-TR-172), ending in 1,193ppm TREO
•
9m@725ppm TREO from 3m (EMa-TR-186), ending in 1,180ppm TREO
Figure 2 - Location map of the auger infill holes with assay results received to date.
Figure 3 - Cross section from EMA-172 to 192
Despite the variability in collar elevations of the drilled holes, the typical enrichment of Neodymium (Nd) and
Praseodymium (Pr) is consistently encountered at a similar depth within the lower saprolite zone, located just above
the fresh rock. The enriched zone generally measures around 10 meters in thickness indicating a continuous
mineralised horizon. This widespread occurrence strongly suggests the presence of continuous high-grade zones
across the project area.
5
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
The TREO grade exhibits a marked increase with depth, ranging from approximately 500ppm near the top of the
enriched zone to values reaching up to 1,880ppm at greater depths. Importantly, the proportion of valuable heavy
rare earth elements (HREEs) increases to over 31% at the end of the holes, highlighting the economic potential of
the lower saprolite zones.
Holes EMA-TR-172, 173 and 196 (Figure 4) are examples of the lower enrichment zone with the presence of high
NdPr grades at the base of drilling in the lowest weathering zone. It is anticipated that this enrichment will be
present in all holes in which the low weathering horizon is intersected.
Figure 4 - Drill-hole profiles showing typical enrichment zone with high NdPr grades close to the fresh rock interface.
Scoping Study
In April 2024 the Company announced a large Mineral Resource Estimate2 and subsequently very high rates of
economic recovery3, with the Board approving a formal Scoping Study on the technical and economic development
of the Ema project which will examine the potential for a standalone low capital treatment/development pathway
for the project.
The company has now engaged several specialist companies to commence activities with respect to the Ema rare
earth scoping study. The team members all have extensive experience in rare earths. The study will cover project
aspects including heritage, environmental, metallurgy, mining engineering, geology and hydrogeology.
The scoping study will assess potential in-situ leach processing of the Ema project. The bulk of the hydrology-related
data gathering was concluded by year’s end
•
•
•
•
Ausenco: to provide engineering services for high-level scoping engineering outputs;
WSP: to demonstrate the suitability of ISR and to gather hydraulic data (aquifer properties,
pumping/injection rates to assess ISR feasibility and to provide information for the development of a
numerical groundwater model based on field trials).
GE21: to complete an updated mineral resource estimate based on JORC 2012 Code standards; and
CERN: to conduct baseline environmental assessment with a view to preparation of Environmental
Studies report for submission of a preliminary license application.
The final scoping report was delivered post year end.
6
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
Figure 6 – Location map of the auger infill holes with assay results received to date, with cross section A-B.
ANSTO Metallurgical Test Work
Work being undertaken by ANSTO over the last several months has resulted in very high recoveries of NdPr4.
IMPURITY LEVELS
Impurities affect REE recovery and precipitation efficiencies and are a vital component of the process to understand.
Control of the most troublesome impurities (Al, Fe, Th, U) depends on their concentration and the degree of purity
required in the MREC.
ANSTO reported the final slurry leach test results which confirm very low concentrations of deleterious or impurity
elements for the Ema material.
Table 1. Impurity values following optimised testing and leaching of Ema master composite sample.
mg/l
Uranium
Thorium
Aluminum
Iron
Calcium
Silica
0.2
0.02
73
<1
11
6
Figure 7. Key steps in the process flow sheet for ionic clay MREC production. REE Leaching section highlighted represents stage
of processing where results from Table 1. above were sourced.
The Company is now confident that these low uranium and thorium values can be removed through simple pH
adjustment during the next stage of impurity removal leading to a final MREC product that meets European, North
American and Asian offtake partners for specification testing to advance discussions regarding commercial offtake.
7
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
HEAP LEACH TEST WORK SUMMARY
ANSTO investigated a heap leaching option through column testing (Table 2 and Figure 7). Two 50mm diameter
columns were operated with a bed height of 1.14m, with the following specifications to test two reagents:
Table 2. Column testing setup specifications
0.3M Ammonium Sulfate
0.5M Magnesium Sulfate
Bed Height
1.14 m
1.14 m
Column Diameter
50 mm
50 mm
Ore mass
2,970 g
2,970 g
Reagent
(NH4)2SO4
MgSO4
Concentration
0.3 M
0.5 M
pH
4.5
4.5
Binding Addition
300 g/t
300 g/t
Irrigation Rate
5 L/m2/hr
5 L/m2/hr
This heap leach test work is a key part of the Company’s ongoing strategy to grow and progress the Ema Inferred
Mineral Resource towards development, which currently sits at 1.02Bt @ 793ppm2. The final calculated leach liquor
and residue recovery of 63% was materially in line with previously announced slurry recovery results2.
Column leach liquor results using magnesium sulfate returned recovery values*:
•
Time Period
Nd (%)
Pr (%)
Dy (%)
Tb (%)
4 days
42
41
30
34
6 days
52
51
36
41
11 days
57
55
40
45
*Calculated based on head assay and leach liquor analysis
Final recovery based on head assay and residue analysis after 18 days of leaching
followed by washing recorded;
Combined
Recovery
63%
MREO (Nd/Pr/Dy/Tb)
•
The ore agglomerated readily in the test liquor (no additional acid was required) and the
agglomerated ore remained competent in the column test
•
Permeability of the column bed was good, with minimal bed slump of 1% calculated
•
Test conditions involved REE desorption utilising 0.5 M magnesium sulfate (MgSO4) or 0.3 M
ammonium sulfate (NH4)2SO4, ambient temperature at pH of 4.5
Acid consumption was calculated to be < 1 kg/t
•
8
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
These results have given the Company confidence that there is an increased likelihood that in-situ leaching of the
rare earths is now possible. This is largely feasible due to the mineralogy of the Ema mineralisation which is almost
50% quartz and hence this sandy clay material allows for good percolation and fluid flow at rates which could be
economic.
Agglomeration of clay ores does not produce typical agglomerates, rather it is required to wet the ore and bind the
fines together. A small amount of binding solution was added followed by the test lixiviant solution (at pH 4.5) to a
target moisture content of ~23 wt% (Figure 8).
The two column tests were run in transparent PVC columns of 1.2 m x 50 mm (ID). A bed height of just over 1 m
was obtained by loading agglomerated ore (~3 kg dry) into the column and curing for 24 hours. Both columns were
run concurrently and were operated at room temperature.
The lixiviant solution was fed to the top of the column by peristaltic pump, with an initial target irrigation rate of ~5
L/h/m2.
Irrigation was stopped on day 18 and draining commenced, this was followed by 2 days of washing using tap water.
Figure 8 - Column setup and agglomeration of ore at the ANSTO facility in Sydney.
Field permeability and lab testing for In-situ Leaching
A series of preliminary controlled field experiments (slug tests) performed by the BCM team was completed on 10
dry drill holes (Figure 9). These tests estimate the hydraulic properties of aquifers, in which the water level in a
controlled open dry drill hole is caused to rise suddenly and the subsequent water-level response (change from
static) is measured through time at regular intervals.
9
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
Figure 9. Location map of the 10 drill holes which were tested for permeability.
The slug tests were designed as a rising-head test, in which a measured volume of 50l of water was placed into 10
holes, instantaneously raising the water level in the well by a known amount.
The goal of a slug test is to estimate the hydraulic properties of an aquifer system such as hydraulic conductivity.
Percolation data shows that the majority of the water inserted into each hole was lost or permeated into the
surrounding walls within the first 60 minutes (Figure 10). The second phase is the stable percolation stage, where
the water adsorption nears completion, and the percolation rate gradually decreases.
10
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
Figure 10. Hydraulic conductivity results from drill holes (TR174 & TR183). Tests show a rapid fall in water level over the first 60
minutes post the water insertion. Data from the 10 holes is collated in table 3.
Percolation rates varied from 0.98m/hr to 2.34m/hr and show that there is a high degree of permeability within the
clay horizons containing the rare earths. ield pumping trials are scheduled to commence during the first half of
2025.
The percolation characteristics of clay minerals are influenced by multiple factors, including ore composition, pore
structure, permeability, and the properties of the leaching solution.
Table 3. Hydraulic conductivity results from the 10 dry drill holes tested. Tests show a rapid fall in water level (in metres)
over the first 60 mins post the water insertion.
Time (mins)
0
30
60
90
120
150
180
210
Static Water
level (m)
Percolation
m/hr
Hole Depth (m)
TR
158
4.42
9.00
9.52
9.82
9.94
9.98
TR
168
7.35
10.94
12.13
12.46
12.58
12.70
TR
168A
5.95
6.58
7.90
8.18
8.35
8.39
TR
164
5.40
8.55
8.77
8.80
8.86
TR
165
5.82
10.63
11.32
11.64
11.78
11.88
11.97
TR
177
9.92
9.95
TR
170
0.70
4.84
5.06
5.20
5.26
TR
181
0.35
5.40
5.82
5.98
6.09
6.12
TR
174
2.09
7.63
7.90
7.95
TR
183
3.00
7.43
7.96
8.22
8.36
8.46
8.57
8.60
9.98
12.70
dry
8.86
12.30
9.95
dry
dry
7.95
8.60
2.22
2.14
0.98
1.73
2.05
n/a
2.28
2.31
2.34
2.24
12.00
19.80
8.39
12.00 15.00 13.00 5.26
6.50
12.00
19.80
11
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
Lab Diffusion Testing
Agitated elution tests allow rapid access of reagent to the mineral surface and thus rapid desorption of the eluted species,
however, in an in-situ scenario this access is limited by solution flow through discrete channels in the ore bed and diffusion
through interstitial spaces.
While macroscopic solution flow in in-situ operations can be modelled with hydrological models based on field observations,
the local transport reaction kinetics of the elution process needs to be tested separately.
A series of diffusion tests were conducted in a stagnant bed leach apparatus developed by Petersen [1] as shown in Figure 11.
A bed of 100 g of clay mineralisation was carefully moulded into the bottom of a beaker to a height of about 10 mm, and 200
mL of lixiviant (0.5 M and 0.1 M MgSO4) was very carefully poured on top of the bed so to not stir up solids. The solution was
gently agitated with an overhead stirrer. Liquid samples (3–5 mL) were taken every day for 30 days. The samples were analyzed
by ICP- MS.
Figure 11. Stagnant bed diffusion test developed by Petersen.
Figure 12. Overall cumulative recoveries from diffusion testing utilizing magnesium sulfate at 0.5 M and 0.1M concentrations
over 30 days.
12
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
The results of the stagnant bed diffusion test are shown in Figure 12. All of the magnet rare earth elements leached in
significant quantities; (Nd, Pr, Dy, Tb) are shown. The curves show the characteristic profiles for a diffusiongoverned process, reaching equilibrium extraction (that is the extraction to be expected if solid and liquid were
perfectly mixed) over 30 days.
ISR is a proven cost effective and environmentally acceptable extraction process, which accounts for approximately
57% of world uranium mined, and is used in Australia, USA, Kazakhstan, and Uzbekistan.
MREC Production
The Mixed Rare Earth Carbonate (MREC) produced from the test work contained 55.3% rare earth oxides (REO) and
only ~2.0% impurities based on test work conducted using a 41kg sample from the Ema 2 master composite sample.
Through the impurity removal and carbonate precipitation process steps, approximately 33.2 grams of high-quality
MREC was generated, Figure 6.
Figure 13. Simple 4 step process flow sheet for ionic clay MREC production at Ema Project
This result highlights the efficiency of the magnesium sulfate process on the Ema material in producing a highgrade, low-impurity MREC product, which is critical for meeting industry standards and optimizing the economic
viability of the project at the same time as generating outstanding revenue potential through the basket price
calculation (Figure 14). The purity level of the MREC positions this product as highly competitive in the market,
further validating the potential path taken to process the Ema material.
The composition of the magnet elements in the final MREC and recoveries achieved through the processing steps
in testwork result in an exceptionally high basket price despite the significantly lower head grade of the tested
samples relative to our peers, and when combined with a potentially low-cost mining and processing flow sheet,
has the potential to place the project in a good position to tap into the rapidly growing demand. The table below
compares the final MREC products of BCM, with our key Brazilian peers, Viridis Mining and Minerals Ltd (VMM),
and Meteoric Resources NL (MEI).
13
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
?L;
T22:
2OU:
LJI
2#-."E1P*%?P4P#I"
H9%21.PI"E
=;I
9;H
=S=O<
H**3.1P*%?P4P#I"
H9%21.PI"E
=;I
9;H
=S=HL
H**3.1P*%?P4P#I"
H9%21.PI"E
=;I
9;I
78I9:+;<=L
G#<5H
M"5<
!"#$%%
I01$?*<5H
OP<5H
&$<5H
34($,
561$!3<5H
OG<5H
0*<5H
QR<5H
GP<5H
!"#$%&G#$"%())*+
H-".I
01*"
)!
234#G
7G18"%(9:;::;<=+
L?@ABF%%%%%%%%%%%%%%%%%%%%%%%%%9;IJ
F%%%%%%%%%%%%%%%%%%%%%%%%%:;9:
*+++++++++++++++++++++++#F'()
*+++++++++++++++++++++++#F'()
F%%%%%%%%%%%%%%%%%%%%%%%%%<;:9
F%%%%%%%%%%%%%%%%%%%%%%%<O;HI
F%%%%%%%%%%%%%%%%%%%%%%%<=;JN
*+++++++++++++++++++++.-2'2)
*+++++++++++++++++++++1(,'(1
F%%%%%%%%%%%%%%%%%%%%%%%O<;I=
F%%%%%%%%%%%%%%%%%%%%%%%=<;J9
F%%%%%%%%%%%%%%%%%%%%%::H;H:
F%%%%%%%%%%%%%%%%%%%%%%%:=;9J
F%%%%%%%%%%%%%%%%%%%%%OIL;:<
Q<5H
F%%%%%%%%%%%%%%%%%%%%%%%%%I;L9
561$"
?@ABCM+!"NFC+G3<=$H
?@ABCM+!"NFC+GI0!"5634H+
2VO5%C
0VO5%C
C
M#EB"I%F
C
M#EB"I%F
C
M#EB"I%F
H=;O
N;L
,'%
12'%
=;J
9;I
<;L
F'%'(
9;<
9;O
9;:
9;J
9;:
F%%%%%%%%%9;:L
F%%%%%%%%%9;9L
*+++++++++('-%
*++++++%,'#%
F%%%%%%%%%9;:9
F%%%%%%%%%9;:I
F%%%%%%%%%9;O:
*+++++++++1'1.
*+++++++++-'-2
F%%%%%%%%%9;:N
F%%%%%%%%%9;H9
F%%%%%%%%%9;::
F%%%%%%%%%9;9N
F%%%%%%%%%9;J=
==;I
<;=
.'12'1
H;<
9;N
<;:
F'%'1
9;<
9;I
9;:
9;H
9;9
F%%%%%%%%%9;<I
F%%%%%%%%%9;9<
*+++++++++)'F(
*++++++%,'#1
F%%%%%%%%%9;9O
F%%%%%%%%%9;<H
F%%%%%%%%%9;I<
*+++++++++1'%.
*+++++++++1'21
F%%%%%%%%%9;:I
F%%%%%%%%%9;<9
F%%%%%%%%%9;9J
F%%%%%%%%%9;9=
F%%%%%%%%%9;H9
IO;J
:;=
.'#
11'F
<;=
9;J
:;I
F'1
F'.
9;:
9;H
9;9
9;:
9;9
F%%%%%%%%%9;H<
F%%%%%%%%%9;9:
*+++++++++)'%,
*+++++++%-'-F
F%%%%%%%%%9;9I
F%%%%%%%%%9;:J
F%%%%%%%%%9;HO
*+++++++++%'#.
*+++++++++%'2.
F%%%%%%%%%9;9O
F%%%%%%%%%9;:H
F%%%%%%%%%9;9:
F%%%%%%%%%9;9:
F%%%%%%%%%9;9N
N;O
F%%%%%%%%%9;I:
J;L
F%%%%%%%%%9;=:
=;I
F%%%%%%%%%9;<O
*+++++++++++++++++++++-F'##
*+++++++++++++++++++++1,')2
HO;L
:99;9
F%%%%%%%%%%%%%%%%%%%%%%%H9;9:
F%%%%%%%%%%%%%%%%%%%%%%%<O;OJ
HN;L
:99;9
F%%%%%<H;J:
F%%%%%%%%%%%%%%%%%%%%%<<;:<
H:;J
:99;9
Figure 14. Basket Price calculation and comparison showing high value MREC product relative to Brazilian peers. Spot price
assumptions https://giti.sg/markets/markets_files. 1 Viridis Mining and Minerals (ASX:VMM) ASX Announcement “Colossus
Maiden Mixed Rare Earth Carbonate (MREC) Product 24.09.24
Figure 8. Final Mixed rare earth carbonate product, 33.2 grams, produced at the ANSTO facilities in Sydney.
Impurity Removal (MREC)
The presence of impurities in REE-containing solutions has an enormous impact on not only the final REE products
(MREC), but also on the efficiency of processing. Removal of impurities like aluminium and iron are vital as they can
be detrimental to further downstream solvent extraction separation circuits.
Figure 15. Step 2 of impurity removal in the simple 4 step process flow sheet to produce an MREC.
14
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
A target pH was determined based on results of the Process Development Program, with freshly prepared ~20 wt%
magnesium oxide slurry added to achieve the impurity removal target pH. A total residence time of 30 minutes at
the target pH was maintained.
The testwork revealed that pH played a significant role in the selective removal of Fe impurities and resulted in the
production of high-purity, industry-grade REEs. Through this method the precipitated solid primarily contained
residual aluminium, silica, and magnesium, with minimal loss of REEs. The method achieved a high purity level of
~98% with the remaining ~2.0% containing elements listed below (Figure 16).
23405!"#$%&'&,60&704893:
!"#$%&'(
)*&+,
-.I$,01
!"F'(
)*+F
!"#$%#$%#$
,-".%#$
,-'
)*)+
,I0-"1
,I'
2)*))3
,#'
2)*))3
,I4456
76I8
95F'(
)*):
;I1-KK%#$
=F'
)*)+
L-?85K%#$
L?'
)*+F
L8'
)*)(
L-8?-85K5
B-F'
)*)C
@IA%#$
B%.M5"
B%'
)*FN
F5-A
;0'
)*)3
@%"%.@%'F
2)*F
G%8.
G8'
)*)H
IJI6%#$
IJ
2)*))3
O6-8%#$
O
)*)3
Figure 16. Percentage of impurities carried through to final mixed rare earth carbonate. Impurities totalled ~2.0%.
Logistics Routes Identified
The Company identified logistics route involving trucking 130kms from Ema project to Prainha where regularly
serviced 600t barges take cargo to Port of Chibatão. Route involves direct barging to one of Latin America’s largest
private ports where Panamax sized vessels dock (Port of Chibatão) (Figure 17).
Inspections and discussions have confirmed the suitability of the Port of Prainha, 130kms by road from the Ema
Project, then barging to the Port of Chibatão, with capacity to handle Panamax sized vessels. Several alternative
routes to port have also been identified.
The transport review confirmed that the quality of the road access between the site and port was of a high standard
and suitable for transporting bulk materials at the required rate all year round. The river access from the Port of
Prainha to the Port of Chibatão (Figure 11) takes approximately 5-6 days and can carry cargos up to 600t,
significantly more than the project´s requirements for construction and operating purposes.
Commercial discussions have been initiated, relating to a proposed solution for the storage and ship loading of the
Mixed Rare Earth Carbonate (MREC) final product.
15
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
Figure 17. Logistics Route from Ema Project to Port of Chibatão.
Update on Environmental Baseline Assessment
Environmental Baseline Data Collection continuation and expansion of the collection of certain environmental
baseline data to support the Ema Environmental Impact Assessment which is being conducted by CERN has been
focusing on:
•
•
•
•
Basic Engineering: The basic construction and waste engineering, for the preparation of the environmental
impact assessment
In-depth analysis of potential environmental impacts due to the construction and operation of the
production facility, particularly focusing on the construction of evaporation ponds.
Mitigation Strategies: Development of comprehensive plans to mitigate any identified environmental and
social impacts, including water management plans and habitat restoration initiatives.
Stakeholder Engagement: Continued engagement with local communities and stakeholders to ensure
transparency and address any concerns.
Permeability Field Trials 2025
As part of the feasibility study (FS) planned for 2025, additional field work is required to increase confidence and
reduce risk associated with the application of the ISR mining method at Ema.
Previous field and laboratory testing, completed as part of the scoping study, indicated that flow of mining solution
through the mineralised zone is expected to be viable at rates envisaged for the planned rate of production. The
field work planned for 2025 is focused on in-situ testing in the mineralisation using water and/or a lixiviant to
evaluate hydraulic conditions that can be used to assess mining solution flow between a series of test wells.
To date, all of the wells have been drilled, cased and cemented in ground (Figure 18) and water storage tanks
purchased and mobilised to site.
16
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
The information collected through this process is expected to increase the overall confidence of the application of
ISR and facilitate detailed mine planning as part of a FS. BCM engaged WSP Adelaide to facilitate the design and
implementation of ISR field testing at Ema. WSP Brazil has now been engaged to oversee and operate the well
system as it comes online during the latter stages of Q1.
WSP Adelaide specializes in technical evaluation and field operations regarding subsurface fluid flow and injection
projects, with experience ranging from feasibility studies to operations. The firm has substantial experience in the
ISR uranium mining industry and currently provides consulting services to several ISR projects.
BCM and WSP have designed an ISR field testing program specific to the unique geological characteristics of the
Ema deposit.
Figure 18. Ema permeability field trial setup. White squares are the concreted collars of the drill holes which will be injected
with water and/or lixiviant pumped from the blue storage tanks. Two separate test zones have been developed, one with
shallow holes drilled to 5.7m depth (adjacent to car) and test zone 2 with both injection and extraction holes drilled to 10m
depth adjacent to the 2 10,000 litre water storage tanks.
The testing program aims to provide hydrogeological testing within the central start zone covering the Indicated
Mineral Resource estimated for the deposit.
Data acquired from the ISR field testing program will be utilised to create an integrated hydrogeological model,
which will form the basis for ISR wellfield necessary for the FS and to support the EIA process.
Mou Signed with Brazilian Permanent Magnet Producer
The Company signed a five-year non-binding Memorandum of Understanding (MoU) with SENAI Regional
Department of Minas Gerais, owner of the permanent magnet facility unit Lab Fab (CIT SENAI ITR) (Lab Fab)
Lab Fab is developing the first permanent magnet manufacturing facility in Latin America and the two parties will
cooperate in the technological development of rare earth magnet manufacturing processes.
17
Brazilian Critical Minerals Limited
Review of operations
31 December 2024
Lab Fab is a permanent magnet technology developer, aiming to advance the rare earths industrial chain in Brazil and
produce a range of high-end technology products suited for a range of electric motor industries requiring rare earth
magnets.
The facility plans to commence operation later this year and the Federation of Industries of Minas Gerais plans to
grow production to 200 tonnes of magnets annually.
The non-binding MoU will establish the bases for cooperation between BCM and SENAI Regional Department
moving forward, with a view to jointly develop research, development and innovation for the demonstrative
production of rare earth magnets at Lab Fab, in Lagoa Santa, Minas Gerais, by identifying activities of mutual
interest.
Appointment of non-executive director
The company appointed Mr Ben Donovan as a Non-Executive Director. Mr Donovan currently acts as Company
Secretary and has been
Share your feedback