Investor Presentation
Released
Released
Announcement PDF
Investor Presentation
5 December 2024
ISR Rare Earths
A Green, Low Cost Production Model
Disclaimer
This presentation has been prepared by Brazilan Critical Minerals limited (company).
Competent person statement
This important notice and disclaimer applies to this presentation and any information provided in relation to
or in connection with the information contained in it.
The information in this report that relates to exploration results is based on
information compiled by Mr. Antonio de Castro, BSc (Hons), MAusIMM, CREA, who acts
as BCM´s Senior Consulting Geologist through the consultancy firm, ADC Geologia
Ltda. Mr. de Castro has sufficient experience which is relevant to the type of deposit
under consideration and to the reporting of exploration results and analytical and
metallurgical test work to qualify as a competent person as defined in the 2012 Edition
of the Joint Ore Reserves Committee (JORC) “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Mr. Castro consents to the
report being issued in the form and context in which it appears.
This presentation contains information in summary form. Some of the information is based on publicly
available sources, has not been independently verified or may not be complete. It should be read in
conjunction with the Company’s other continuous and periodic disclosure announcements lodged with
Australian Securities Exchange, which are available at www.asx.com.au.
This presentation contains forward-looking statements which involve a number of risks and uncertainties.
These statements reflect current expectations, intentions or strategies regarding the future and assumptions
based on currently available information. Should one or more of the risks or uncertainties materialize, or
should underlying assumptions prove incorrect, actual results may vary from the expectations, intentions
and strategies described in this presentation.
No representation or warranty is made as to the accuracy, completeness, reliability, fairness, or correctness
of the information contained in this presentation. To the maximum extent permitted by law, no person,
including the company and their related bodies corporate, officers, employees, and representatives
(including agents and advisors), accept any liability or responsibility for loss arising from the use of such
information. This presentation is not a bidder’s statement, prospectus or a product disclosure statement
under the Corporations Act 2001 (Cth) or offering document under any other law. It has not been lodged with
the Australian Securities and Investments Commission.
This presentation is for information purposes only and is not financial product or investment advice or
intended to be used as a basis for making an investment decision. It has been prepared without taking into
account the investment objectives, financial circumstances, taxation position or particular needs of
investors.
This presentation does not constitute an offer to issue or sell, or to arrange to sell, securities or other financial
products. In particular, this presentation and the information contained in it does not constitute a solicitation,
offer or invitation to buy, subscribe for or sell any security in the United States or to or for the account or
benefit of any U.S. Person (as defined in Regulation S under the U.S. Securities Act of 1933, as amended (the
US Securities Act)). The securities referred to in this presentation as being offered or sold have not been, and
will not be, registered under the US Securities Act. Securities may not be offered or sold in the United States
unless they have been registered under the US Securities Act or an exemption from registration is available.
The release, publication or distribution of this presentation in jurisdictions outside Australia may be restricted
by law. Any failure to comply with such restrictions may constitute a violation of applicable securities laws.
The information in this report that relates to exploration results released by the
Company to the ASX on 2 April, 22 April, 3 May and 7 May 2024 is based on information
compiled by Mr. Antonio de Castro, BSc (Hons), MAusIMM, CREA, who acts as BCM´s
Senior Consulting Geologist through the consultancy firm, ADC Geologia Ltda. Mr. de
Castro has sufficient experience which is relevant to the type of deposit under
consideration and to the reporting of exploration results and analytical and
metallurgical test work to qualify as a competent person as defined in the 2012
Edition of the Joint Ore Reserves Committee (JORC) “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Castro consents to
the report being issued in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that
materially affects the information included in the relevant market announcement
and, in the case of mineral resource estimate, that all material assumptions and
technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. Refer to ASX
announcement dated 22 April 2024.
Exploration results and mineral resources
The information in this Presentation that relates to Exploration Results and Mineral
Resources is based upon and fairly represents information previously released to the
ASX on 22 May 2023, 6 June 2023, 17 July 2023, 31 July 2023, 13 September 2023, 3
October 2023, 19 October 2023, 7 December 2023, 29 January 2024, 6 February 2024,
22 February 2024, 13 March 2024, 3 April 2024, 22 April 2024, 3 May 2024, 20 May 2024, 8
July 2024, 2 August 2024 and 6 August 2024.
This presentation has been approved for release by the Board of Directors.
2024 - a lot with a little
1.02Bt
MRE (April)
Scoping Study
Focus on low
cost ISR mining
55%
High value MREC
confirmed (November)
Field
Permeability
Testing
68%
NdPr Recoveries (March)
Infill MRE Drilling
Magnets
Non-bindingMoU signed
with producer (September)
ANSTO
Metallurgical Testing
$2.5m
Environmental Baseline
Assessment
Placement raising
(May/October)
Brazilian REE
Landscape
EMA Rare Earths
Apuí Rare Earths
$11M1
Brazilian
Rare Earths
Serra Verde
EMA Rare Earths – >1Bt MRE
Apuí Rare Earths
30 km south from Apuí
$555M1
Caldera Project
$211M1
1. www.asx.com.au 28.11.24
Rare Earth Clay Deposits
3500
3000
Grade (ppm)
2500
Meteoric
Viridis
In-Production
2000
1500
Aclara
OD6
BRE
1000
Serra
Verde
Xunwu
EMA
Harena
Ionic
500
Typical IAC Grade
Range
0
200
400
600
Tonnes (kt)
800
1000
1200
See Appendix 1 for full reference list
Large Resource Base
Ema REE Project 2024
Mineral Resource Estimate
977 331M
TREO ppm
Tonnes Mt
31% 300
MREO:TREO
NdPr + DyTb ppm
Ema REE Project 2024 Mineral Resource Estimate – by cut-off grade
JORC
Category
cut-off
ppm
TREO
Tonnes
Mt
TREO
ppm
NdPr
ppm
DyTb
ppm
MREO
ppm
MREO:TREO
%
Inferred
0
1,340
694
163
15
178
26
Inferred
500
1,017
793
199
17
216
27
Inferred
900
331
977
278
22
300
31
World’s first fully
green REE project
Large Resource Base
1.02 Billion tonnes, material close to surface,
suitable for ISR mining.
Lower Capital
Lower Capital &
Operating Cost
High Grade MREC
confirmed
Large Resource
Base
1.02Bt
ISR offers a lower capital expenditure to first cash
flow, eliminates all mining costs, has 60% fewer
processing steps involved to final product.
Lower Impact Mining
No mining No blasting No waste rock, No noise, No
dust and No large tailings dams or large open pits.
Magnesium based
green reagents
suitable for ISR
In-situ recovery mining
The most cost effective,
environmentally friendly
method available
RIGHT
RIGHT
RIGHT
Geology
Style of Mineralisation
Confining Layer
Weathering less
than 20m deep
Ore grades directly
above bedrock
Non-fractured
bedrock at shallow
depths
RIGHT
Chemistry
RIGHT
Reagents
RIGHT
High recoveries and
Ionic leaching
Reagents with no detrimental
effects on the environment
MREC with 99% purity
Product
In-situ recovery is a well understood rare
earth mining method
~ 30% of current world production use in
situ-leach recovery
NO
Land Clearing
NO
Noisy Dusty Tuck
Haulage
NO
Open Pit Mining
NO
Large Processing
Facility
NO
Dirty Mining
Equipment
NO
Need for
Reclamation
In-Situ (REE) Recovery
~30% of the world’s production
Reagent injection
well
• Low Capex, Low Opex
• Proven decades old technology
• Only green reagents utilised
REE collection
trench
Leaching zone
REE-rich solution
Basement rock
• Using gravity as our natural
pumping system
• Readily leachable solution
laden with rare earths
• ISR accelerates natural
processes in the ground
Substantially Reduced
Flow Sheet
1
2
4
3
Aclara and Meteoric
Proposed Flow Sheet
Top Soil
Impurity
Removal
Precipitation
MREC
Mining
Direction
Clays
Recycling
Water Fertilizer
Ionic Exchange
Impurity
Removal
Rare Earths
Carbonate
Precipitation
Mixed Rare
Earths
Carbonate
Saprolite
Saprock (orezone)
recycled reagents
Mining
Direction
Backfill of
Clays to
Mine
Clays
Clays
Washing
Nanofiltration
and Reverse
Osmosis
Clays
Water
Rare Earths
Basement Rock
Insitu leach
4 Step process flow sheet
Opportunities to substantially reduce
CAPEX and OPEX
Tank (VAT) leach
10 Step process flow sheet
Commercial ISR Projects
Malaysia
ISR Mining Rare Earths in Malaysia
ISR construction and setup
reagent storage
• I – inground leaching
2
Impurity
removal
3
Precipitation
of REE’s
4
Production of
MREC
• S - simple (tanks and pipes)
• R - rapid leaching kinetics
enhance the viability
• Cost effective
• Quick establishment
• Low opex
https://mcreresources.com/
Superior Basket Price
FINAL MREC
Head Grade (ppm)
Agent
Time
pH
Molar
BCM
VMM1
MEI1
965
Magnesium Sulfate
30 Minutes
4.5
0.3
4,472
Ammonium Sulfate
30 Minutes
4.5
0.3
4,439
Ammonium Sulfate
30 Minutes
4.5
0.5
%
Basket $
%
Basket $
%
La2O3
CeO2
Pr6O11
Nd2O3
Sm2O3
Eu2O3
Gd2O3
Tb4O7
Dy2O3
Ho2O3
Er2O3
Tm2O3
Yb2O3
Price (01.11.24)
USD/kg
$
0.56
$
1.01
$
60.45
$
60.45
$
2.10
$
27.35
$
24.68
$
839.95
$
247.42
$
72.54
$
42.60
$
113.31
$
14.06
34.7
8.9
7.1
29.1
4.6
0.5
2.9
0.3
1.4
0.2
0.7
0.1
0.6
$
$
$
$
$
$
$
$
$
$
$
$
$
0.19
0.09
4.31
17.61
0.10
0.15
0.71
2.28
3.39
0.18
0.30
0.11
0.08
44.5
2.4
8.3
29.2
3.2
0.8
2.1
0.3
1.2
0.2
0.5
0.1
0.3
$
$
$
$
$
$
$
$
$
$
$
$
$
0.25
0.02
5.04
17.62
0.07
0.23
0.52
2.18
2.92
0.15
0.20
0.06
0.04
57.6
1.4
8.6
22.0
2.4
0.6
1.5
0.2
0.8
0.1
0.3
0.0
0.1
$
$
$
$
$
$
$
$
$
$
$
$
$
0.32
0.01
5.17
13.30
0.05
0.16
0.37
1.68
1.98
0.07
0.13
0.01
0.01
Lu2O3
Y2O3
$
$
0.1
$
$
0.64
0.51
0.0
8.7
6.9
$
$
0.30
0.41
0.0
4.5
$
$
0.08
0.27
Oxide
759.12
5.90
Basket $
Basket Price (TREO)
$
30.66
$
30.01
$
23.61
Basket Price (NdPrDyTb)
$
27.59
$
27.76
$
22.12
MREO %
TREO %
37.9
100.0
38.9
100.0
90%
Magnet value in Basket
38%
MREO:TREO – leading composition for Ionic Clay
$30.66
Value of Basket – highest for Ionic clay
31.6
100.0
1 Viridis Mining and Minerals (ASX:VMM) ASX Announcement “Colossus Maiden Mixed Rare Earth Carbonate (MREC) Product 24.09.24
Leach Recoveries to Date
REE Mining
Impurity Removal
REE Leaching
REE Precipitation
MREC Production
Test
Reagent
Target
pH
Temp
°C
Leach
Duration
MREE
(%)
Leaching Type
1
0.5 (NH4)2SO4
4.5
ambient
2 hrs
68
VAT (tank) leaching
2
0.5M MgSO4
4.5
ambient
18 days
63
Heap Leaching
3
MgSO4
Field pumping trials to commence in Q4 2024
In-Situ Leaching
• In-situ leaching trials to commence in the coming months
• Leaching with Magnesium Sulfate is the most environmentally friendly reagent as it contains no nitrogen
1. (ASX:BCM) World Leading Recoveries Confirmed at Ema Project 07.05.24
2. (ASX: BCM) Excellent Heap Leach Recoveries Ema Project 06.08.24
Very Low Impurities in
Final Product (MREC)
REE Mining
% in
MREC
REE Leaching
Impurity Removal
REE Precipitation
MREC Production
Uranium
(U)
Thorium
(Th)
Aluminium
(Al)
Iron
(Fe)
Calcium
(Ca)
Silica
(Si)
0.01
<0.001
0.52
<0.06
0.05
<0.2
• ~2.0% Impurities in final MREC
• 98% purity of MREC
• Residence time of only 30 minutes once desired pH was achieved
• Results achieved using Magnesium Sulfate – no harmful ammonia required
1. (ASX: BCM) Ema Project Achieves Low Impurities 02.08.24
REE Precipitatoin
REE Mining
1MREC
REE Leaching
Impurity Removal
REE Precipitation
MREC Production
MREO:TREO
TREO in MREC
Precipitation
Recoveries
Basket
Value
La & Ce
content
DyTb
38%
55.3%
99%
US$30.66/kg
43.6
1.7%
• High content, 38%, of magnet elements (MREO) in MREC
• High content, 55.3%, of total rare earth oxides (TREO) in final MREC
• Extremely high recoveries of >99% through precipitation phase
• Class leading basket prices, $30.66, for a fully ionic clay deposit relative to peers
• Lower quantities, 43.6%, of less desirable elements Lanthinime (La) and Cerium (Ce) in MREC
• Mine to MREC utilising green magnesium based reagents
1. (ASX: BCM) 11.11.24 High-Value Mixed rare Earth Carbonate Produced for Ema
Capex - Hard Rock vs Soft
Rock
2000
Hard Rock
1.6B
Ionic Clay (VAT leach)
1500
1000
Clay (heap leach)
948M
822M
600M
500
173M
0
See Appendix 2. for full capital allocation listing details
USD : AUD 0.7
BCM goal
(ISR 10-15% of
conventional
mines1)
1. United States Nuclear Regulatory Commisions www.nrc.gov
TradeTech – the nuclear review (October 2016)
Opex – ISR Target Production
Low cost structure will underpin strong cashflow, and weather the storm of depressed rare earth prices
ISR Rare Earths
targeting lower end of cash cost curve.
currently produces ~20-30% of world supply
ISR in Uranium
dominates lowest cost production
producing >55%1 of world supply
$80
40000
~20-30% of world supply
Lowest cost production method
$60
30000
$40
US$/tREO Equiv.
US$/pound Uranium
>55%1 of world supply.
Lowest cost production method
ISR in Kazakhstan and Uzbekistan
$20
20000
ISR
World Supply
10000
$0
0
1
50
100
150
(m) Pound Uranium
1 https://world-nuclear.org/information-library/nuclear-fuel-cycle/mining-of-uranium/insitu-leach-mining-of-uranium
191
92,750
165,500
248,250
331,000
(t) REO
U.S. geological Survey, Mineral Commodity Summaries, January 2024
China’s Ministry of Industry and Information TechnologyProject
Logistics Route
Amazonas
Chibato Port
Brazil
Autazes
∙
trucking 130kms from Ema project
to Prainha
∙
600t barges make regular return
trips along the river Aripuana and
Madeira from Prainha to the Port of
Chibatão
∙
770kms to Chibatão, one of the
largest floating ports in Latin
America
∙
Port docks Panama sized vessels
∙
Easy connections to US, Europe or
Asia
Amazonas
Novo Aripuanã
Manicoré
Para
Prainha Port
EMA Project
operating costs
Minimal noise,
dust, greenhouse
gas impact
Cost
efficiency
Responsible
mining
Lower capital and
The most
environmentally
friendly way to
mine
Safer for mine
workers and
surrounding
communities
Green
mining
Enhanced
protection
Minimal visual
disturbance
Minimal
disruption
No creation of
open holes, waste
dumps, leach
pads or tailings
Waste-free
operations
The Value of InSitu Recovery
• Ionic REE are highly leachable
• Rapid leaching kinetics enhance the viability of
lower cost ISR mining
Work fronts
Rare Earths
Rare Earths
● Large auger drilling program
●
● Increase MRE from Inferred to
●
underway – mostly complete
Indicated – estimate commenced
● Looking for 20 yr minelife as a
●
● MRE update – on track
●
minimum for scoping study
Environmental baseline study
– ground work started
ANSTO test work on impurity
removal and final product
precipitation - complete
Scoping Study to define
economics – Q4 completion
In-Situ leach lab and field
trials testwork – Stage 1
complete
Tax Incentive - Sudam
−A hub for industrial activity in Brazil. Established in 1967
Incentive
Investments in Amazon Development
Superintendence (SUDAM)
Description
Reduces corporate income tax by 55% for
a 10 year period
Requirements
Approval by SUDAM (responsible
regulatory agency)
“Corporate Income tax reduction
from 34% to 15.25%.”
“www.taxand.com”
Corporate
Overview
Shares on Issue
1.1C
Share Price (28/11/2024)
229M
Options on issue
Performance Rights
10.7M
Market Cap
Board of Directors
889M 8M
Jeremy Robinson
Non-Executive Chairman
Andrew Reid
Managing Director
Ben Donovan
Non-Executive Director
Brazil
Av. Jornalista Ricardo Marinho
360 Ed. Cosmopolitan Sala 113
CEP: 22631-350 Barra da Tijuca
– Rio de Janeiro – RJ – Brasil
Australia
Level 28, 140 St Georges Terrace,
Perth WA 6000
Thank You.
Date retrieved 16 August 2024
Appendix 1 – Mineral Resources
Tonnes (Mt)
Grade
(ppm)
Measured:
Indicated: Inferred
ratio (Mt)
BCM
1017
793
0 : 0 : 1017
Aclara
258
1,452
0 : 0 : 258
Australian Rare Earths
186
712
0 : 0 : 186
Brazilian Rare Earths
485
1071
0 : 0 : 485
Brazilian Rare Earths (ASX:BRE) Prospectus - Part 1 19.12.23
Ionic Rare Earths
617
630
0 : 517 : 99
Ionic Rare Earths (ASX:IXR) Major Increase to Globally Significant Rare Earth Resource
23.06.20
Longnan
48
1,000
0 : 0 : 48
Research Reports
Meteoric
740
2,572
11 : 297 : 431
Meteoric Resources (ASX:MEI) Updated Figueira Mineral Resource Estimate 05.08.24
OD6 Metals
628
1,338
0 : 0 : 628
OD6 (ASX:OD6) Mineral Resource Estimate Upgrade Investor Presentation 29.05.24
Serra Verde
911
1,200
n/a
Harena Resources
628
895
0 : 0 : 628
https://harenaresources.com.au/ampasindava-rare-earths-project/
VMM
201
2,590
0 : 62 : 139
Viridis Mining and Minerals (ASX:VMM) Globally Significant Colossus Rare Earth Ionic
Adsorption Clay Project Maiden Mineral Resource Estimate 04.06.20
West Cobar Metals
83
1,117
0 : 39 : 151
West Cobar Metals (ASX:WC1) Salazar Clay - REE Resource Quadruples 09.08.23
Xinfeng
162
900
n/a
Research Reports
Xunwu
710
1,100
n/a
Research Reports
Company
Reference
Brazilian Critical Minerals (ASX:BCM) Massive Maiden Mineral Resource for Ema
Project 22.04.24
Aclara (TSX:ARA) Aclara announces 77% increase in inferred mineral resources at
Carina Module In Goias, Brazil 09.08.24
Australian Rare EARTHS (ASX:AR3) 84% Increase in Resource for Koppamurra REE
Project 19.03.24
Research Reports
Share your feedback
Discover