QUARTERLY ACTIVITIES REPORT
For the period ending 30 t h September 2024
Highlights
•
BCM commences Ema project development program on multiple work fronts
•
Infill drilling program to increase Mineral Resource confidence from Inferred to Indicated JORC
category well advanced
•
Scoping Study utilising Ausenco and WSP initiated
•
Metallurgical test work with ANSTO continued through final stages of process flow sheet design steps
•
Environmental baseline assessment commences with Brazilian specialist company CERN
•
63% recovery from column tests (heap leaching) of MREO (Nd/Pr/Dy/Tb) after only 18 days of leaching
•
MoU signed with Brazilian Permanent Magnet Producer
•
Initial results from the Ema infill drilling confirm the Mineral Resource estimate
Significant results1:
o 9.3m@1,347ppm TREO from 4m (EMA-TR-196), including 5m@1,570ppm TREO ending in
891ppm TREO
•
o
6m@1,103ppm TREO from 8m (EMA-TR-182), including 3m@1,531ppm TREO ending in
1,767ppm TREO
o
8m@1,026ppm TREO from 2m (EMA-TR-192), including 3m@1,452ppm TREO ending in
1,418ppm TREO
o
9m@931ppm TREO from 1m (EMA-TR-172), including 5m@1,181ppm TREO ending in
1,193ppm TREO
Cash position of $1.09m as of September 30th 2024.
Brazilian Critical Minerals Limited (ASX: BCM) (“BCM” or the “Company”) is pleased to provide details of its
activities during the quarter ended 30 September 2024 in the Apuí region of Brazil (Figure 1).
Safety
There was 1 lost time accident recorded during the quarter when a contractor as part of the drilling team at
the Ema project sustained a small cut to his knee which required medical attention offsite.
1|P a g e
ASX Announcement
Released 30th October
Figure 1 - BCM project’s location in the Apui region of Brazil.
BCM is progressing with an aggressive multi-pronged approach to the Ema project development over the
remaining portion of 2024.
The EMA ionic REE project is unique amongst Brazilian REE projects in that it shares almost identical
characteristics with the ionic REE deposits developed over felsic volcanic rocks in southwest China, the world’s
largest known ionic clay region, where a substantial portion of the world’s Total Rare Earth Oxides (TREO) raw
material production is currently being mined.
Infill Resource Drilling
Exploration drilling is conducted with hand-held auger drills, which offer the advantage of low-cost, rapid
deployment and mobility. One key constraint of auger drilling is the depth limitation, with the deepest holes,
generally containing the highest-grade results, drilled to no more than 20m depth. Most of the exploration to
date has been conducted on widely spaced (800m) drill centres, with infill drilling to 400m centres in the
central resource area which is the current drilling focus.
BCM embarked on a 270-hole auger drilling program which will be completed during Q4 2024. The primary
aim of the drilling is to convert sufficient tonnage of material from the JORC Inferred category to Indicated
which will support the initial mining/treatment operations currently being considered and an updated Mineral
Resource Estimate (MRE) which will form the foundation of the Scoping Study.
First assays from 45 holes received from the Mineral Resource infill drilling program show grades and
thicknesses that are consistent with earlier drilling programs, validating the reliability of the resource model.
Persistent high NdPr grades were observed in the lower horizon (10-20m below surface), indicating a robust
2|P a g e
ASX Announcement
Released 30th October
zone of mineralisation that could enhance the project's economic viability. Several exceptional high-grade
intercepts were identified, warranting further investigation to define priority zones for In Situ Recovery (ISR)
extraction methods. These high-grade zones have the potential to significantly impact resource extraction
strategies. 70% of the drilling program is now completed, with completion by end of November.
The high priority area, red dashed line area (Figure 2) comprises approximately 24% of the previously drilled
MRE area. Drilling commenced on the western portion of this area (Figures 2 and 3) with initial assays received
for 45 holes on the western margin of the infill-drilled area (Figure 3).
Assays returned over 500 ppm TREO across multiple holes, generally over widths of 5-10 meters, confirming
the consistency of mineralisation across broad areas. Results indicate a strong increase in grade towards the
base of the weathering profile, with notable concentrations of magnet rare earth oxides (MREO’s) located
deeper within the profile.
Several holes encountered water at the bottom of holes, preventing the obtaining of samples through the highgrade zone.
Figure 2 - Ema REE project – Mineral Resource covering 82 km2 with auger holes on 800m spacing and infill
auger holes on 400m centres over 20 sq km.
3|P a g e
ASX Announcement
Released 30th October
Figure 3 - Location map of the auger infill holes with assay results received to date.
Figure 4 - Cross section from EMA-172 to 192
Despite the variability in collar elevations of the drilled holes, the typical enrichment of Neodymium (Nd) and
Praseodymium (Pr) is consistently encountered at a similar depth within the lower saprolite zone, located just
above the fresh rock. The enriched zone generally measures around 10 meters in thickness indicating a
continuous mineralised horizon. This widespread occurrence strongly suggests the presence of continuous
high-grade zones across the project area.
4|P a g e
ASX Announcement
Released 30th October
The TREO grade exhibits a marked increase with depth, ranging from approximately 500ppm near the top of
the enriched zone to values reaching up to 1,880ppm at greater depths. Importantly, the proportion of
valuable heavy rare earth elements (HREEs) increases to over 31% at the end of the holes, highlighting the
economic potential of the lower saprolite zones.
Holes EMA-TR-182, 192 and 196 (Figure 5) are examples of the lower enrichment zone with the presence of
high NdPr grades at the base of drilling in the lowest weathering zone. It is anticipated that this enrichment
will be present in all holes in which the low weathering horizon is intersected.
Figure 5 - Drill-hole profiles showing typical enrichment zone with high NdPr grades close to the fresh rock
interface.
Scoping Study
In April 2024 the Company announced a large Mineral Resource Estimate2 and subsequently very high rates of
economic recovery3, with the Board approving a formal Scoping Study on the technical and economic
development of the Ema project which will examine the potential for a standalone low capital
treatment/development pathway for the project.
The company has now engaged several specialist companies to commence activities with respect to the Ema
rare earth scoping study. The team members all have extensive experience in rare earths. The study will cover
project aspects including heritage, environmental, metallurgy, mining engineering, geology and hydrogeology.
The scoping study will assess potential in-situ leach processing of the Ema project. It is estimated that the bulk
of the hydrology-related data gathering will be concluded by year’s end.
•
•
•
Ausenco: to provide engineering services for high-level scoping engineering outputs;
WSP: to demonstrate the suitability of ISR and to gather hydraulic data (aquifer properties,
pumping/injection rates to assess ISR feasibility and to provide information for the development
of a numerical groundwater model based on field trials).
GE21: to complete an updated mineral resource estimate based on JORC 2012 Code standards;
5|P a g e
ASX Announcement
Released 30th October
•
and
CERN: to conduct baseline environmental assessment with a view to preparation of
Environmental Studies report for submission of a preliminary license application.
The final scoping report is due for delivery to the Company around mid-December, with announcement of
results in Q1 2025.
ANSTO Metallurgical Test Work
Work being undertaken by ANSTO over the last several months has resulted in very high recoveries of NdPr4.
IMPURITY LEVELS
Impurities affect REE recovery and precipitation efficiencies and are a vital component of the process to
understand. Control of the most troublesome impurities (Al, Fe, Th, U) depends on their concentration and
the degree of purity required in the MREC.
ANSTO reported the final slurry leach test results which confirm very low concentrations of deleterious or
impurity elements for the Ema material.
Table 1. Impurity values following optimised testing and leaching of Ema master composite sample.
mg/l
Uranium
Thorium
Aluminium
Iron
Calcium
Silica
0.2
0.02
73
<1
11
6
Figure 6. Key steps in the process flow sheet for ionic clay MREC production. REE Leaching section highlighted
represents stage of processing where results from Table 1. above were sourced.
The Company is now confident that these low uranium and thorium values can be removed through simple
pH adjustment during the next stage of impurity removal leading to a final MREC product that meets European,
North American and Asian offtake partners for specification testing to advance discussions regarding
commercial offtake.
HEAP LEACH TEST WORK SUMMARY
ANSTO investigated a heap leaching option through column testing (Table 2 and Figure 7). Two 50mm
diameter columns were operated with a bed height of 1.14m, with the following specifications to test two
reagents:
Table 2. Column testing setup specifications
Bed Height
0.3M Ammonium Sulfate
0.5M Magnesium Sulfate
1.14 m
1.14 m
6|P a g e
ASX Announcement
Released 30th October
Column Diameter
50 mm
50 mm
Ore mass
2,970 g
2,970 g
Reagent
(NH4)2SO4
MgSO4
Concentration
0.3 M
0.5 M
pH
4.5
4.5
Binding Addition
300 g/t
300 g/t
Irrigation Rate
5 L/m2/hr
5 L/m2/hr
This heap leach test work is a key part of the Company’s ongoing strategy to grow and progress the Ema Inferred
Mineral Resource towards development, which currently sits at 1.02Bt @ 793ppm2. The final calculated leach
liquor and residue recovery of 63% was materially in line with previously announced slurry recovery results2.
Column leach liquor results using magnesium sulfate returned recovery values*:
•
Time Period
Nd (%)
Pr (%)
Dy (%)
Tb (%)
4 days
42
41
30
34
6 days
52
51
36
41
11 days
57
55
40
45
*Calculated based on head assay and leach liquor analysis
Final recovery based on head assay and residue analysis after 18 days of leaching
followed by washing recorded;
Combined Recovery
63%
MREO (Nd/Pr/Dy/Tb)
•
The ore agglomerated readily in the test liquor (no additional acid was required) and the
agglomerated ore remained competent in the column test
•
Permeability of the column bed was good, with minimal bed slump of 1% calculated
•
Test conditions involved REE desorption utilising 0.5 M magnesium sulfate (MgSO4) or 0.3 M
ammonium sulfate (NH4)2SO4, ambient temperature at pH of 4.5
Acid consumption was calculated to be < 1 kg/t
•
These results have given the Company confidence that there is an increased likelihood that in-situ leaching of
the rare earths is now possible. This is largely feasible due to the mineralogy of the Ema mineralisation which is
almost 50% quartz and hence this sandy clay material allows for good percolation and fluid flow at rates which
could be economic.
Agglomeration of clay ores does not produce typical agglomerates, rather it is required to wet the ore and
bind the fines together. A small amount of binding solution was added followed by the test lixiviant solution
7|P a g e
ASX Announcement
Released 30th October
(at pH 4.5) to a target moisture content of ~23 wt% (Figure 7).
The two column tests were run in transparent PVC columns of 1.2 m x 50 mm (ID). A bed height of just over 1
m was obtained by loading agglomerated ore (~3 kg dry) into the column and curing for 24 hours. Both columns
were run concurrently and were operated at room temperature.
The lixiviant solution was fed to the top of the column by peristaltic pump, with an initial target irrigation rate
of ~5 L/h/m2.
Irrigation was stopped on day 18 and draining commenced, this was followed by 2 days of washing using tap
water.
Figure 7 - Column setup and agglomeration of ore at the ANSTO facility in Sydney.
Field permeability and lab testing for In-situ Leaching
A series of preliminary controlled field experiments (slug tests) performed by the BCM team was completed
on 10 dry drill holes (Figure 8). These tests estimate the hydraulic properties of aquifers, in which the water
level in a controlled open dry drill hole is caused to rise suddenly and the subsequent water-level response
(change from static) is measured through time at regular intervals.
8|P a g e
ASX Announcement
Released 30th October
Figure 8. Location map of the 10 drill holes which were tested for permeability.
The slug tests were designed as a rising-head test, in which a measured volume of 50l of water was placed into
10 holes, instantaneously raising the water level in the well by a known amount.
The goal of a slug test is to estimate the hydraulic properties of an aquifer system such as hydraulic
conductivity.
Percolation data shows that the majority of the water inserted into each hole was lost or permeated into the
surrounding walls within the first 60 minutes (Figure 9). The second phase is the stable percolation stage,
where the water adsorption nears completion, and the percolation rate gradually decreases.
9|P a g e
ASX Announcement
Released 30th October
Figure 9. Hydraulic conductivity results from drill holes (TR174 & TR183). Tests show a rapid fall in water level
over the first 60 minutes post the water insertion. Data from the 10 holes is collated in table 3.
Percolation rates varied from 0.98m/hr to 2.34m/hr and show that there is a high degree of permeability within
the clay horizons containing the rare earths. Field pumping trials are scheduled to commence during Q4 2024.
The percolation characteristics of clay minerals are influenced by multiple factors, including ore composition,
pore structure, permeability, and the properties of the leaching solution.
Time (mins)
0
30
60
90
120
150
180
210
Static Water
level (m)
Percolation
m/hr
Hole Depth (m)
TR
158
4.42
9.00
9.52
9.82
9.94
9.98
TR
168
7.35
10.94
12.13
12.46
12.58
12.70
TR
168A
5.95
6.58
7.90
8.18
8.35
8.39
TR
164
5.40
8.55
8.77
8.80
8.86
TR
165
5.82
10.63
11.32
11.64
11.78
11.88
11.97
TR
177
9.92
9.95
TR
170
0.70
4.84
5.06
5.20
5.26
TR
181
0.35
5.40
5.82
5.98
6.09
6.12
TR
174
2.09
7.63
7.90
7.95
TR
183
3.00
7.43
7.96
8.22
8.36
8.46
8.57
8.60
9.98
12.70
dry
8.86
12.30
9.95
dry
dry
7.95
8.60
2.22
2.14
0.98
1.73
2.05
n/a
2.28
2.31
2.34
2.24
12.00
19.80
8.39
12.00
15.00 13.00 5.26
6.50
12.00
19.80
Table 3. Hydraulic conductivity results from the 10 dry drill holes tested. Tests show a rapid fall in water
level (in metres) over the first 60 mins post the water insertion.
10 | P a g e
ASX Announcement
Released 30th October
Lab Diffusion Testing
Agitated elution tests allow rapid access of reagent to the mineral surface and thus rapid desorption of the
eluted species, however, in an in-situ scenario this access is limited by solution flow through discrete channels
in the ore bed and diffusion through interstitial spaces.
While macroscopic solution flow in in-situ operations can be modelled with hydrological models based on field
observations, the local transport reaction kinetics of the elution process needs to be tested separately.
A series of diffusion tests were conducted in a stagnant bed leach apparatus developed by Petersen [1] as
shown in Figure 10. A bed of 100 g of clay mineralisation was carefully moulded into the bottom of a beaker
to a height of about 10 mm, and 200 mL of lixiviant (0.5 M and 0.1 M MgSO4) was very carefully poured on top
of the bed so to not stir up solids. The solution was gently agitated with an overhead stirrer. Liquid samples
(3–5 mL) were taken every day for 30 days. The samples were analyzed by ICP- MS.
Figure 10. Stagnant bed diffusion test developed by Petersen.
Figure 11. Overall cumulative recoveries from diffusion testing utilizing magnesium sulfate at 0.5 M and
0.1M concentrations over 30 days.
11 | P a g e
ASX Announcement
Released 30th October
The results of the stagnant bed diffusion test are shown in Figure 12. All of the magnet rare earth elements
leached in significant quantities; (Nd, Pr, Dy, Tb) are shown. The curves show the characteristic profiles for a
diffusion-governed process, reaching equilibrium extraction (that is the extraction to be expected if solid and
liquid were perfectly mixed) over 30 days.
ISR is a proven cost effective and environmentally acceptable extraction process, which accounts for
approximately 57% of world uranium mined, and is used in Australia, USA, Kazakhstan, and Uzbekistan.
Mou Signed With Brazilian Permanent Magnet Producer
The Company signed a five year non-binding Memorandum of Understanding (MoU) with SENAI Regional
Department of Minas Gerais, owner of the permanent magnet facility unit Lab Fab (CIT SENAI ITR) (Lab Fab)
Lab Fab is developing the first permanent magnet manufacturing facility in Latin America and the two parties
will cooperate in the technological development of rare earth magnet manufacturing processes.
Lab Fab is a permanent magnet technology developer, aiming to advance the rare earths industrial chain in
Brazil and produce a range of high-end technology products suited for a range of electric motor industries
requiring rare earth magnets.
The facility plans to commence operation later this year and the Federation of Industries of Minas Gerais plans
to grow production to 200 tonnes of magnets annually.
The non-binding MoU will establish the bases for cooperation between BCM and SENAI Regional Department
moving forward, with a view to jointly develop research, development and innovation for the demonstrative
production of rare earth magnets at Lab Fab, in Lagoa Santa, Minas Gerais, by identifying activities of mutual
interest, namely:
1. Supply of Raw Materials: Arrangement for the supply of raw materials from BCM, for conducting
pilot production of rare earth magnets.
2. Strengthening Partnerships: Actions aimed at reinforcing the relationships between participants and
industries that are interested in rare earth magnet technologies.
3. Joint Research Projects: Development of collaborative projects that focus on applied research,
evaluation activities, experiments, training, consultancy, and specialized technological services.
4. Implementation of Joint Activities: Initiating various other collaborative activities and programs,
including pilot and experimental initiatives in areas of mutual interest, as agreed upon by the
involved parties.
Corporate
Rare Earth price fundamentals strengthened during the quarter with prices for NdPr up 20%. Supply and
demand fundamentals are strengthening, which should be reflected in upward pressure on pricing in the
coming months. This could be aided by the ongoing fighting in Myanmar close to the clay rare earth mining
hubs disrupting supply.
The Company is fielding a number of enquiries and leads with respect to offtake agreements. The Company is
focused on delivering a scoping study which can then be used as the basis for binding offtake discussions.
12 | P a g e
ASX Announcement
Released 30th October
For the purpose of Section 6 of the Appendix 5B, all payments made to related parties have been paid in
relation to director fees.
References
1
Brazilian Critical Minerals (ASX:BCM) ASX Announcement “Infill Drilling Confirms Ema Resources” 08.10.24
2
Brazilian Critical Minerals (ASX:BCM) ASX Announcement “Massive Maiden Mineral Resource Estimate for
Ema Project” 22.04.24
3
Brazilian Critical Minerals (ASX:BCM) ASX Announcement “ World Leading Recoveries Confirmed at
Ema Project” 07.05.24
4
Brazilian Critical Minerals (ASX:BCM) ASX Announcement “Excellent Heap Leach Recoveries Ema Project”
06.08.24
Additional Information required under Listing Rule 5.3.3
Tenements held at the end of the quarter
Area (Ha)
Percentage ownership
ANM Permit Number 880.107/08
Location Brazil (Ema)
9,839.91
100%
Exploration Licence
ANM Permit 880.184/16
Location Brazil (Ema East)
9,034.00
100%
Exploration Licence
ANM Permit Number 880.090.08
Location Brazil (Três Estados)
8,172.25
100%
Exploration Licence
ANM Permit Number 880.025/2023
Location Brazil (Apuí iREE)
2,417.00
100%
Exploration Licence
ANM Permit Number 880.026/2023
Location Brazil (Apuí iREE)
6,591.90
100%
Exploration Licence
ANM Permit Number 880.027/2023
Location Brazil (Apuí iREE)
5,856.00
100%
Exploration Licence
ANM Permit Number 880.259/2020
Location Brazil (Apuí iREE)
9,092.01
100%
Exploration Licence
ANM Permit Number 880.149/2017
Location Brazil (Apuí iREE)
9,815.15
100%
Exploration License
ANM Permit Number 880.076/2023
Location Brazil (Apuí ENE iREE)
8,475.30
100%
Exploration application
13 | P a g e
ASX Announcement
Released 30th October
8,856.84
ANM Permit Number 880.077/2023
Location Brazil (Apuí ENE iREE)
100%
Exploration application
The Activity Report for the September quarter 2024 has been authorised for release by the Board of Directors.
Appendix 3. Company data in relation to MREE recoveries and conditions for leaching
Code
Company
Project
Head
Grade
(ppm)
MREO:TREO
(%)
MREE
recovery
(%)
NdPr
DyTb
Leaching
No. of
recovery recovery
pH Temperature
Agent
Samples
(%)
(%)
BCM.ASX
BCM
Ema
965
31
68
69
48
(NH4)2SO4 4.5
ambient
62
ANSTO
ARA.TSX
Aclara
Carina
1,510
23
46
43
48
(NH4)2SO4
3
ambient
1418
SGS
Aclara (TSX:ARA) Aclara announces discovery of
168Mt ionic clay mineral resource at its Carina
Module in Goias, Brazil 12.12.24
ALV.ASX
Alvo
Minerals
Blue Brush
1,014
24
50
58
42
(NH4)2SO4
4
ambient
13
SGS
Alvo (ASX:ALV) Metallurgical Tests Confirm Bluebush
as Ionic Adsorption Clay REE Project 02.11.23
VMM.ASX
Viridis
Colossus
4,665
31
60
62
57
(NH4)2SO4
4
ambient
91
SGS
Viridis (ASX:VMM) Colossus Acheives Highest
Overall Bulk Ionic Recoveries Globally 18.04.24
MEI.ASX
Meteoric
Caldeira
3,642
23
63
63
43
(NH4)2SO4
4
ambient
101
ANSTO
Lab
Reference
this announcement
Meteoric Resources (ASX:MEI) Metallurgical
Testwork Confirms Outstanding Ionic Clay
Recoveries for Caldeira REE Project 07.12.23
For more information contact:
Andrew Reid
Managing Director
Andrew.reid@braziliancriticalminerals.com
Competent Person Statement
The information in this report that relates to exploration and metallurgical results released by the Company
to the ASX on 13 March, 22 April, 7 May, 8 July, 2 August, 6 August, 21 August, and 8 October 2024 is based
on information compiled by Mr. Antonio de Castro, BSc (Hons), MAusIMM, CREA, who acts as BCM´s Senior
Consulting Geologist through the consultancy firm, ADC Geologia Ltda. Mr. de Castro has sufficient experience
which is relevant to the type of deposit under consideration and to the reporting of exploration results and
analytical and metallurgical test work to qualify as a competent person as defined in the 2012 Edition of the
Joint Ore Reserves Committee (JORC) “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr. Castro consents to the report being issued in the form and context in which
it appears.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the relevant market announcement and, in the case of mineral resource estimate, that
all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. Refer to ASX announcement dated 22 April
2024.
14 | P a g e
ASX Announcement
Released 30th October
About Brazilian Critical Minerals Ltd
Brazilian Critical Minerals Limited (BCM) is a mineral
exploration company listed on the Australian
Securities Exchange.
Its major exploration focus is Brazil, in the Apuí
region, where BCM has discovered a world class
Ionic Adsorbed Clay (IAC) Rare Earth Elements
deposit. The Ema IAC project is contained within the
781 km² of exploration tenements within the
Colider Group.
BCM has defined an inferred MRE of 1.02Bt of REE’s
with metallurgical recoveries averaging 68% MREO.
The Company is currently converting a portion of
this MRE from Inferred into the Indicated category
with an extensive drill program which will inform
the scoping study and economic analysis due for
completion in late 2024.
Ema REE Project 2024 Mineral Resource Estimate – by cut-off grade
JORC
cut-off
Tonnes
TREO
NdPr
DyTb
MREO
MREO:TREO
Category
ppm TREO
Mt
ppm
ppm
ppm
ppm
%
Inferred
0
1,340
694
163
15
178
26
Inferred
500
1,017
793
199
17
216
27
Inferred
600
863
836
218
18
236
28
Inferred
700
685
885
237
20
257
29
Inferred
800
494
936
259
21
280
30
Inferred
900
331
977
278
22
300
31
15 | P a g e