INCRA AMAZONAS ISSUES LAND ACCESS
AGREEMENT
EMA PROJECT ADVANCES TO LAST STAGE OF APPROVALS
Highlights
• Brazil’s National Institute for Colonization and Agrarian Reform (INCRA) Amazonas office has
granted formal approval of the land access agreement covering mining activities on INCRA
controlled land
• The approval document, which still requires final ratification from INCRA in Brasília, relates to a
portion of the Ema tenements still controlled by INCRA, awaiting final transfer of title to individual
landowners
• As final consent from INCRA Manaus is a condition imposed by the Amazonas Environmental
Protection Institute (IPAAM) for granting of the environmental licence, this sign-off opens the way
for final environmental approval
Brazilian Critical Minerals Limited (ASX: BCM) (“BCM” or the “Company”) is pleased to advise that INCRA Manaus
has formally approved the land-consent agreement for the Company’s Ema Rare Earth Project near Apuí,
Amazonas, Brazil.
The application concerns INCRA’s consent for the partial overlap of the Ema Project with the Juma settlement in
the municipality of Apuí, relating to the land title formalisation process previously announced (ASX: BCM 16 Sep
2026) with regards to local landholders and farmers.
To view the video of MD, Andrew Reid, discussing this announcement, click on the link below
https://braziliancriticalminerals.com/link/eYOAGP
Andrew Reid, Managing Director of BCM, commented:
“INCRA’s consent is a very encouraging step for Ema. We are particularly pleased to receive formal confirmation
of INCRA’s consent, including a separate certificate stating that INCRA raises no impediment to environmental
licensing continuing. Our focus remains on securing all the approvals required to advance Ema towards
development.”
ASX Announcement
Released 15th
October 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Ema Project approvals and development status:
The table below outlines the approvals received, regulatory clearances and remaining approvals outstanding.
Approval or milestone Authority Status Scope / latest position
Exploration licences for Ema
and Ema East
ANM Granted
Tenements 880.107/2008 and 880.184/2016,
approximately 189 km².
ISR field-trial water-use
permit
IPAAM
Granted
Mar 2025
Two-year permit for pilot water pumping and hydraulic
testing.
ISR field-trial magnesium
sulphate use
IPAAM
Approved
Apr 2025
Permission to inject MgSO₄ for pilot permeability and
leach testing.
Final Exploration Reports for
both tenements
ANM
Approved
Jun 2026
Exploration-stage sign-off supports progression to mining
applications.
Mines Department
approved ISR
ANM Accepted
BCM reports ANM acceptance and authorisation for GU
applications to progress.
INCRA public informative
hearing
INCRA
process
Completed
Sep 2026
Completed procedural step for federal settlement land
access.
No-impediment certificate INCRA
Received
Oct 2026
No objection to environmental licensing progressing.
Final consent remains pending.
Development
environmental licensing
IPAAM Pending Assessment progressing.
Rare Earth GU trial mining
licences
ANM Pending Applications progressing.
ANM: Agência Nacional de Mineração or National Mining Agency
INCRA: Instituto Nacional de Colonização e Reforma Agrária or Federal Government authority for public administration
IPAAM: Instituto de Proteção Ambiental do Amazonas or Amazonas Environmental Protection Institute
Next steps
BCM will continue working with INCRA in Brasília to progress final ratification of the agreement. In parallel, the
Company will continue progressing the Ema Project’s environmental licensing process with the relevant
authorities.
This announcement has been authorised for release by the Board of Brazilian Critical Minerals Limited.
For more information:
Andrew Reid
Managing Director
Brazilian Critical Minerals Ltd
E: andrew.reid@braziliancriticalminerals.com
ASX Announcement
Released 15th
October 2026
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
About Brazilian Critical Minerals Ltd
The Ema Rare Earth Project is an ionic
adsorption clay rare earth project located near
Apuí in Amazonas State, Brazil.
The Project is being developed using In-Situ
Recovery (“ISR”), with magnesium sulphate
solution used to recover rare earth elements
from the mineralised clay profile. The recovered
rare earths are subsequently processed to
produce a Mixed Rare Earth Carbonate suitable
for export and downstream refining.
The FEED stage represents the next engineering
step in BCM’s strategy to progressively de-risk
the Ema Project and advance it towards
development.