Highlights
• Two trial mining licence applications and final exploration reports are currently under
evaluation by ANM task forces
• Invitation received from ANM to present the exploration report to facilitate and
expedite approval processes
• A full mining licence application (PAE) will integrate the revised Mineral Resource
Estimate (MRE) and Bankable Feasibility Study (BFS), both scheduled for completion in
Q1 2026
• Strong municipal and state-level support demonstrated through recent community and
government events
• The Mayor of Apui has committed to upgrading the access road to the project site,
effectively reducing future infrastructure CAPEX on the road to zero
Brazilian Critical Minerals Limited (ASX: BCM) (“BCM” or the “Company”) is pleased to provide an
update on permitting engagement at its Ema rare earths project, Apui, Amazonas, Brazil.
As advised in the ASX release (ASX: 28 Jul 25) the Company is progressing a 2-fold permitting strategy
involving applications for both trial mining and full-scale operating licences. BCM has submitted two trial
mining licence applications to the Mines Department (ANM) covering both exploration licenses together
with final exploration reports. These are now under review by two dedicated task forces.
BCM has been invited to present its final exploration report for the Ema project to one of the taskforces
in the coming weeks to facilitate and expedite the approval process.
The full mining application to ANM requires submission of a mine plan and economic study, termed a
PAE. The PAE will incorporate a revised Mineral Resource Estimate (MRE), and results of the Bankable
Feasibility Study (BFS), targeted for completion Q1 2026.
The Company recently completed another round of regulatory engagements and continues to receive
strong support from both the local community and the authorities at the municipal and state level.
This support was evident at the annual Apui agricultural show and at the launch of a campaign to register
land titles of all rural landowners in Apui. The campaign, a joint initiative of IPAAM and the federal
government land resettlement agency INCRA, will assist BCM’s efforts to finalise landowner agreements
(<10) with farmers within the Ema project locality boundary.
Both events were attended by senior authorities from the state capital Manaus, including state members
of parliament and federal senators. The importance of BCM’s activities to the municipality and the state
were frequently highlighted in addresses given by the various authorities (see figures 2 & 3). In
particular, state MP Ednailson Rozenha has actively supported the project, attended a recent meeting
between BCM representatives and the president of IPAAM to discuss the Ema project.
ASX Announcement
Released 07 October 2025
https://braziliancriticalminerals.com/
Investor Hub: signup here
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Immediately preceding the agricultural show five prominent local personalities were awarded honorary
citizenship of Apui, including BCM’s Apui project manager, Aldemir Moreira (figure 1).
Additionally, Apui Mayor, Marquinho offered, for the town council to upgrade the public road from Apui
to the Ema project area before the wet season in November, with BCM contributing only diesel. This
arrangement reduces future infrastructure capex on the access road to zero.
Figure 1. Ema project manager, Aldemir Moreira, receiving honorary citizenship of Apui
Andrew Reid, Managing Director, commented:
Having Aldemir receive such a symbolic local honour recognizes that the township people hold him in
high esteem through his integration to the community and contribution to the region in a positive way.
Aldemir has significantly raised the Ema project profile, giving greater visibility to the community and
contributing to increased media coverage resulting in not only the local government by also state
government representatives, MP’s and other dignitaries now recognising the potential significance of
the Ema project.
The Company continues to engage thoughtfully with all parties to establish transparency of data
assessment through the permitting process.”
ASX Announcement
Released 07 October 2025
https://braziliancriticalminerals.com/
Investor Hub: signup here
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Figure 2. Officials addressing the land
regularisation launch, Apui, left to right, Gustavo
Picanço (President, IPAAM), Ednailson Rozenha
(Amazonas State MP), Antônio Marcos Fernandes
(Mayor, Apui), Dilma Botton (Deputy Mayor,
Apui), Djalmary Souza (Head of Land
Administration, INCRA)
Figure 3. Antonio de Castro (BCM Exploration
Manager, green shirt) and Mike Schmulian (Brazil
Country Manager, blue shirt) with MP Rozenha
and Mayor Fernandes
This announcement has been authorised for release by the Board of Directors.
The information in this announcement relates to previously reported exploration results and mineral
resource estimates for the Ema Project released by the Company to ASX on 22 May 2023, 17 July 2023,
19 July 2023, 31 July 2023, 13 Sep 2023, 19 Oct 2023, 06 Dec 2023, 06 Feb 2024, 22 Feb 2024, 13 Mar
2024, 02 Apr 2024, 08 Oct 2024 19 Nov 2024, 21 Jan 2025, 17th
Feb 2025, 26th
Feb 2025, 10th
March
2025, 13th
March 2025, 28th
April 2025, 27th
May 2025, 28th
May, 13 June 2025, 01 July 2025, 18 August
2025 and 01 Sep 2025. The Company confirms that is not aware of any new information or data that
materially affects the information included in the above-mentioned releases and CONTINUES TO APPLY
and have not materially changed in accordance with listing Rule 5.23.2.
Enquiries
For more information please contact:
Andrew Reid
Managing Director
Brazilian Critical Minerals Limited
Andrew.reid@braziliancriticalminerals.com
ASX Announcement
Released 07 October 2025
https://braziliancriticalminerals.com/
Investor Hub: signup here
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Brazilian Critical Minerals Limited (BCM) is a mineral
exploration company listed on the Australian Securities
Exchange.
Its major exploration focus is Brazil, in the Apuí region,
where BCM has discovered a world class Ionic Adsorbed
Clay (IAC) Rare Earth Elements deposit. The Ema IAC
project is contained within the 781 km² of exploration
tenements within the Colider Group and adjacent
sediments.
BCM has defined an indicated and inferred MRE of 943Mt
of REE’s with metallurgical recoveries averaging 68%
MREO, representing some of the highest for these types of
deposits anywhere in the world.
The Company has commenced a bankable feasibility study
due for completion in Q1 2026, is engaging with regulators
regarding permitting approvals and has commenced a
resource extension drilling program which will inform the
BFS economic analysis.
Ema REE Global Mineral Resource Estimate @COG 500ppm TREO
JORC
Category
cut-off
ppm TREO
Tonnes
Mt
TREO
ppm
NdPr
ppm
DyTb
ppm
MREO
ppm
MREO: TREO
%
Indicated 500 248 759 176 16 192 25
Inferred 500 695 701 165 16 181 26
Total 500 943 716 168 16 184 26