Strong Infill Drilling Results Continue at Ema
Released
Released
Announcement PDF
ASX Announcement
Released 19th November 2024
EXCEPTIONAL GRADES FROM EMA
INFILL DRILLING
Highlights
•
82 new holes received from the 270-hole Mineral Resource infill drilling program
•
Results show excellent grades and thicknesses with strongly elevated NdPr grades directly above
the fresh bedrock contact supporting the proposed ISR (in-situ recovery) mining approach
•
The strong grades and continuity add to de-risking process of the project
•
Approximately 49% of all assays have now been returned with results to be included in an interim
updated Ema Mineral Resource Estimate (MRE) that underpins the scoping study
•
Drilling results received to date will now allow production and plant feed scheduling for the
scoping study
•
Results will enable the pre-planning and in-situ field trials required as part of a feasibility study
scheduled for 2025
•
~95% of the drilling program is now complete, with completion expected by end of November
•
Scoping study is progressing well with final report scheduled for release in Q1 2025
•
Environmental baseline assessment continues to progress on site
Some of the significant results (>500ppm TREO) include:
•
10m@1,103ppm TREO from 10m (EMA-TR-236), ending in 1,817ppm TREO
•
9.7m@1,081ppm TREO from 2m (EMA-TR-229), ending in 1,398ppm TREO
•
10m@1,086ppm TREO from 8m (EMA-TR-258), ending in 1,765ppm TREO
•
9.6m@1,149ppm TREO from 5m (EMA-TR-245), ending in 837ppm TREO
•
9.8m@1,107ppm TREO from 3m (EMA-TR-238), ending in 771ppm TREO
Brazilian Critical Minerals Limited (ASX: BCM) (“BCM” or the “Company”) is pleased to announce the assay
results for the second batch of 82 infill auger holes drilled for rare earth elements (REEs) at Ema in the Apuí
region of Brazil (Figure 1) aiming to increase the confidence level of the MRE over the central portion of
the Ema Mineral Resource limits.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 19th November 2024
Figure 1. Location of the Ema Project, Brazil.
The EMA ionic REE project is unique amongst Brazilian REE projects in that it shares almost identical
characteristics with the ionic REE deposits developed over felsic volcanic rocks in southwest China, the
world´s largest known ionic clay region, where a large proportion of the world’s production of rare earths
is mined and processed annually.
A total of 132 holes (49%) of the 270-hole drilling program have now returned assay results. Results
generally returned thick mineralised intercepts with the highest grades of NdPr being found directly above
the fresh rock interface.
Drilling was designed on a 400m x 400m grid spacing within the high priority (red dashed line area Figure
2) which comprises approximately 24% of the previously announced inferred 1.02Bt1 MRE area.
Results indicate a strong increase in magnetic rare earths (MREO’s) grade towards the base of the
weathering profile in the sap rock portion of the profile with intervals generally 5-10m thick considered
ideal for in-situ leaching purposes.
The significant increase in the proportion of valuable heavy rare earth elements (HREEs) to over 31% of
the MREO composition at the end of the holes underscores the economic potential of the lower saprolite
zone. This enhancement not only indicates a promising resource but also suggests that further exploration
in these areas could be highly beneficial towards developing a low cost in-situ leach operation.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 19th November 2024
Figure 2 - Ema REE project – Mineral Resource covering 82 km2 with auger holes on
800m spacing and infill auger holes on 400m centres over 20 sq km.
Figure 3 – Location map of the auger infill holes with assay results received to date with cross section A-B.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 19th November 2024
Figure 1 - Cross section A-B from EMA-216 to 234
Ema REE project
The EMA ionic REE project is unique amongst Brazilian REE projects in that it shares almost identical
characteristics with the ionic REE deposits developed over volcanic rocks in southwest China and Myanmar,
the world´s largest known ionic clay region, where approximately ~30% of the world’s rare earth
production have been mined and processed during 2024 alone.
Exploration drilling is conducted with hand-held auger drills, which offer the advantage of low-cost, rapid
deployment and mobility. One key constraint of auger drilling is the depth limitation, with the deepest
holes, generally containing the highest-grade results, drilled to ~20m. In addition, most of the exploration
to date has been conducted on widely spaced (800m) centres, with infill drilling to 400m centres in the
central resource area.
Infill drilling at 400-metre centres is enabling a more detailed assessment of the mineralisation which will
lead to an increase in the confidence level of the Mineral Resource Estimate. This transition to closer
spacing has led to the identification of some exceptional intercepts, suggesting the presence of high-grade
pods within the mineralized zones. These findings will be crucial for the next phase of exploration as the
team works to define these high-grade areas for potential in-situ recovery (ISR).
Despite the variability in collar elevations of the drilled holes, the typical enrichment of neodymium (Nd)
and praseodymium (Pr) is consistently encountered at a similar depth within the lower saprolite zone,
located just above the fresh rock. The enriched zone generally measures around 10 meters in thickness
indicating a continuous mineralised horizon. This widespread occurrence strongly suggests the presence
of continuous high-grade zones across the project area.
The Total Rare Earth Oxide (TREO) grade exhibits a marked increase with depth, ranging from
approximately 500 ppm near the top of the enriched zone to values reaching up to 1,880 ppm at greater
depths. Importantly, the proportion of valuable heavy rare earth elements (HREEs) increases to over 31%
at the end of the holes, highlighting the economic potential of the lower saprolite zones.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 19th November 2024
Holes EMA-TR-229, 216 and 234 (Figure 5) are examples of the lower enrichment zone with the presence
of high NdPr grades at the base of drilling in the lowest weathering zone. It is anticipated that this
enrichment will be present in all holes in which the low weathering horizon has been intersected.
Figure 5 – Drill-hole profiles showing typical enrichment zone with high NdPr grades close to the fresh rock
interface.
Current Work Program at Ema till December 2024
The Ema project is currently focused on enhancing our understanding of the mineral resource through an
extensive infill drilling program (nearing completion) and ongoing metallurgical assessment. The key work
fronts ongoing until the end of December include;
1. Mineral Resource Infill Drilling
•
•
•
Complete 270-hole infill drilling program, currently ~95% complete
Collection of density data from deeper horizons to improve the accuracy of the MRE, now
completed
Drill targeting strategic locations that promise to yield significant insights into the mineralisation
for starter ISR assessment is complete
2. Processing and Metallurgical Testing
•
•
ANSTO metallurgical testing and assessment though steps of impurity removal, rare earths
precipitation and MREC (mixed rare earth carbonate) final product production to validate process
flow sheet is now complete
Completion of magnesium sulfate leaching assays to extract additional data from all infill drilling
holes which will under pin and support both the MRE update and scoping study is ongoing
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 19th November 2024
•
Conduct a comprehensive suite of metallurgical tests on a representative master sample to
determine processing characteristics from the current infill program
3. Mineral Resource Estimate update
•
Updated MRE based on the newly acquired density and assay data has commenced. Stage 1 MRE
update will include all assays received to date to underpin the scoping study. Stage 2 MRE update
will include all assays from the 270 hole program targeting completion in Q1 2025.
4. Completion of Scoping Study
•
Complete scoping study utilising metallurgical testing and mineral resource estimation to inform
the economic viability of the project
This announcement has been authorised for release by the Board of Directors.
For more information:
Andrew Reid
Managing Director
Brazilian Critical Minerals Ltd
E: andrew.reid@braziliancriticalminerals.com
M: +61 432 740 975
About Brazilian Critical Minerals Ltd
Brazilian Critical Minerals Limited (BCM) is a mineral
exploration company listed on the Australian
Securities Exchange.
Its major exploration focus is Brazil, in the Apuí
region, where BCM has discovered a world class Ionic
Adsorbed Clay (IAC) Rare Earth Elements deposit. The
Ema IAC project is contained within the 781 km² of
exploration tenements within the Colider Group.
BCM has defined an inferred MRE of 1.02Bt of REE’s
with metallurgical recoveries averaging 68% MREO
some of the highest for these types of deposits
anywhere in the world.
The Company is currently converting this MRE from
Inferred into the Indicated category with an extensive
drill program which will inform the scoping study and
economic analysis due for completion in late 2024.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 19th November 2024
Ema REE Project 2024 Mineral Resource Estimate – by cut-off grade
JORC
Category
cut-off
(ppm)
TREO
Tonnes
(Mt)
TREO
(ppm)
NdPr
(ppm)
DyTb
(ppm)
MREO
(ppm)
MREO:TREO
(%)
Inferred
Inferred
0
500
1,340
1,017
694
793
163
199
15
17
178
216
26
27
Inferred
600
863
836
218
18
236
28
Inferred
700
685
885
237
20
257
29
Inferred
800
494
936
259
21
280
30
Inferred
900
331
977
278
22
300
31
Competent Person Statement
The information in this announcement that relates to exploration results is based on information compiled
by Mr. Antonio de Castro, BSc (Hons), MAusIMM, CREA, who acts as BCM´s Senior Consulting Geologist
through the consultancy firm, ADC Geologia Ltda. Mr. de Castro has sufficient experience which is relevant
to the type of deposit under consideration and to the reporting of exploration results and analytical and
metallurgical test work to qualify as a competent person as defined in the 2012 Edition of the Joint Ore
Reserves Committee (JORC) “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves”. Mr. Castro consents to the report being issued in the form and context in which it
appears.
References
1
Brazilian Critical Minerals (ASX:BCM) ASX Announcement “Massive Maiden Mineral Resource Estimate
for Ema Project” 22.04.24
2
Brazilian Critical Minerals (ASX:BCM) ASX Announcement “World Leading Recoveries Confirmed at Ema
Project” 07.05.24
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the relevant market announcement and, in the case of mineral resource estimate,
that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. Refer to ASX announcement dated 22
April 2024.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 19th November 2024
Appendices
Appendix 1 – Auger hole intersections at a 500ppm TREO cut-off grade
Auger
hole
EMA-TR-175
EMA-TR-181
EMA-TR-184
EMA-TR-184
EMA-TR-187
EMA-TR-188
EMA-TR-189
EMA-TR-190
EMA-TR-205
EMA-TR-211
EMA-TR-212
EMA-TR-212
EMA-TR-213
EMA-TR-214
EMA-TR-215
EMA-TR-216
EMA-TR-217
EMA-TR-218
EMA-TR-220
EMA-TR-221
EMA-TR-222
EMA-TR-223
EMA-TR-224
EMA-TR-225
EMA-TR-226
EMA-TR-227
EMA-TR-229
EMA-TR-231
EMA-TR-231
EMA-TR-232
EMA-TR-234
EMA-TR-235
EMA-TR-236
EMA-TR-237
EMA-TR-238
EMA-TR-239
EMA-TR-240
EMA-TR-241
EMA-TR-242
EMA-TR-243
EMA-TR-244
EMA-TR-245
EMA-TR-246
EMA-TR-247
From
(m)
7
2
4
7
2
4
8
8
1
12
0
5
0
5
5
5
6
1
6
8
10
1
4
9
1
8
2
5
8
4
6
9
10
10
3
12
6
3
6
6
6
5
9
6
Interval
(m)
4
4
2
4
5
6
9
6
7
2
2
5
8
9.8
6
6
7
5.8
2
5
10
5
10
2
7
6
10
2
5
3
9
9
10
3
10
10
5
10
5
8
2
10
3
2
TREO
(ppm)
807
720
543
960
618
1,315
847
669
677
596
572
1,000
561
517
666
1,127
790
566
554
758
662
592
701
533
714
691
1,081
560
609
636
856
860
1,103
677
1,107
900
787
635
739
836
842
1,149
953
1,153
%
MREO1
24
24
13
28
7
30
28
26
14
21
16
22
18
18
24
29
26
21
25
27
18
15
21
22
12
31
30
18
24
29
32
27
27
29
28
22
22
21
24
20
16
34
17
15
% HREO2
21
19
20
21
14
26
21
21
27
17
33
22
25
18
15
23
24
20
24
21
17
28
18
18
16
18
17
22
21
27
17
22
20
29
29
18
18
19
20
16
14
20
14
15
NdPr
(ppm)
198
166
58
264
33
367
226
161
85
114
72
208
89
87
155
305
189
108
125
191
97
68
133
105
76
200
333
89
134
168
263
219
284
177
292
184
176
122
165
150
121
373
156
138
DyTb
(ppm)
17
14
12
20
9
31
18
14
19
10
20
21
14
9
9
26
19
11
13
15
11
18
12
10
12
12
18
13
12
17
13
18
23
20
34
17
14
12
15
13
12
22
13
16
1 MREO (Magnetic Rare Earth Oxide) = Tb4O7 + Dy2O3 + Nd2O3 + Pr6O11
2 HREO (Heavy Rare Earth Oxide) = Sm2O3 + Eu2O3 + Gd2O3 + Tb4O7 + Dy2O3 + Ho2O3 + Er2O3 + Tm2O3 + Yb2O3 + Y2O3 + Lu2O3
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
ASX Announcement
Released 19th November 2024
Auger
hole
EMA-TR-248
EMA-TR-249
EMA-TR-250
EMA-TR-251
EMA-TR-252
EMA-TR-253
EMA-TR-254
EMA-TR-255
EMA-TR-258
EMA-TR-260
EMA-TR-261
EMA-TR-262
EMA-TR-263
EMA-TR-264
EMA-TR-265
EMA-TR-265
EMA-TR-266
EMA-TR-267
EMA-TR-268
EMA-TR-269
EMA-TR-270
EMA-TR-271
EMA-TR-272
EMA-TR-273
EMA-TR-274
EMA-TR-275
EMA-TR-277
EMA-TR-278
EMA-TR-279
EMA-TR-280
EMA-TR-281
EMA-TR-282
EMA-TR-283
EMA-TR-284
EMA-TR-284
EMA-TR-285
EMA-TR-290
EMA-TR-291
EMA-TR-292
From
(m)
10
8
8
6
2
7
14
1
8
15
6
8
7
7
6
11
5
2
6
6
3
12
5
8
7
3
9
5
6
3
8
7
6
6
12
6
5
2
2
Interval
(m)
6
9
5
3
6
9
10
6
10
5
2
10
4
4
2
3
4
4
8
5
2
8
10
10
2
2
5
10
10
3
3
3
3
2
4
5
8
5
4
TREO
(ppm)
1,009
639
808
925
885
989
893
750
1,086
698
721
1,084
966
716
564
714
800
634
660
723
612
625
806
1,137
645
606
656
850
661
593
722
927
734
594
701
670
959
767
582
%
MREO1
23
26
22
20
16
30
21
30
30
19
29
20
24
12
10
24
19
22
21
13
15
20
22
32
12
15
25
23
28
13
18
22
20
21
26
22
32
22
19
% HREO2
17
22
20
16
14
18
18
16
15
20
21
16
18
14
16
20
16
20
20
17
15
15
21
29
11
18
21
19
21
16
123
20
17
24
22
18
22
17
22
NdPr
(ppm)
220
153
165
170
126
286
191
219
314
124
195
218
222
75
48
155
139
126
130
87
77
117
163
332
70
79
154
197
170
69
12
208
142
112
174
137
296
163
97
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
DyTb
(ppm)
17
15
17
15
13
18
18
11
17
14
16
18
17
11
10
15
13
13
13
13
9
10
18
32
7
12
14
16
15
10
17
18
14
14
15
12
21
13
13
ASX Announcement
Released 19th November 2024
Appendix 2 – Total REE oxide distribution down-hole
HoleID
From
To
EMA-TR-175
EMA-TR-175
EMA-TR-175
EMA-TR-175
EMA-TR-175
EMA-TR-175
EMA-TR-175
EMA-TR-175
EMA-TR-175
EMA-TR-175
1
2
3
4
5
6
7
8
9
10
2
3
4
5
6
7
8
9
10
10.8
TREO
(ppm)
350
358
325
339
408
428
563
688
781
1,328
5
5
6
6
7
10
14
23
28
35
NdPr
(ppm)
9
9
9
12
20
32
69
141
206
433
DyTb
(ppm)
9
9
10
9
9
9
10
15
16
28
EMA-TR-181
EMA-TR-181
EMA-TR-181
EMA-TR-181
EMA-TR-181
EMA-TR-181
EMA-TR-181
0.5
1
2
3
4
5
6
1
2
3
4
5
6
6.5
31
22
18
19
17
18
23
13
10
17
24
26
26
31
22
30
84
128
201
193
279
9
10
11
11
14
15
23
EMA-TR-184
EMA-TR-184
EMA-TR-184
EMA-TR-184
EMA-TR-184
EMA-TR-184
EMA-TR-184
EMA-TR-184
EMA-TR-184
EMA-TR-184
2
3
4
5
6
7
8
9
10
11
318
448
568
518
415
522
641
994
1,533
1,338
31
24
19
21
24
20
22
21
21
23
9
8
11
16
19
21
26
32
31
33
19
26
48
69
66
100
151
302
441
413
11
12
13
12
11
12
15
21
30
29
EMA-TR-187
EMA-TR-187
EMA-TR-187
EMA-TR-187
EMA-TR-187
EMA-TR-187
EMA-TR-187
1
2
3
4
5
6
7
210
463
531
587
504
792
677
39
17
14
14
17
11
14
12
5
5
6
7
5
12
16
14
18
26
24
29
69
9
9
9
9
10
9
10
EMA-TR-189
EMA-TR-189
EMA-TR-189
EMA-TR-189
8
9
10
11
499
673
641
601
19
15
18
20
20
18
24
26
89
111
142
145
10
10
12
12
% HREO
% MREO
23
24
28
25
21
19
18
22
21
23
248
400
546
582
834
786
983
3
4
5
6
7
8
9
10
11
11.4
0.5
1
2
3
4
5
6
7
8
9
10
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Average
(ppm)
807
720
543
960
618
ASX Announcement
Released 19th November 2024
HoleID
From
To
EMA-TR-189
EMA-TR-189
EMA-TR-189
EMA-TR-189
EMA-TR-189
EMA-TR-189
11
12
13
14
15
16
12
13
14
15
16
17
TREO
(ppm)
679
763
900
1,620
972
772
28
33
33
34
28
26
NdPr
(ppm)
181
239
283
514
247
170
DyTb
(ppm)
10
12
15
36
27
27
EMA-TR-190
EMA-TR-190
EMA-TR-190
EMA-TR-190
EMA-TR-190
EMA-TR-190
EMA-TR-190
EMA-TR-190
EMA-TR-190
EMA-TR-190
5
6
7
8
9
10
11
12
13
14
6
7
8
9
10
11
12
13
14
14.4
24
16
21
19
19
20
21
22
23
23
9
12
19
19
24
27
29
28
27
26
23
50
82
101
141
172
209
198
155
134
9
8
10
11
12
13
15
16
15
13
EMA-TR-205
EMA-TR-205
EMA-TR-205
EMA-TR-205
EMA-TR-205
EMA-TR-205
EMA-TR-205
EMA-TR-205
EMA-TR-205
0.5
1
2
3
4
5
6
7
8
486
672
612
628
563
554
584
914
1,148
33
27
30
27
29
28
28
21
20
13
12
12
11
11
11
16
22
26
46
60
55
51
44
43
77
178
277
18
20
21
19
18
17
17
20
23
EMA-TR-211
EMA-TR-211
EMA-TR-211
EMA-TR-211
EMA-TR-211
EMA-TR-211
EMA-TR-211
EMA-TR-211
EMA-TR-211
EMA-TR-211
5
6
7
8
9
10
11
12
13
14
287
186
479
317
1,131
397
475
414
643
549
27
34
13
24
7
23
21
21
16
18
6
7
3
6
3
10
16
18
20
22
10
6
8
11
23
31
63
64
118
111
9
7
7
8
9
10
11
9
11
10
EMA-TR-212
EMA-TR-212
EMA-TR-212
EMA-TR-212
1
2
3
4
517
600
458
489
36
32
43
53
17
16
16
14
67
75
52
40
20
21
21
28
% HREO
% MREO
16
17
18
24
28
35
368
485
487
579
627
678
779
758
633
567
1
2
3
4
5
6
7
8
8.5
4
5
6
7
8
9
10
11
12
13
0.5
1
2
3
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Average
(ppm)
847
669
677
1131
596
572
ASX Announcement
Released 19th November 2024
HoleID
From
To
EMA-TR-212
EMA-TR-212
EMA-TR-212
EMA-TR-212
EMA-TR-212
EMA-TR-212
4
5
6
7
8
9
5
6
7
8
9
10
TREO
(ppm)
452
632
760
1,324
1,000
1,286
14
13
21
23
26
27
NdPr
(ppm)
38
61
142
278
245
313
DyTb
(ppm)
25
22
19
21
14
30
EMA-TR-213
EMA-TR-213
EMA-TR-213
EMA-TR-213
EMA-TR-213
EMA-TR-213
EMA-TR-213
EMA-TR-213
EMA-TR-213
0.5
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
8.8
33
32
26
23
23
21
22
23
26
18
16
17
19
17
16
21
21
21
74
69
86
106
82
84
103
98
93
18
18
17
16
13
12
13
11
12
EMA-TR-214
EMA-TR-214
EMA-TR-214
EMA-TR-214
EMA-TR-214
EMA-TR-214
EMA-TR-214
EMA-TR-214
EMA-TR-214
EMA-TR-214
5
6
7
8
9
10
11
12
13
14
457
554
474
433
543
533
518
500
483
678
18
14
19
21
16
18
18
19
20
19
9
10
19
18
16
19
21
23
22
27
30
49
80
71
77
91
98
107
99
173
9
8
9
9
9
10
9
9
9
12
EMA-TR-215
EMA-TR-215
EMA-TR-215
EMA-TR-215
EMA-TR-215
EMA-TR-215
EMA-TR-215
EMA-TR-215
EMA-TR-215
EMA-TR-215
2
3
4
5
6
7
8
9
10
10.8
260
247
278
396
544
543
604
748
770
827
31
28
24
21
15
17
15
14
14
14
12
11
12
15
13
21
23
27
30
30
22
19
27
49
64
104
132
195
220
236
8
7
7
9
9
10
9
10
9
10
EMA-TR-216
EMA-TR-216
EMA-TR-216
EMA-TR-216
2
3
4
5
267
253
308
465
30
31
26
23
16
15
14
21
33
30
35
88
9
8
8
10
% HREO
% MREO
52
33
24
16
15
24
519
533
610
637
559
586
558
510
505
6,0
7,0
8,0
9,0
10,0
11,0
12,0
13,0
14,0
14.8
1
2
3
4
5
6
7
8
9
10
1
2
3
4
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Average
(ppm)
1000
561
517
666
ASX Announcement
Released 19th November 2024
HoleID
From
To
EMA-TR-216
EMA-TR-216
EMA-TR-216
EMA-TR-216
EMA-TR-216
EMA-TR-216
5
6
7
8
9
10
6
7
8
9
10
11
TREO
(ppm)
760
1,244
1,624
1,439
919
774
24
23
33
33
30
29
NdPr
(ppm)
169
265
495
443
256
201
DyTb
(ppm)
16
21
37
36
23
20
EMA-TR-217
EMA-TR-217
EMA-TR-217
EMA-TR-217
EMA-TR-217
EMA-TR-217
EMA-TR-217
EMA-TR-217
EMA-TR-217
EMA-TR-217
3
4
5
6
7
8
9
10
11
12
4
5
6
7
8
9
10
11
12
12.9
23
22
22
20
21
23
23
25
27
28
13
15
18
19
23
28
27
29
29
27
42
50
73
99
164
209
196
239
235
181
10
9
11
12
17
19
18
21
23
20
EMA-TR-218
EMA-TR-218
EMA-TR-218
EMA-TR-218
EMA-TR-218
EMA-TR-218
0,5
1
2
3
4
5
461
593
495
557
523
662
18
18
21
20
20
19
9
14
19
19
25
28
31
70
82
97
120
174
9
11
10
11
11
12
EMA-TR-219
EMA-TR-219
EMA-TR-219
EMA-TR-219
EMA-TR-219
EMA-TR-219
EMA-TR-219
EMA-TR-219
1
2
3
4
5
6
7
8
254
304
462
356
161
220
371
453
28
26
24
35
29
28
27
23
17
16
12
15
16
16
17
19
36
39
44
38
21
29
52
77
7
8
12
13
5
6
11
10
EMA-TR-220
EMA-TR-220
EMA-TR-220
EMA-TR-220
EMA-TR-220
EMA-TR-220
EMA-TR-220
EMA-TR-220
1
2
3
4
5
6
7
8
411
301
300
333
479
494
509
599
35
36
33
28
24
25
25
23
16
18
21
24
27
26
25
25
52
42
53
71
117
114
114
136
15
11
10
10
11
12
12
13
% HREO
% MREO
21
18
23
26
26
26
407
405
460
591
791
829
778
895
893
744
1
2
3
4
5
5.8
0,5
1
2
3
4
5
6
7
0.5
1
2
3
4
5
6
7
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Average
(ppm)
1127
790
566
554
ASX Announcement
Released 19th November 2024
HoleID
From
To
EMA-TR-221
EMA-TR-221
EMA-TR-221
EMA-TR-221
EMA-TR-221
EMA-TR-221
EMA-TR-221
EMA-TR-221
EMA-TR-221
EMA-TR-221
4
5
6
7
8
9
10
11
12
13
5
6
7
8
9
10
11
12
13
14
TREO
(ppm)
389
418
629
289
547
879
897
750
717
482
7
6
4
14
18
26
30
30
30
25
NdPr
(ppm)
19
15
14
30
86
213
252
210
194
109
DyTb
(ppm)
10
9
10
9
10
14
17
16
18
12
EMA-TR-222
EMA-TR-222
EMA-TR-222
EMA-TR-222
EMA-TR-222
EMA-TR-222
EMA-TR-222
EMA-TR-222
EMA-TR-222
EMA-TR-222
10
11
12
13
14
15
16
17
18
19
11
12
13
14
15
16
17
18
19
19.5
8
15
16
22
16
18
20
20
19
22
3
9
16
18
16
20
21
24
26
30
22
47
111
84
89
99
104
127
134
215
9
12
14
12
10
10
11
11
10
16
EMA-TR-223
EMA-TR-223
EMA-TR-223
EMA-TR-223
EMA-TR-223
EMA-TR-223
EMA-TR-223
EMA-TR-223
EMA-TR-223
EMA-TR-223
1
2
3
4
5
6
7
8
9
10
509
639
646
566
599
428
456
479
575
744
31
27
26
28
29
37
34
33
28
23
14
15
16
14
14
13
11
14
17
22
53
77
87
62
63
39
32
48
82
145
17
19
18
17
19
17
17
17
17
18
EMA-TR-224
EMA-TR-224
EMA-TR-224
EMA-TR-224
EMA-TR-224
EMA-TR-224
EMA-TR-224
EMA-TR-224
EMA-TR-224
EMA-TR-224
4
5
6
7
8
9
10
11
12
13
543
838
940
792
609
718
619
667
635
619
21
15
13
16
20
19
20
19
20
20
17
15
16
23
23
25
24
23
23
23
78
110
137
172
131
163
137
140
134
129
11
12
12
12
12
13
12
12
12
12
% HREO
% MREO
24
20
14
29
18
17
20
23
26
25
1,063
687
798
521
612
543
549
573
552
780
2
3
4
5
6
7
8
9
10
10.4
5
6
7
8
9
10
11
12
13
13.6
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Average
(ppm)
629
758
662
592
619
701
ASX Announcement
Released 19th November 2024
HoleID
From
To
TREO
(ppm)
% HREO
% MREO
NdPr
(ppm)
DyTb
(ppm)
EMA-TR-225
EMA-TR-225
EMA-TR-225
EMA-TR-225
EMA-TR-225
EMA-TR-225
EMA-TR-225
EMA-TR-225
EMA-TR-225
EMA-TR-225
2
3
4
5
6
7
8
9
10
11
3
4
5
6
7
8
9
10
11
11.3
365
467
441
313
279
323
456
523
547
519
32
35
32
39
36
26
18
17
18
18
18
18
18
17
18
19
21
21
22
22
53
64
64
41
38
51
85
101
110
104
13
17
15
13
11
9
9
9
11
9
EMA-TR-226
EMA-TR-226
EMA-TR-226
EMA-TR-226
EMA-TR-226
EMA-TR-226
EMA-TR-226
EMA-TR-226
0,5
1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
409
561
663
948
746
631
733
716
24
18
18
11
14
19
15
16
10
8
9
7
13
16
17
17
28
33
49
56
83
87
116
111
11
11
13
11
12
13
11
12
EMA-TR-227
EMA-TR-227
EMA-TR-227
EMA-TR-227
EMA-TR-227
EMA-TR-227
EMA-TR-227
EMA-TR-227
EMA-TR-227
EMA-TR-227
5
6
7
8
9
10
11
12
13
14
6
7
8
9
10
11
12
13
14
14.4
455
460
474
659
649
633
673
765
751
736
21
18
19
17
16
18
19
20
20
18
20
20
23
27
30
31
31
32
32
32
79
83
98
169
183
185
197
233
227
221
10
9
9
11
10
10
13
14
14
13
EMA-TR-228
EMA-TR-228
EMA-TR-228
EMA-TR-228
EMA-TR-228
EMA-TR-228
EMA-TR-228
EMA-TR-228
0.5
1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
209
268
321
294
290
471
447
592
31
22
21
24
26
19
19
18
9
6
7
12
12
10
18
23
11
10
17
26
27
37
71
123
7
6
7
8
8
10
9
11
EMA-TR-229
EMA-TR-229
2
3
3
4
519
673
15
15
13
21
60
128
8
11
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Average
(ppm)
533
714
691
592
1,081
ASX Announcement
Released 19th November 2024
HoleID
From
To
EMA-TR-229
EMA-TR-229
EMA-TR-229
EMA-TR-229
EMA-TR-229
EMA-TR-229
EMA-TR-229
EMA-TR-229
4
5
6
7
8
9
10
11
5
6
7
8
9
10
11
11.7
TREO
(ppm)
921
1,124
1,122
1,173
1,380
1,206
1,387
1,398
23
31
35
36
36
36
38
37
NdPr
(ppm)
202
337
375
402
470
411
496
494
DyTb
(ppm)
11
16
19
21
23
21
27
30
EMA-TR-230
EMA-TR-230
EMA-TR-230
EMA-TR-230
EMA-TR-230
EMA-TR-230
EMA-TR-230
EMA-TR-230
EMA-TR-230
0,5
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
35
35
29
23
32
34
28
18
21
17
17
18
17
17
17
18
20
22
49
48
49
43
46
42
57
67
80
14
14
10
8
12
12
11
7
9
EMA-TR-231
EMA-TR-231
EMA-TR-231
EMA-TR-231
EMA-TR-231
EMA-TR-231
EMA-TR-231
EMA-TR-231
EMA-TR-231
EMA-TR-231
4
5
6
7
8
9
10
11
12
13
473
579
542
490
605
608
635
648
549
496
25
21
22
24
20
21
20
21
21
23
16
18
18
20
23
23
24
24
25
25
64
93
85
84
128
129
142
144
126
111
12
13
12
12
12
12
12
13
11
11
EMA-TR-232
EMA-TR-232
EMA-TR-232
EMA-TR-232
EMA-TR-232
EMA-TR-232
EMA-TR-232
1
2
3
4
5
6
6.8
363
368
356
482
664
660
571
33
34
33
26
23
28
30
19
19
19
24
30
29
28
57
57
56
104
182
172
146
13
13
13
13
15
18
17
EMA-TR-233
EMA-TR-233
EMA-TR-233
EMA-TR-233
EMA-TR-233
1
2
3
4
5
346
385
391
354
334
37
37
35
37
35
17
17
17
16
17
46
50
51
42
45
13
15
15
14
12
% HREO
% MREO
12
15
18
18
17
18
21
23
369
358
329
304
348
326
378
370
402
5
6
7
8
9
10
11
12
13
13.5
0.5
1
2
3
4
5
6
0.5
1
2
3
4
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ricardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Average
(ppm)
560
609
636
ASX Announcement
Released 19th November 2024
HoleID
From
To
EMA-TR-233
EMA-TR-233
EMA-TR-233
EMA-TR-233
EMA-TR-233
5
6
7
8
9
6
7
8
9
10
TREO
(ppm)
318
233
437
483
511
17
17
21
22
22
NdPr
(ppm)
40
32
82
94
103
DyTb
(ppm)
13
8
10
10
9
EMA-TR-234
EMA-TR-234
EMA-TR-234
EMA-TR-234
EMA-TR-234
EMA-TR-234
EMA-TR-234
EMA-TR-234
EMA-TR-234
EMA-TR-234
6
7
8
9
10
11
12
13
14
15
7
8
9
10
11
12
13
14
15
15.5
15
16
14
16
14
16
16
19
21
20
34
33
34
30
30
31
33
33
32
29
253
312
296
244
210
225
302
275
275
217
10
13
11
12
9
11
14
15
17
14
856
EMA-TR-235
EMA-TR-235
EMA-TR-235
EMA-TR-235
EMA-TR-235
EMA-TR-235
EMA-TR-235
EMA-TR-235
EMA-TR-235
EMA-TR-235
9
10
11
12
13
14
15
16
17
18
506
551
602
789
881
1,168
1,080
1,207
977
761
21
21
19
17
16
20
24
27
29
28
21
23
24
23
25
31
32
31
28
27
98
116
132
170
206
344
321
343
251
188
10
11
11
13
14
22
24
31
27
20
860
EMA-TR-236
EMA-TR-236
EMA-TR-236
EMA-TR-236
EMA-TR-236
EMA-TR-236
EMA-TR-236
EMA-TR-236
EMA-TR-236
EMA-TR-236
11
12
13
14
15
16
17
18
19
20
735
756
949
868
1,071
1,184
1,137
1,074
1,438
1,817
17
17
17
18
19
17
20
21
25
31
23
24
23
25
27
22
29
32
33
32
158
167
204
207
273
247
306
316
439
523
12
12
15
14
19
18
22
23
36
55
EMA-TR-237
EMA-TR-237
EMA-TR-237
EMA-TR-237
11
12
13
14
821
694
515
445
29
30
28
26
31
29
26
24
230
183
118
95
24
21
16
12
% HREO
% MREO
38
33
21
21
19
769
978
905
850
728
755
954
869
924
791
10
11
12
13
14
15
16
17
18
18,2
10
11
12
13
14
15
16
17
18
19
10
11
12
13
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 60
Share your feedback
Discover