Quarterly Activities Report
Released
Released
Announcement PDF
ASX Announcement
Released 29th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
QUARTERLY ACTIVITIES REPORT
For the period ending 30 t h June 2025
Highlights
•
74% magnet (MREE) recovery and 62% (TREE + Y) recovery from ISR (in-situ recovery) column
test at ANSTO (Australian Nuclear Science and Technology Organisation) significantly higher
than recent scoping study base parameters
•
ISR recoveries were achieved over only 28 days of leaching, resulting from permeability flow
rates sufficient for commercial extraction achieved using low strength 0.5M MgSO4, pH 4.5,
at ambient temperatures
•
The Amazonas state Environmental Protection Institute (IPAAM) approved the use of
magnesium sulphate for the Ema field pilot trial
•
In-situ recovery (ISR) mining field pilot trial injecting magnesium sulphate into shallow clay
horizon commenced at the Ema Project
•
Field pilot trial was supervised by global industry ISR leader WSP Brazil and overseen by CERN
environmental following successful lab trials conducted at ANSTO1
•
Injected solution recorded in all downslope monitoring holes after only 72 hours, exceeding
internal expectations
•
Injection test validated hydraulic connectivity in the test wells within the mineralised zone
•
Solution breakthrough, measured water levels and pressure readings within the mineralised
zone provided evidence of the deposit's exceptional hydraulic conditions
•
Chemical changes in the solution confirmed that magnesium sulphate has migrated from the
injection holes to the extraction holes in the field trial locations
•
pH levels reduced significantly in the extraction solution with the addition of low
concentration MgS04 (0.5M) to the level of pH 4.0, the level required to leach rare earths into
solution via in-situ recovery
•
Solution flows through the clay zone exceeded laboratory estimates and both the injection
and extraction wells as well as showing a steady rise in solution levels over time indicating the
basement rock is largely impermeable
•
Heavily oversubscribed placement raises $4.0 million to advance ema rare earths project
•
Cash and cash equivalents as of June 30th 2025 of A$1.70M
Brazilian Critical Minerals Limited (ASX: BCM) (“BCM” or the “Company”) is pleased to provide details
of activities during the quarter ended 30 June 2025 at the Ema project in the Apuí region of Brazil.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 1
ASX Announcement
Released 29th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Safety
No accidents or incidents were reported during the quarter.
ANSTO ISR Test
The Company requested ANSTO to conduct a standard ISR column test on the Ema material. The test
involved packing the ore into a column to achieve a bulk density as close as possible to that underground
and feeding the MgSO4 lixiviant through the mineralised material at a pressure equivalent to that at the
depth of the orebody, with the column in a vertical configuration.
Results
A head grade analysis of the sample was determined at ALS Geochemistry Laboratory, Brisbane to
contain 829ppm TREY (15 REE elements + Yttrium) of which 30% or 250ppm were of the elements Nd,
Pr, Dy and Tb.
Over the course of 28 days, the MgS04 lixiviant at pH 4.5 was injected through the column which resulted
in high recoveries of TREY and MREE relative to the recent values used in the Ema scoping study1 (table
1).
Key takeaways;
•
•
•
High recoveries of MREE achieved over the test period (table 1), with most of the recovery
occurring over only 17 days
<2 pore volumes (the ratio of the material's air volume to total volume) required to achieve final
recoveries (Figure 1.)
Individual MREE recoveries were;
o Praseodymium 85%;
o Neodymium 72%;
o Terbium 70%; and
o Dysprosium 63%
Table 1. Comparison of Scoping Study recoveries vs ANSTO Column recoveries
TREY (%)
MREE (%)
1
48
62
ANSTO Column Recoveries
62
74
Scoping Study Recoveries
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 2
ASX Announcement
Released 29th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Figure 1. Solution concentration of rare earth elements in (ppm) over the 28-day test period.
Figure 2. Cumulative extraction of rare earth elements in (%) over the 28-day test period
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 3
ASX Announcement
Released 29th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Field Pilot Trial
BCM commenced a series of ISR field trials (Figure 1.) at the Ema rare earths project which allowed the
Company to assess the hydrogeological conditions, obtain valuable information on the leach
characteristics of the rare earths, whilst collecting solutions rich in rare earths able to generate a final
mixed rare earth carbonate product.
The field pilot trial included the installation of injection and extraction holes drilled a set distance apart,
with the time taken for the solution to be recorded in the extraction holes is used to determine and
calculate the hydraulic permeability.
After only 72hrs of commencement of the first injection trial, all the extraction holes recorded significant
influx of solution demonstrating the suitability of the chosen method for leaching at the Ema deposit.
Figure 1. Field trial location within the central starter zone location
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 4
ASX Announcement
Released 29th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Clay Permeability
The injection and extraction/monitoring holes (Figure 2.) were drilled at site location 2 in order to be
able to determine the time taken for solution to percolate through the clay horizon.
Figure 2. Injection and extraction/monitoring hole setup over a selective field trial area.
For each of the monitoring holes, the solution level was measured several times daily. Figure 3 shows
the time taken for the initial solution to reach the monitoring holes;
• H2-10 – achieved breakthrough inside of 3hrs
• H2-11 – achieved breakthrough inside of 26hrs; and
• H2-12 – achieved breakthrough inside of 46hrs.
The time taken for solution to be recorded in the wells is in direct proportion to their distance from the
injection wells. This data suggests strong percolation of fluids through the clay horizon with the
information captured to be collated and used for hydrogeological modelling as part of the upcoming
bankable feasibility study and as part of our environmental permitting application which is directed by
CERN.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 5
ASX Announcement
Released 29th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Figure 3. Solution levels measured daily and time taken for initial solution to reach monitoring holes.
pH Target
Chemical changes in the solution clearly showed that the magnesium sulphate had migrated from the
injection holes to the extraction holes in the field trial locations. The in-situ pH levels were reduced
significantly within the extraction solution with the addition of low concentration MgS04 (0.5M) and
were recorded at or below pH 4.0 (Figure 4.), the level required to leach rare earths into solution via insitu recovery (ISR).
Solutions potentially containing rare earths were extracted from the monitoring holes and sent to the
laboratory for analysis.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 6
ASX Announcement
Released 29th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Figure 4. pH measurements from 2 ISR field monitoring holes at location 1 (H1-8 and H1-9) versus pH
measurements taken from column laboratory testing over the same time period. Red circle indicates
levels at which rare earths become soluble.
Strong Bedrock Integrity Supports ISR Success
Monitoring hole data from the field trial (Figure 2) not only shows the initial time taken for solution to
reach these wells post injection but also records the daily solution levels above the bottom of the hole
(recorded as depth 0). The consistent upward trend in solution levels observed across the first 100 hours
of injection indicated full in-situ saturation of the clays, retention of solution within the mineralised zone
and minimal solution loss—attributed to the impermeable nature of the underlying fresh bedrock.
Importantly, these trends have been observed consistently across the entire trial area to date (Figure 3),
confirming a key condition for the successful deployment of in-situ recovery. This represents a significant
technical validation and a major de-risking milestone for the project.
Placement
BCM received binding commitments to raise A$4.0 million (before costs) via a strongly supported and
oversubscribed two-tranche share placement to professional and institutional investors (“Placement”).
Proceeds from the Placement will allow BCM to significantly accelerate workstreams at its flagship Ema
Rare Earths Project in Brazil. Funds will be used to commence a Bankable Feasibility Study (BFS),
complete pilot field trials for in-situ recovery (ISR), progress environmental permitting, and strengthen
the Company’s working capital position to support pre-development activities. The funding comes at a
pivotal time for the Company, as BCM transitions from successful early-stage technical validation to
formal project de-risking and commercial readiness. This capital raise places BCM in a strong position to
unlock further value from one of the world’s largest ionic clay rare earths deposits
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 7
ASX Announcement
Released 29th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
The Company has accepted firm commitments to raise A$4.0 million through the issuance of
500,000,000 new fully paid ordinary shares at A$0.008 per share. The Placement will be completed in
two tranches: Tranche 1 comprises 247,574,647 shares (A$1.98 million) to be issued under the
Company’s existing placement capacity pursuant to ASX Listing Rules 7.1 and 7.1A. Tranche 2 comprises
252,425,353 shares (A$2.02 million) and will be subject to shareholder approval at a General Meeting
expected to be held in late July 2025.
In addition to the shares, investors will receive one (1) free-attaching unlisted option for every three (3)
new shares subscribed for, exercisable at A$0.011 with a two-year expiry, subject to shareholder
approval. Cornerstone investors included high-conviction strategic funds and resource-focused
institutions, with strong representation from new and existing shareholders.
Corporate
For the purpose of Section 6 of the Appendix 5B, all payments made to related parties have been paid
in relation to director fees.
References
1
Brazilian Critical Minerals (ASX:BCM) – ISR testwork from ANSTO achieves high recoveries 12th March
2025
2
Brazilian Critical Minerals (ASX:BCM) – Ema Field Trial receives magnesium Sulphate Approval 28th
March 2025
3
Brazilian Critical Minerals (ASX:BCM) – Ema Field Trial Commences 14th May 2025
4
Brazilian Critical Minerals (ASX:BCM) – Ema ISR field trial achieves first major permeability hurdle 27th
May 2025
5
Brazilian Critical Minerals (ASX:BCM) – Placement raises $4.0 Million to advance Ema project 5th June
2025
6
Brazilian Critical Minerals (ASX:BCM) – Magnesium Sulphate recorded in multiple field trial areas 13th
June 2025
7
Brazilian Critical Minerals (ASX:BCM) – Ema Rare Earths Scoping Study confirms low CAPEX and OPEX
26th February 2025
This announcement has been authorised for release by the Board of Directors.
For more information:
Andrew Reid
Managing Director
Brazilian Critical Minerals Ltd
E: andrew.reid@braziliancriticalminerals.com
M: +61 432 740 975
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 8
ASX Announcement
Released 29th July 2025
https://braziliancriticalminerals.com/
Investor Hub: https://braziliancriticalminerals.com/auth/signup
Competent Person Statement
The information in this announcement that relates to exploration results is based on information
compiled by Mr. Antonio de Castro, BSc (Hons), who is a member of Australasian Institute of Mining and
Metallurgy (AusIMM), CREA, who acts as BCM´s Senior Consulting Geologist through the consultancy
firm, ADC Geologia Ltda. Mr. de Castro has sufficient experience which is relevant to the type of deposit
under consideration and to the reporting of exploration results and analytical and metallurgical test
work to qualify as a competent person as defined in the 2012 Edition of the Joint Ore Reserves
Committee (JORC) “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr. Castro consents to the report being issued in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the relevant market announcements and, in the case of mineral resource
estimate, that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcement continue to apply and have not materially changed.
Additional Information required under Listing Rule 5.3.3
Tenements held at the end of the quarter
Area (Ha)
Percentage ownership
ANM Permit Number 880.107/08
Location Brazil (Ema)
9,839.91
100%
Exploration Licence
ANM Permit 880.184/16
Location Brazil (Ema East)
9,034.00
100%
Exploration Licence
ANM Permit Number 880.090.08
Location Brazil (Três Estados)
8,172.25
100%
Exploration Licence
ANM Permit Number 880.025/2023
Location Brazil (Apuí iREE)
2,417.00
100%
Exploration Licence
ANM Permit Number 880.026/2023
Location Brazil (Apuí iREE)
6,591.90
100%
Exploration Licence
ANM Permit Number 880.027/2023
Location Brazil (Apuí iREE)
5,856.00
100%
Exploration Licence
ANM Permit Number 880.259/2020
Location Brazil (Apuí iREE)
9,092.01
100%
Exploration Licence
ANM Permit Number 880.149/2017
Location Brazil (Apuí iREE)
9,815.15
100%
Exploration License
ANM Permit Number 880.076/2023
Location Brazil (Apuí ENE iREE)
8,475.30
100%
Exploration application
ANM Permit Number 880.077/2023
Location Brazil (Apuí ENE iREE)
8,856.84
100%
Exploration application
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Level 28, 140 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: MINERAÇÃO BBX DO BRASIL LTDA, Rua dos Inconfidentes n⁰ 867, Savassi, Belo Horizonte, Minas Gerais, CEP 30.140-128
Page | 9
Share your feedback