ASX ANNOUNCEMENT
29 January 2024
CETEM AMMONIUM SULPHATE LEACH
IONIC ADSORBED CLAY REE TEST
Brazilian Critical Minerals Limited (ASX: BCM) (“BCM” or the “Company”) is pleased to announce highly
encouraging results from ammonium sulphate leach and carbonate precipitation test work conducted at
the Brazilian Government Mineral Research Institute, CETEM. The tests, on a composite sample from a
selected 7m interval (12-19m downhole, appendix 3) from drill hole EMD 0171 were designed to evaluate
the effect of varying operational parameters such as solid/liquid ratio, ammonium sulphate and NaCl
concentrations, and subsequently to recover the REE´s in the form of carbonates.
Highlights
•
•
•
•
20% reduction in ammoniam sulphate dosage rate to 1.6% compared to previous SGS
leach results
Results confirm REE’s at the EMA prospect are ionic and can be recovered at low acid
dosage rates
High purity REE carbonate concentrate
REE recoveries of virtually 100% in carbonate concentrate
A series of ammonium sulphate/NaCl leach tests was conducted on individual 250g samples crushed after
homogenisation to -0.85mm, varying the liquid/solid ratio and the ammonium sulphate ((NH4)2SO4) and
NaCl dosages. pH was maintained constant at 4, as were other parameters such as temperature (25deg. C)
and agitation conditions (1000rpm for 30 minutes).
Variations in liquid/solid ratio, from 2 to 4, and NaCl dosage from 1 to 3% showed a negligible effect on
REE recoveries. A significant increase in recoveries with increasing ammonium sulphate dosages was
observed up to a dosage of 16kg/t of sample, with no increase at higher dosage levels (see table 1 .
All assays were carried out by ICP-OES, with all values quoted as elemental REEs, not converted to the
oxide form.
Table 1 - REEs and major elements recovered at varying ammonium sulphate dosages.
(NH4)2SO4
kg/t
La
Ce
Pr
Nd
Sm
Eu
Gd
Tb
Dy
Ho
Er
Tm
Yb
Lu
Y
Sc
Fe
Al
Si
Rock*
222
255
87
308
35
4
26
3
20
5
10
2
10
1
91
-
17484
96531
326650
SGS**
83
18
24
97
15
2
9
1
6
1
4
1
3
1
35
<0,24
<2
39
<100
0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0
9.4
0.0
11.5
1
1.2
0.4
0.8
1.8
0.0
0.0
0.0
0.0
0.3
0.0
0.0
0.0
0.0
0.0
0.9
0
0.0
2.2
16.1
2
10.4
2.2
3.0
12.6
1.9
0.3
0.0
3.1
0.9
0.0
0.7
0.0
0.4
0.1
5.9
0
1.2
52.2
17.9
4
20.3
5.5
5.8
26.9
3.9
0.5
0.0
3.5
1.4
0.2
1.2
0.0
0.8
0.1
10.1
0
9.4
15.8
21.2
8
53.1
14.3
16.3
67.0
9.1
1.2
4.4
3.6
3.0
0.7
3.2
0.0
2.0
0.3
25.8
0
9.3
47.7
23.4
16
82.5
23.1
24.3
110.5
15.1
1.8
8.2
5.4
4.9
1.3
4.9
0.0
3.6
0.4
39.1
0
9.3
75.6
21.7
* Untreated sample
** SGS 2% ammonium sulphate leach (without NaCl)
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Following filtration, the solutions were treated with sodium carbonate at pH 8 to precipitate the REE´s in
the form of carbonates. The resulting concentrate showed a high degree of purity, comprising 98-99% REE
carbonates and aluminium hydroxide. Assaying of the solution after filtering showed that recovery of REE´s
was virtually complete, with solution assays generally below detection limit.
These results clearly show the applicability of ammonium sulphate leaching at relatively low dosages and
subsequent REE carbonate precipitation to the Ema mineralisation style. A full suite of metallurgical tests
on a representative Ema sample is currently being planned at the ANSTO laboratory in Sydney.
This announcement has been authorised for release by the Board of Directors.
For more information:
Ken Kluksdahl
Chairman
ken.kluksdahl@bbxminerals.com
About Brazilian Critical Minerals Ltd
BCM is a unique mineral exploration and mineral processing technology company listed on the Australian
Securities Exchange. Its major exploration focus is Brazil, mainly in the southern Amazon, a region BBX
believes is vastly underexplored with high potential for the discovery of world class gold-PGM, base metal
and Ionic Adsorbed Clay (IAC) Rare Earth Element deposits. BBX’s key assets are the Três Estados and Ema
gold-PGM projects and the iREE projects at Ema, Ema East and Apui. The company has 718km² of
exploration tenements within the Colider Group and adjacent sediments, a prospective geological
environment for gold, PGM, base metal and iREE deposits.
BCM is also developing an environmentally friendly and sustainable beneficiation process to extract
precious metals using a unique bio leach process. This leading-edge process, that extracts precious metals
naturally, is being developed initially for the primary purpose of economically extracting Platinum Group
metals from the Três Estados mineral deposit. It is expected that such technology will be transferable and
relevant to many other PGM projects. BCM believes that this processing technology is critical in the
environmentally timely PGM space and supports a societal need to move towards a carbon neutral
economy.
Competent Person Statement
The information in this report that relates to exploration results is based on information compiled by Mr.
Antonio de Castro, BSc (Hons), MAusIMM, CREA, who acts as BCM´s Senior Consulting Geologist through
the consultancy firm, ADC Geologia Ltda. Mr. de Castro has sufficient experience which is relevant to the
type of deposit under consideration and to the reporting of exploration results and analytical and
metallurgical test work to qualify as a competent person as defined in the 2012 Edition of the Joint Ore
Reserves Committee (JORC) “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves”. Mr. Castro consents to the report being issued in the form and context in which it
appears.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
References
1
BBX Minerals Limited (ASX:BBX) ASX Announcement “Ammonium Sulphate Test confirms presence of IAC
REE” on 19.07.23.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Appendices
Appendix 1: Ema drill collar location
Appendix 2: Drillhole location for hole tested
Hole ID
East
North
RL (m)
Azimuth
DIP
Depth (m)
Tenement
Method
EMD-017
184607.00
9176595.00
154.00
0
-90
51.45
880.107/2008
DD
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Appendix 3: SGS REE oxide assay of the results of desorbed REE oxide from each interval of hole EMD017, announced 19 July 2023
FROM (m)
4
6
8
10
12
14
16
17.5
TO (m)
6
8
10
12
14
16
17.5
19
La2O3 ppm
1.2
1.2
2.4
30.8
89.3
122.3
82.8
52.1
CeO2 ppm
12
13.8
17.1
36.4
25.4
15.8
28.5
15.9
Pr6O11 ppm
0.3
0.3
0.6
8.9
27.2
40.3
24.6
16
Nd2O3 ppm
1.4
1.4
1.4
32
101.7
151.9
92
63.1
Sm2O3 ppm
0.1
0.2
0.3
4.7
15.1
23.2
14.4
10
Eu2O3 ppm
0
0.1
0.1
0.9
3.2
5.5
3.6
2.4
Gd2O3 ppm
0.1
0.1
0.2
2.5
8.7
14.4
8.9
6.3
Tb4O7 ppm
0
0
0
0.3
1
1.7
1.1
0.8
Dy2O3 ppm
0.1
0.1
0.1
1.4
5.4
9.2
5.7
3.9
Ho2O3 ppm
0
0
0
0.3
1.1
1.9
1.2
0.8
Er2O3 ppm
0
0.1
0.1
0.8
3.2
5.5
3.6
2.4
Tm2O3 ppm
0
0
0
0.1
0.5
0.8
0.5
0.3
Yb2O3 ppm
0.2
0.2
0.2
0.8
3.1
5
3.4
2.3
Lu2O3 ppm
0
0
0
0.1
0.5
0.8
0.5
0.3
Y2O3 ppm
0.4
0.5
0.6
8.8
33.3
60.8
37.8
26.8
TREO ppm
16
18
23
129
319
459
309
203
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Appendix 4
The following Table and Sections are provided to ensure compliance with JORC Code (2012
Edition).
JORC (2012) Table 1 – Section 1: Sampling Techniques and Data for the metallurgical test
Item
Sampling
Techniques
JORC code explanation
Comments
• Nature and quality of
sampling (eg cut channels,
random chips, or specific
specialised
industry
standard
measurement
tools appropriate to the
minerals
under
investigation, such as
down hole gamma sondes,
or
handheld
XRF
instruments, etc). These
examples should not be
taken as limiting the broad
meaning of sampling.
• Metallurgical results are for a 7kg
composite sample from 12m to 19m of
diamond drill hole EMD 017, from the
diamond drilling completed during 2021,
conducted at CETEM, Brazil.
• Include
reference
to
measures taken to ensure
sample
representativity
and
the
appropriate
calibration
of
any
measurement tools or
systems used.
• Aspects
of
the
determination
of
mineralisation that are
Material to the Public
Report.
• In cases where ‘industry
standard’ work has been
done this would be
relatively
simple
(eg
‘reverse circulation drilling
was used to obtain 1 m
samples from which 3 kg
was pulverised to produce
a 30 g charge for fire
assay’). In other cases
more explanation may be
required, such as where
there is coarse gold that
has inherent sampling
• Diamond core was half split and sampled at
intervals, generally of 1m to 2m, with half
core retained in BBX´s core storage facility
and the other half sent to SGS for
preparation. Sample representativity was
ensured by close supervision of the drilling
and sampling process by a BBX geologist or
field technician. Core recoveries were
logged and recorded in the database. To
date overall recoveries for the diamond
holes were >98% and there were no core
loss issue or significant sample recovery
problems.
• The diamond drill samples were submitted
to the SGS laboratory in Vespasiano, greater
Belo Horizonte for crushing and
pulverisation and subsequently freighted to
the BBX´s laboratory in Catalão, Goiás.
• The coarse rejects (75% < 3mm) of the DD
stored at Catalão were shipped back to SGS
in Vespasiano for the ammonium sulphate
leach assay.
• The homogenized coarse rejects from each
interval, were used to make the composite,
then homogenized to generate the
composite air freighted to CETEM.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Item
JORC code explanation
Comments
problems.
Unusual
commodities
or
mineralisation types (eg
submarine nodules) may
warrant disclosure of
detailed information.
Drilling
Techniques
Drill Sample
Recovery
• Drill type (eg core, reverse
circulation,
open-hole
hammer, rotary air blast,
auger, Bangka, sonic, etc)
and details (eg core
diameter,
triple
or
standard tube, depth of
diamond
tails,
facesampling bit or other type,
whether core is oriented
and if so, by what method,
etc).
• The diamond drilling was conducted using
an EDG S11 mobile rig supplied by Energold
Ltd. Drilling diameter was all in NTW which
is equivalent to NQ. Core was not oriented,
and it was not directionally surveyed.
• Method of recording and
assessing core and chip
sample recoveries and
results assessed.
• Diamond recovery was logged by the onsite geologist by carefully comparing the
length of core recovered with the length of
the drilling run, as part of the routine core
logging process
• Measures
taken
to
maximise sample recovery
and ensure representative
nature of the samples.
• Whether a relationship
exists between sample
recovery and grade and
whether sample bias may
have occurred due to
preferential loss/gain of
fine/coarse material.
Logging
• Whether core and chip
samples
have
been
geologically
and
geotechnically logged to a
level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
• Whether
logging
is
qualitative or quantitative
in nature. Core (or costean,
channel, etc) photography.
• Drilling was conducted slowly in the soil
profile to maximize recovery and ensure
sample representativity. The upper section
of the hole was cased.
• No relationship was perceived between
sample recovery and assay results.
• Detail geological logging of the DD drilling
has been conducted by an experienced
geologist to a high level of detail recording
various qualitative parameters such as rock
type, mineralogy, colour, texture and
oxidation.
• The DD core was geologically logged using
predefined lithological, mineralogical, and
physical characteristics (colour, weathering,
fracture density and type, etc). Logging was
predominantly qualitative in nature.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Item
JORC code explanation
Comments
• The total length and
percentage of the relevant
intersections logged.
• 100% of the recovered intervals were
geologically logged.
• All diamond core has been photographed,
prior to cutting, wet and dry.
• Geological logging for the RC drilling has
been completed by an experienced
geologist to a high level of detail.
• Logging is qualitative in nature.
SubSampling
Techniques
and
Sampling
Procedures
• If core, whether cut or
sawn and whether quarter,
half or all core taken.
• If
non-core,
whether
riffled, tube sampled,
rotary split, etc and
whether sampled wet or
dry.
• For all sample types, the
nature,
quality
and
appropriateness of the
sample
preparation
technique.
• Quality control procedures
adopted for all subsampling
stages
to
maximise representativity
of samples.
• Diamond core was half core sampled, at all
times sampling the same side of the core,
with the exception of the ¼ core submitted
for whole rock analysis.
• Sample preparation for the DD drilling was
conducted at SGS Vespasiano (greater Belo
Horizonte) comprising oven drying,
crushing of entire sample to 75% < 3mm
followed by rotary splitting and
pulverisation of 250 to 300 grams at 95%
minus 150#
• The <3mm rejects and the 250-300 grams
pulverised sample were returned to BBX for
storage.
• The composite sample was generated
using the coarse rejects from each
weighted sample interval.
• Measures taken to ensure
that the sampling is
representative of the insitu material collected,
including for instance
results
for
field
duplicate/second-half
sampling.
• Whether sample sizes are
appropriate to the grain
size of the material being
sampled.
Quality of
Assay Data
and
Laboratory
Tests
• The nature, quality and
appropriateness of the
assaying and laboratory
procedures used and
whether the technique is
considered partial or total.
• The 75% < 3mm rejects for DD stored at
Catalão were returned to SGS Vespasiano to
assay for REE and other elements, as well as
the different representative granulometric
samples from the composite, generated at
CETEM.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Item
JORC code explanation
Comments
• For geophysical tools,
spectrometers, handheld
XRF instruments, etc, the
parameters
used
in
determining the analysis
including instrument make
and model, reading times,
calibrations factors applied
and their derivation, etc.
• The ammonium sulphate leach assay
technique used for REE was a 2%
ammonium sulphate leach with ICPOES/MS
reading (SGS code ICM655). This is a
recognised industry standard analysis
technique for ionic REE suite and associated
elements amenable to be leached.
Elements analysed at ppm levels:
• Nature of quality control
procedures adopted (eg
standards,
blanks,
duplicates,
external
laboratory checks) and
whether acceptable levels
of accuracy (ie lack of bias)
and precision have been
established
Ag
Ca
Er
Ho
Mo
Pt
Sm
Tm
Al
Cd
Eu
In
Na
Rb
Sn
U
As
Ce
Fe
K
Nb
Re
Sr
V
Au
Co
Ga
La
Ni
S
Ta
W
B
Cr
Gd
Li
P
Sb
Tb
Y
Ba
Cs
Ge
Lu
Pb
Sc
Te
Yb
Be
Cu
Hf
Mg
Pd
Se
Th
Zn
Bi
Dy
Hg
Mn
Pr
Si
Ti
Zr
The sample, comprising dominantly clay
minerals , was assayed without
pulverization, 50 grams are mixed with 80
ml of 2% ammonium sulphate 2% during 20
minutes.
The pulp is filtered and the reject washed
with distilled water.
An aliquot of the solution is extracted and
diluted 25 times with HNO3 2%. The
solution is analysed by ICP-MS.
The sample preparation and assay
techniques used are industry standard and
provide partial analysis; total analysis is
achieved with the lithium metaborate
fusion.
• The SGS laboratory used for the RRE assays
is ISO 9001 and 14001 and 17025
accredited.
• Analytical Standards for REE
ITAK-705 was used as CRM material in the
batches sent to SGS.
The assay results for the standards were
consistent with the certified levels of
accuracy and precision and no bias is
evident.
• Blanks
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Item
JORC code explanation
Comments
The blanks used contain some REE, with
critical elements Ce, Nd, Dy and Y present in
small quantities.
• Duplicates
Duplicate samples were allocated separate
sample numbers and submitted with the
same analytical batch as the primary
sample. Variability between duplicate
results is considered acceptable and no
sampling bias is evident.
• Laboratory inserted standards, blanks and
duplicates were analysed as per industry
standard practise. There is no evidence of
bias from these results.
•
Verification
of Sampling
and
Assaying
All assays for the metallurgical results were
carried out by ICP/OES at CETEM, with all
values quoted as elemental REEs, not
converted to the oxide form.
• The
verification
of
significant intersections by
either independent or
alternative
company
personnel.
• Apart from the routine QA/QC procedures
by the company and the laboratory, there
was no other independent or alternative
verification of sampling and assaying
procedures.
• The use of twinned holes.
• Analytical results for REE were supplied
digitally, directly from SGS laboratory
facility in Vespasiano to the BBX´s
Exploration Manager in Rio de Janeiro.
• Documentation of primary
data,
data
entry
procedures,
data
verification, data storage
(physical and electronic)
protocols.
• Discuss any adjustment to
assay data.
• The metallurgical report was sent directly to
BBX´s Exploration Manager in Rio de
Janeiro.
• No twinned holes were used.
• Geological data was logged into paper and
transferred to Excel spreadsheets at end of
the day and then transfer into the drill hole
database. Microsoft Access is used for
database storage and management and
incorporates numerous data validation and
data validation and integrity checks. All
assay data is imported directly into the
Microsoft Access database.
• No adjustments were made to the data.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Item
JORC code explanation
Comments
• All REE assay data received from the
laboratory in element form is unadjusted
for data entry.
Location of
Data Points
• Accuracy and quality of
surveys used to locate drill
holes (collar and downhole surveys), trenches,
mine workings and other
locations used in Mineral
Resource estimation.
• The UTM WGS84 zone 21S grid datum is
used for current reporting. The drill holes
collar coordinates for the holes reported
are currently controlled by hand-held GPS.
• Specification of the grid
system used.
• Quality and adequacy of
topographic control.
Data
Spacing and
Distribution
• Data spacing for reporting
of Exploration Results.
• Whether the data spacing
and
distribution
is
sufficient to establish the
degree of geological and
grade
continuity
appropriate
for
the
Mineral Resource and Ore
Reserve
estimation
procedure(s)
and
classifications applied.
• Whether
compositing
applied.
Orientation
of Data in
relation to
Geological
Structure
• Drilling in this target is typically with holes
200m to 800m apart, over the felsic
volcanics mapped.
• This announcement refers to metallurgical
test work for ionic Rare Earth Elements, no
representation
of
extensions,
extrapolations or otherwise continuity of
grade are made.
• The DD samples are from intervals of 1.00m
up to 4.00m, but nominal length of 2.00m;
no compositing was applied.
sample
has been
• Whether the orientation of
sampling
achieves
unbiased sampling of
possible structures and the
extent to which this is
known, considering the
deposit type.
• If the relationship between
the drilling orientation and
the orientation of key
mineralised structures is
considered
to
have
introduced a sampling bias,
this should be assessed and
reported if material.
• The location and orientation of the DD
drilling in the Ema project is appropriate
given the strike and morphology of the
mapped felsic and gabbro units.
• Relevant REE mineralisation intersected is
interpreted to be in a flat-lying weathered
profile including cover soil, clay transition to
saprolite and saprock.
• Below the saprock are fresh rhyolites,
ignimbrites and mafic rocks.
• All drill holes are vertical which is
appropriate for horizontal mineralised
zones in the regolith profile.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Item
Sample
security
Audit
or
Reviews
JORC code explanation
Comments
• The measures taken to
ensure sample security.
• The DD samples, in sealed plastic bags, were
kept in a locked room until shipped to back
to SGS for REE assays and subsequently to
CETEM for the metallurgical test. The
Company has no reason to believe that
sample security poses a material risk to the
integrity of the assay data.
• The results of any audits or
reviews
of
sampling
techniques and data.
• The sampling techniques and data have
been reviewed by the Competent Person
and are found to be of industry standard.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
JORC (2012) Table 1 - Section 2: Reporting of Exploration Results
Criteria
JORC code explanation
Mineral
Tenement and
Land Tenure
Status
• Type, reference name/number,
location
and
ownership
including
agreements
or
material issues with third
parties such as joint ventures,
partnerships,
overriding
royalties, native title interests,
historical sites, wilderness or
national
park
and
environmental settings.
Commentary
• The Ema lease is 100% owned by
BBX with no issues in respect to
native title interests, historical
sites, wilderness or national park
and environmental settings.
• The company is not aware of any
impediment to obtain a licence to
operate in the area.
• The security of the tenure held
at the time of reporting along
with any known impediments
to obtaining a licence to
operate in the area.
Exploration
done by Other
Parties
Geology
• Acknowledgment and appraisal
of exploration by other parties.
• No exploration by other parties has
been conducted in the region.
• Deposit type, geological setting
and style of mineralisation.
• The REE mineralisation is contained
within the tropical lateritic
weathering profile developed on
top of rhyolites, ignimbrites and
mafic rocks potentially derived
from the underlying rocks as
described for the Chinese iREE
deposits.
• The
REE
mineralization
is
concentrated in the weathered
profile where it has dissolved from
the primary mineral form, such as
monazite and xenotime, then
adsorbed on to the neo-forming
fine particles of aluminosilicates
clays (e.g. kaolinite, illite, smectite).
• This adsorbed REE is the target for
extraction and production of REO.
Drill
Hole
Information
• A summary of all information
material to the understanding
of the exploration results
including a tabulation of the
following information for all
Material drill holes:
• Drillhole locations and diagrams are
presented in this announcement.
• All drill-holes are vertical. The cores
were not oriented and did not have
a down-hole survey.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Criteria
JORC code explanation
•
easting and northing of
the drill hole collar
•
elevation
or
RL
(Reduced Level –
elevation above sea
level in metres) of the
drill hole collar
•
dip and azimuth of the
hole
•
down hole length and
interception depth
•
hole length.
Commentary
• Details are tabulated
announcement.
in
the
• If the exclusion of this
information is justified on the
basis that the information is not
Material and this exclusion
does not detract from the
understanding of the report,
the Competent Person should
clearly explain why this is the
case.
• In
reporting
Exploration
Results, weighting averaging
techniques, maximum and/or
minimum grade truncations (eg
cutting of high grades) and cutoff grades are usually Material
and should be stated.
Data
aggregation
methods
• Where aggregate intercepts
incorporate short lengths of
high grade results and longer
lengths of low grade results, the
procedure used for such
aggregation should be stated
and some typical examples of
such aggregations should be
shown in detail.
• Aggregate intercepts were not
reported in this announcement but
initially were calculated for the REO
(Rare Earth Oxides) based on a cutoff grade of 200ppm TREO (Total
Rare Earth Oxides) minus Ce2O,
with a maximum 2 meters for
internal dilution.
• Significant intervals were tabulated
downhole for reporting. All
individual samples were included in
length-weighted averaging over the
entire tabulated range.
• No metal equivalent values have
been reported.
• The assumptions used for any
reporting of metal equivalent
values should be clearly stated.
Relationship
between
mineralization
widths
and
• These
relationships
are
particularly important in the
reporting
of
Exploration
Results.
• Relevant mineralisation of REE was
intercepted as reported with
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Criteria
JORC code explanation
intercepted
lengths
• If the geometry of the
mineralisation with respect to
the drill hole angle is known, its
nature should be reported.
Commentary
thicknesses approximating true
width due to the flat geometry.
• If it is not known and only the
down hole lengths are
reported, there should be a
clear statement to this effect
(eg ‘down hole length, true
width not known’).
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Further Work
• Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included
for any significant discovery
being reported These should
include, but not be limited to a
plan view of drill hole collar
locations and appropriate
sectional views.
• Drillhole locations and diagrams are
presented in this announcement.
• Where
comprehensive
reporting of all Exploration
Results is not practicable,
representative reporting of
both low and high grades
and/or widths should be
practiced to avoid misleading
reporting
of
Exploration
Results.
• Relevant results for ionic REE
mineralisation is reported after test
with ammonium sulphate leach,
conducted at CETEM.
• Other exploration data, if
meaningful
and
material,
should be reported including
(but not limited to): geological
observations;
geophysical
survey results; geochemical
survey results; bulk samples –
size and method of treatment;
metallurgical test results; bulk
density,
groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious or contaminating
substances.
• No other significant exploration
data has been acquired by the
Company.
• The nature and scale of planned
further work (eg tests for lateral
extensions or depth extensions
or large-scale step-out drilling).
• Proceed with an MRE and select a
representative sample for follow up
metallurgical tests.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Riccardo Marinho, 360, Sala 113, Barra da Tijuca, Rio de Janeiro T +55 21 2439 57
Criteria
JORC code explanation
Commentary
• Diagrams clearly highlighting
the
areas
of
possible
extensions, including the main
geological interpretations and
future drilling areas, provided
this information is not
commercially sensitive.
Brazilian Critical Minerals Ltd (ABN: 82 089 221 634)
AUS: Brookfield Place, Level 11, 125 St Georges Terrace, Perth WA 6000 T +61 8 6383 7820
BRA: Av Jornalista Ri
Share your feedback
Discover